SALIENT FEATURES OF VDS FOR DS/NRS
Ø
The Scheme is open up to 31.3.2004 to regularize the extension in load of DS/NRS
consumers
Ø
The computation of the total load for DS/NRS consumer shall be done as follows
and the consumer shall be required to fill Application & Agreement form
for the total load:-
| Description |
Domestic |
NRS |
Remarks |
| Light Point |
60 Watts each(1/2 of
total No.of light points to be taken into account) |
80 Watts each |
Fraction of light points
under DS category to be taken as one point. |
| Fan Points |
80 Watts each |
100 Watts each |
|
| Wall sockets |
60 Watts each (1/4 of
total No.of sockets to be taken into account). |
80 Watts each (1/3rd)of
total No.of sockets to be taken into account). |
Fraction of socket points
to be taken as one socket. |
| Power sockets |
1000 watts each (1/3rd
of total No.of sockets to be taken into account) |
2000 watts each(1/2 of
total No.of sockets to betaken into account). |
Fraction of socket to
be taken as one socket. |
The test report shall be prepared by JE/Incharge for the total load and the
same shall be kept in the consumer file. No test report shall be required to
be furnished by the consumer.
Additional load as declared by the consumer shall be deemed
to have been regularized from the date of submission of A&A forms and deposit
of ACD and Service Connection Charges at the rates given in preceding paras.
Ø
The total load(including unauthorized extension) shall be governed for the purpose
of regulating service connection charges in the specific slabs, but the actual
charges are to be recovered for the unauthorized load only.
Ø
Augmentation of service line/transformer and the power system including change
of meter etc. shall be done by the Board at its own cost.
Ø
The existing consumers already having separate connections in the same premises
shall be eligible to get extensions.
Ø
Regularisation of load under this scheme shall be done without recovering any
load surcharge. |