U.B.D.C POWER HOUSES, STAGE-I & II (91.35 MW)

Upper Bari Doab Canal Hydro Electric Project (UBDC) is located near Pathankot falling in the district of Gurdaspur in Punjab. The Power station is situated on the Upper Bari Doab Canal, which draws water from river Ravi for the dual purpose of Irrigation and Power generation. Water of river Ravi passes through Ranjit Sagar Dam at Thein before entering into UBDC Canal. At present, UBDC Project comprises of two stages of Hydro Power stations i.e. Stage-I and Stage-II. Stage-I Project consisting of three Power Houses namely I,II & III each having a generating unit of 15 MW was erected and commissioned during 1971-73. Stage –II of UBDC Project consisting of three additional Power Houses namely I,II&III each having a generating unit of 15.45 MW was erected and commissioned during 1989-92. As such UBDC Hydro Electric Project has a total installed capacity of 91.35 MW.

The Power Houses are situated at different reduced distances (RD’s) of the channel and located as mentioned below: -

Sr. No.

Description

UBDC Stage-I

UBDC Stage-II

1.

Capacity

3X15 = 45 MW

3X15.45 = 46.35

2.

RD

PH-I 13500 ft.
PH-II 24750 ft.
PH-III 40000 ft.

PH-I 13500 ft.
PH-II 24750 ft.
PH-III 40000 ft.

3.

Location

PH-I Ferozepur
PH-II Sujanpur
PH-III Sarna

PH-I Ferozepur
PH-II Sujanpur
PH-III Sarna

 Salient features of the UBDC Project are given as under: -

Sr. No.

Description of the generating units

UBDC Stage-I

UBDC Stage-II

1.

Rating of each unit

15 MW

15.45 MW

2.

No. of units of each PH

3 Nos.

3 Nos.

3.

Manufacturer

1 No. AEI (UK)
2 No. HEL

3 No. BHEL

4.

Turbine out put

21000 HP

21340 HP

5.

Max Net Head

18.3 M

18.3 M

6.

Min. Net Head

14.8 M

14.8 M

7.

Rated Net Head

17.1 M

17.1 M

8.

Discharge required per m/c for max. Generation

3625 Cs

3625 Cs

9.

Type of turbine

KAPLAN

KAPLAN

10.

No. of Blades

6

4

11.

Dia of Runner

3962 mm

3900 mm

12.

Generator Voltage

11000 Volts

11000 Volts

13.

Type of Generator

Vertical Shaft

Vertical Shaft

14.

Normal speed

150 RPM

166.7 RPM

15.

Direction of Rotation

Clock wise

Clock wise

The commissioning dates of UBDC PHs are given below :-

Stage-I Power Houses

Power House No. 1.

30.08.1971

Power House No. 2.

24.05.1972

Power House No. 3.

12.04.1973

Stage-II Power Houses

Power House No. 1.

06.08.1989

Power House No. 2.

26.06.1991

Power House No. 3.

01.01.1992

P.S.E.B has incurred an expenditure of 17.41 crores through Pb. Irrigation department for re-modelling of escape channel at RD- 72720 to enhance its capacity from 1500 Cusses  to 7200 Cusses. This work has been completed in 7/2004. This has enabled PSEB to have extra generation from UBDC PHs by enabling the inflow through the Hydel Channel during the lean  period even when Irrigation Indent is Nil. This is evident with the generation of 217 MU during the current   year from April to July. As such the total generation during the year 2005-2006 is likely to be about 450 MU.

A scheme for renovation and modernization of UBDC PHs during the 10th five year plan has been approved by the Board costing to Rs.789/-lac. An amount of Appx.Rs.150 lac has been already spent. This will help in smooth running of the generating units by replacement of the old and worn out equipment.

Residual life Assessment of UBDC PHs Stage-I, having completing more than 30 years, has since been got carried out from M/S BHEL. Recommendations of RLA Studies is under consideration and after implementation, the life of Stage-I PHs shall be enhanced considerably.

GENERATION ACHEIVEMENTS (In MUs):

Year

Actual Generation (In MUs)

UBDC Stage-I

UBDC Stage-II

Total Generation       
(in MU's.)

1988-89

206.51 - 206.51

1989-90

198.30 2.57 200.87

1990-91

152.91 47.82 200.73

1991-92

178.16 74.72 252.88

1992-93

144.83 122.81 267.64

1993-94

126.07 128.50 254.57

1994-95

133.75 154.00 287.75

1995-96

114.28 154.87 269.15

1996-97

131.84 142.37 274.21

1997-98

85.80 120.97 206.77

1998-99

131.07 124.83 255.90

1999-2000

137.35 181.42 318.77

2000-01

155.89 190.16 346.05

2001-02

114.11 206.28 320.39

2002-03

168.90 224.87 393.77

2003-04

190.90 236.54 427.44

2004-05

171.27 208.40 379.67

2005-06

250.14 280.49 530.63

2006-07

158.711 225.891 384.602

Note: UBDC Stage-I&II Project has achieved the record generation of 530.62 MUs in the year 2005-06 since its commissioning.