| 1) |
Location |
UBDC Hydel Channel Stage-III will take off
at RD 65000 (left) of UBDC Main & will our fall into River Beas Down
Stream Shally Pattan |
| 2) |
Main Features: |
- Generation of Stage-I & II shall increased.
- Two Power Houses shall be set up giving additional Installed Capacity
of 75 MUs.
|
| 3) |
No. of Power Houses.
|
2 |
| 4) |
No. of Units: |
For PH-I = 3 Units
For PH-II = 2 Units |
| 5) |
Total generating capacity |
3x15 + 2x15 = 75 MW |
| 6) |
Gross Head: |
For PH -I = 17.03 M
For PH-II = 23.195 M |
| 7) |
Design Discharge: |
For Phase -1
- UBDC Stage Escape Channel =9325 cusecs
- Carrier Channel =6888 cusecs
For Phase II:
- Alternative Irrigation Channel =272 Cusecs to 43.76
For Phase III:
- UBDC Hydel Channel Stage-III = 13245 Cusecs
|
| 8) |
Type of Development |
Run off River |
| 9) |
Commissioning: |
2007-08 |
| 10) |
Cost of Project: |
Rs. 670 Crore (5/2000) |
| 11) |
Total Energy Contribution Annually |
472.47 Mus. |
| 12) |
Cost per unit: |
Rs. 2.94 |
| 13) |
Cost of the Project: |
Rs. 670 Crore (5/2000) |