• Application by DS/NRS applicants to be made on composite Application
& Agreement form (CS-1A) obtainable from local office.
• For loads upto 10 KW single phase connection and for loads above 10
KW Three Phase connections are released.
• Application for industrial, Bulk & Agricultural connections up
to 100KW can be made on composite Application & Agreement(A&A) form
CS-1. 2 copies of form are required.
• For loads above 100 KW, 3 sets of agreements in Form CS-1 (HT/EHT)
are to be submitted.
Supply is given at 400 volts for loads up to 100 KW.
• For higher loads, the supply voltages are:-
- Contract demand up to 2500 KVA 11 KV
(Contract demand above 2500 KVA and up to 4000
KVA can be catered at 11KV with 10% extra billing)
- exceeding the above limit and up to 20 MVA 33/66
KV
- exceeding 20 MVA and up to 35 MVA 66/132 KV
- exceeding 35 MVA shall be catered 132/220 KV
- Bulk Supply consumers upto 5MW 11 KV
- Bulk Supply consumers above 5MW 33KV & above
• Industrial & BS consumers with load above 500KW/500KVA are to register
requisition in the office of SE/Op in form CS1(R) alongwith earnest money @
RS.100/KW for feasibility clearance & then regular A&A forms are accepted.
• Application accepted with Advance Consumption Deposit at the following
rates(per KW or part thereof):-
| Domestic Supply | : | Rs.500 |
| Non Residential Supply | : | Rs.700 |
| Small Power | : | Rs.500 |
| Medium Supply | : | Rs.750 |
| Large Supply | : |
| (i) General Category | : | Rs.1000 |
| (ii) Power Intensive | : | Rs.1500 |
| Bulk Supply | : | Rs.1500 |
| Public Lighting | : | Rs.2000 |
| Agriculture Power | : | Rs.200 per BHP |
• In case of Large Supply consumers ACD is recovered
as under:-
1. For Load up
to 1000 KW: in 2 equal Instalments, one with application
form and other through demand notice.
2. For loads above
1000 KW and up to 2000 KW : in 2 instalments first 25%(but not less than
the first Instalment for 1000 KW) and balance 75% through demand notice.
3. For loads above
2000 KW: in 2 Instalments, first 20%(but not less then the first Instalment
for 1000 KW) and balance 80% through demand notice.
• No interest shall be payable on ACD.
• Security for energy Meter (applicable wef 10/8/2000):
The amount recoverable against Meter/Metering equipment
belonging to PSEB is termed as meter security deposit on which interest at the
rate of 6% per annum shall be payable provided the amount of meter security
deposit is Rs,100/- or more.
| 1.
|
LT Single Phase
Energy Meter
(a) Electro-mechanical Type
(b) Electronic Type
|
:
:
|
Rs.600/-
Rs.600/-
|
| 2.
|
LT Three Phase
Poly Phase Meters without CTs
(a) Electro-mechanical Type
(b) Static/Electronic Type
|
:
:
|
Rs.800/-
Rs.1500/-
|
| 3.
|
LT Three Phase
CT meters (without CTs)
(a) Electro-mechanical Type
(b) Static/Electronic Type
|
:
:
|
Rs.1,000/-
Rs.4,000/-
|
| 4.
|
LT/TPT Metering
equipment (without CTs.)
(a) Electro-mechanical Type
(b) Static/Electronic Type
|
:
:
|
Rs.7,500/-
Rs.15,000/-
|
| 5,
|
HT/TPT metering
equipment (E/M)
without CTs/PTs units other than L&G make
|
:
|
Rs.8,000/-
|
| 6.
|
HT/TPT Solid
State metering equipment
without CTs/PTs units.
|
:
|
Rs.10,000/-
|
| 7.
|
L.T.-C.Ts
(a) 50/5A
(b) 100/5, 150/5, 200/5, 300/5, 400/5 A
|
:
:
|
Rs.800/-
Rs.400/-
|
| 8.
|
HT-CT/PT Unit
|
:
|
Rs.25,000/-
|
• Load sanctioning authorities:-
| |
AE/AEE/XEN(Ops)
|
:
|
Loads up to 99
KW at low, medium and high voltage
|
| |
Sr.XEN/ASE(Ops.)
|
:
|
Exceeding 99 kw
and up to 1000 KW including load of an in-house induction furnace up to
500 KW at Medium & High Tension Supply voltage.
|
| |
Superintending
Engineer(Ops.)
|
:
|
Exceeding 1000
KW & up to 2 MW high voltage except for power intensive industries.
|
| |
C.E./Commercial
|
:
|
Above 2 MW at high/extra
high voltage.
Consumers having a separate source of electricity
at their premises. For power intensive industries irrespective of
quantum of load except small in-house furnaces up to 500 KW for captive
use for which sanction can be accorded by the field officers as per their
competency
|
• Demand Notices are issued (in Form CS-5) on first cum first served basis.
• All the terms & Conditions of Demand Notices are to be complied
with in 2/3 months.
• Service Connection Charges for the service line erected/augmented by
Board are as under:-
Domestic/NRS Supply:
| |
Fixed per KW
Charges
|
Domestic
|
NRS
|
| 1.
|
Up to 1 KW
|
Rs.250/-
|
Rs.250/-
|
| 2.
|
Above 1 KW and
Up to 3 KW
|
Rs.300/-
|
Rs.500/-
|
| 3.
|
Above 3 KW and
up to 7 KW
|
Rs.500/-
|
Rs.750/-
|
| 4.
|
Above 7 KW
|
Rs.750/-
|
Rs.1000/-
|
Variable Charges: No Variable charges are leviable up to 150 metres of
service line. Beyond 150 metres, variable charges @ Rs.125/- per shall
be recoverable.
Yellow Card Holders: They can pay the service connection charges in instalments
of Rs.10/- per month.
Domestic and Non-residential consumers falling under the following categories
have the option either to pay in lump sum the service connection charges as
mentioned under the preceding clause or to pay monthly service rentals @ 1.6
paise per rupee of the estimated cost of service line excluding the cost of
30.48 metres.
Application from 'Bet' Areas
Members of Scheduled Castes.
Applicants falling in sub-mountaneous area.
Applicants falling in 'A' category of border area.
The connections meant for religious and charitable institutions run by recognized/registered
associations or societies registered with Registrar of Societies.
• Industrial and Bulk Supply:
Load
Service Connection Charges
Up to 1000 KW Rs.750/-
per KW
Above 1 MW
Rs.750/- per KW or actual cost whichever is higher.
• Test report is to be submitted while complying with the demand notice.
• In case of DS/NRS consumers wiring contractor's test report is considered
as authentic and no verification is done to expedite the release of connection.
• Connections are released on the basis of seniority of test reports(first
come first served). |