U.B.D.C POWER HOUSES, STAGE-I & II (91.35 MW)
Upper Bari Doab Canal Hydro Electric Project (UBDC) is located near Pathankot falling in the district of Gurdaspur in Punjab. The Power station is situated on the Upper Bari Doab Canal, which draws water from river Ravi for the dual purpose of Irrigation and Power generation. Water of river Ravi passes through Ranjit Sagar Dam at Thein before entering into UBDC Canal. At present, UBDC Project comprises of two stages of Hydro Power stations i.e. Stage-I and Stage-II. Stage-I Project consisting of three Power Houses namely I,II & III each having a generating unit of 15 MW was erected and commissioned during 1971-73. Stage –II of UBDC Project consisting of three additional Power Houses namely I,II&III each having a generating unit of 15.45 MW was erected and commissioned during 1989-92. As such UBDC Hydro Electric Project has a total installed capacity of 91.35 MW.
The Power Houses are situated at different reduced distances (RD’s) of the channel and located as mentioned below: -
Sr. No. |
Description |
UBDC Stage-I |
UBDC Stage-II |
1. |
Capacity |
3X15 = 45 MW |
3X15.45 = 46.35 |
2. |
RD |
PH-I 13500 ft.
PH-II 24750 ft.
PH-III 40000 ft. |
PH-I 13500 ft.
PH-II 24750 ft.
PH-III 40000 ft. |
3. |
Location |
PH-I Ferozepur
PH-II Sujanpur
PH-III Sarna |
PH-I Ferozepur
PH-II Sujanpur
PH-III Sarna |
Salient features of the UBDC Project are given as under: -
Sr. No. |
Description of the generating units |
UBDC Stage-I |
UBDC Stage-II |
1. |
Rating of each unit |
15 MW |
15.45 MW |
2. |
No. of units of each PH |
3 Nos. |
3 Nos. |
3. |
Manufacturer |
1 No. AEI (UK)
2 No. HEL |
3 No. BHEL |
4. |
Turbine out put |
21000 HP |
21340 HP |
5. |
Max Net Head |
18.3 M |
18.3 M |
6. |
Min. Net Head |
14.8 M |
14.8 M |
7. |
Rated Net Head |
17.1 M |
17.1 M |
8. |
Discharge required per m/c for max. Generation |
3625 Cs |
3625 Cs |
9. |
Type of turbine |
KAPLAN |
KAPLAN |
10. |
No. of Blades |
6 |
4 |
11. |
Dia of Runner |
3962 mm |
3900 mm |
12. |
Generator Voltage |
11000 Volts |
11000 Volts |
13. |
Type of Generator |
Vertical Shaft |
Vertical Shaft |
14. |
Normal speed |
150 RPM |
166.7 RPM |
15. |
Direction of Rotation |
Clock wise |
Clock wise |
The commissioning dates of UBDC PHs are given below :-
Stage-I Power Houses |
Power House No. 1. |
30.08.1971 |
Power House No. 2. |
24.05.1972 |
Power House No. 3. |
12.04.1973 |
Stage-II Power Houses |
Power House No. 1. |
06.08.1989 |
Power House No. 2. |
26.06.1991 |
Power House No. 3. |
01.01.1992 |
P.S.E.B has incurred an expenditure of 17.41 crores through Pb. Irrigation department for re-modelling of escape channel at RD- 72720 to enhance its capacity from 1500 Cusses to 7200 Cusses. This work has been completed in 7/2004. This has enabled PSEB to have extra generation from UBDC PHs by enabling the inflow through the Hydel Channel during the lean period even when Irrigation Indent is Nil. This is evident with the generation of 217 MU during the current year from April to July. As such the total generation during the year 2005-2006 is likely to be about 450 MU.
A scheme for renovation and modernization of UBDC PHs during the 10th five year plan has been approved by the Board costing to Rs.789/-lac. An amount of Appx.Rs.150 lac has been already spent. This will help in smooth running of the generating units by replacement of the old and worn out equipment.
Residual life Assessment of UBDC PHs Stage-I, having completing more than 30 years, has since been got carried out from M/S BHEL. Recommendations of RLA Studies is under consideration and after implementation, the life of Stage-I PHs shall be enhanced considerably.
GENERATION ACHEIVEMENTS (In MUs):
Year |
Actual Generation (In MUs) |
UBDC Stage-I |
UBDC Stage-II |
Total Generation
(in MU's.) |
1988-89 |
206.51 |
- |
206.51 |
1989-90 |
198.30 |
2.57 |
200.87 |
1990-91 |
152.91 |
47.82 |
200.73 |
1991-92 |
178.16 |
74.72 |
252.88 |
1992-93 |
144.83 |
122.81 |
267.64 |
1993-94 |
126.07 |
128.50 |
254.57 |
1994-95 |
133.75 |
154.00 |
287.75 |
1995-96 |
114.28 |
154.87 |
269.15 |
1996-97 |
131.84 |
142.37 |
274.21 |
1997-98 |
85.80 |
120.97 |
206.77 |
1998-99 |
131.07 |
124.83 |
255.90 |
1999-2000 |
137.35 |
181.42 |
318.77 |
2000-01 |
155.89 |
190.16 |
346.05 |
2001-02 |
114.11 |
206.28 |
320.39 |
2002-03 |
168.90 |
224.87 |
393.77 |
2003-04 |
190.90 |
236.54 |
427.44 |
2004-05 |
171.27 |
208.40 |
379.67 |
2005-06 |
250.14 |
280.49 |
530.63 |
2006-07 |
158.711 |
225.891 |
384.602 |
Note: UBDC Stage-I&II Project has achieved the record generation of 530.62 MUs in the year 2005-06 since its commissioning. |