Tender Specification No : 83/CHP/CSMC/49, dated. 16-01-2012
Brief Description:
PSPCL is generating electricity at GHTP, Lehra Mohabbat Stage-I comprising of two units of 210 MW and Stage-II of two units of 250 MW. Present tender is invited for the following works:
Annual Mtc. Contract for repair of Conveyor belts & Pulleys Lagging at coal handling plant for stage-I & II at GHTP, Lehra Mohabat.
Hiring of one No. Tata Sumo/Tata Spacio/Tata Victa//Qualis/Tavera (Diesel) or equivalent. Vehicle for one year from dated 01/03/2012, Model not earlier than 2009.
Annual repair contract for repair and dynamic balancing of Condensate Extraction pump assembly by replacing all wearing parts and to resizing other worn out parts to original size. Specifications of pumps are:
M/s BHEL make CEP pump, Capacity-160M3/hr, Manometer Head-215 MWC
RPM-1480, Model-150CJNV (No. of stages-6)
Labour part of the various works of Providing T/W Connection, GSC, ISC, deposit works, system improvement works or any other misc. jobs as directed by Engineer Incharge. For the Financial Year 2012-13. Works upto 31/03/2013.
Under DS Division Lalru
(Sub-Division: Lalru , Dera-Bassi, Handesra)
Labour part of the various works of Providing T/W Connection, GSC, ISC, deposit works, system improvement works or any other misc. jobs as directed by Engineer Incharge. For the financial Year 2012-13. Works upto 31/03/2013.Under DS Division Zirakpur
(Sub-Division:- Zirakpur, Sohana, Banur)
Labour part of the various works of Providing T/W Connection, GSC, ISC, deposit works, system improvement works or any other misc. jobs as directed by Engineer Incharge. For the Financial Year 2012-13. Works upto 31/03/2013.
Under DS Division Mohali
(Sub-Division:-Tech.-1 Mohali,Tech.-2 Mohali, Mullanpur Garibdass).
Description of works to be carried out during the year 2011-12 by (under Operation Circle, Nawanshahar i.e. Operation Divisions Nawanshahar) on the Labour Rate basis (Material to be supplied by PSPCL)
1. Construction of new LT/HT lines/ Deloading of feeders and Deloading of transformers etc.
2. Release of new connections of different categories.
3. System improvement works.
4. Conversion of 3 phase 4 wire to 3 phase 3 wire system.
5. Deposit estimate & shifting of meters in the Pillar Boxes at labour rate fixed by the Powercom.
Note: - The rates of works to be carried out should quoted PSPCL Schedule rates + Premium. The estimated amount could be decreased/ increased.