151. SUPPLY OF ELECTRICITY TO BOARD EMPLOYEES FOR RESIDENTIAL PURPOSE:

151.1 Like all other applicants the Board's employees have to apply for connection on the prescribed application form to the sub-division/sub-office of the Board. After observing the requisite formalities, the connection should be allowed on priority basis.  As in the case of other consumers, an account number in the name of employee shall be opened in the Consumer's ledger for rendering energy bills.

151.2 While vacating the residential quarter it is the duty of the concerned employee that the electric connection standing in his name is got disconnected, otherwise he will be personally responsible to pay for the electric energy consumed through the same meter by the subsequent occupant.  Wherever the subsequent occupant happens to be a Board employee, he(the new occupant) should also ensure immediately after taking possession of the house(if the connection has not been disconnected) to get the change of name effected in his name.

151.3 AE/AEE/XEN(Ops) may use his discretion to exempt the Board employee from depositing ACD/Meter Security against one Electric Connection under Domestic category.

152. BILLING AND RECORD OF ENERGYCONSUMED IN PSEB OFFICES/ WORKS:

152.1 In case of Board's works whether carried out departmentally or through contractor a connection shall be obtained by the concerned PSEB office in its own name and should invariably be given metered supply  so as to account for the energy consumption and the revenue thereof.

152.2 PSEB offices should be treated at par with other consumers so far as the application of commercial policies are concerned.  The electric connections of offices and works of the Board need to be checked by various operational officials and officers as also by vigilance and enforcement staff.

152.3 Whenever any of the PSEB office wants an electric connection for office use or for use on works an application on form CS-1, as the case may be, should be made.  The application should be signed in the case of a sub-office by the AAE Incharge or AE.AEE.XEN in case of a sub-division by the Sr.XEN/ASE/SE/CE or any of his subordinate officer for divisional/circle/CE's office.  In short connection shall be applied by the officer Incharge of the office or an officer subordinate to him but not below the rank of AE or any equivalent rank.  In case of departmental connections there will be no necessity of depositing ACD/Meter Security and the signature of the officer/official making the application are not required to be attested by any witness. However, the applicant will put his official designation stamp under his signatures.

152.4 On the receipt of the application the estimate shall be framed and got sanctioned most expeditiously from the concerned authorities.  In this case the formalities of issuing a demand notice or asking for a test report need not be observed and service connection orders may straightway be issued after  the estimate has been sanctioned.  The revenue Accountant/Assistant Revenue Accountant will allot the account no. so that billing maybe done immediately after the connection has been released. As in the case of other consumers meters installed in the office as well as on PSEB works will be duly sealed by the concerned officer/official and in the event of seals being found non-existing, sealing charges as provided in the schedule of General and Service Connection Charges will be recoverable.

152.5 Schedule' NRS-Non Residential Supply" of PSEB tariff shall be applicable to all the PSEB offices.  The tariff applicable to the PSEB works whether carried out departmentally or through contractors shall be the relevant industrial tariff(as applicable to permanent connection) depending upon the connected load.  The revenue should be assessed and realized as per procedure laid down for other consumers.  The payment of the bills for the Board's offices and works should be adjusted through transfer entries as per the usual practice according to Commercial Accounting Cell Circular No.8/99.  The electricity consumed in the rest house/guest house/shelter huts should be booked to the maintenance of the concerned rest house/guest house etc.

152.6 No electricity duty is leviable on electricity consumed in the PSEB offices and the works carried out departmentally  Where PSEB works are executed through contractors, electricity duty is not leviable on the energy consumed on such work of PSEB but the electricity bill is to be paid by the contractor excepting when there is a specific provision in the contract that the energy is to be supplied to the contractor by PSEB free of cost.

152.7 Electricity consumed in the offices/works will be duly accounted for, but the revenue realized on this score will not be the real revenue earned by PSEB.  It is, therefore, essential that while sending the revenue statements, the amount of realization and the number of units consumed on PSEB offices/works may be separately indicated so that a record of the consumption and revenue involved may be separately kept and the actual revenue realised  is computed.

152.8 In case of such offices where the buildings have been taken on hire and the connection is in the name of the land lord/lady, the officer Incharge of such offices should inform the AE/AEE/XEN(Ops) accordingly.  Regular bills should continue to be raised and the office utilizing the private building should make the payment in cash/by cheque till such time the building remains under the possession of PSEB.

152.9 Connection on Board works in the name of Contractors: In such cases where works are being got carried out through contractors and energy is to be consumed on such works, connections should be released in the name of the contractor and the bill should also be sent to the contractor.  In the event of non payment of the bill a 10 days notice should be given to the concerned AE/AEE/XEN under whom the workis being carried out.  In case the concerned AE.AEE/XEN is unable to get the payment made from the contractor, the connection maybe disconnected and the outstanding amount recovered from the security deposited by the contractor.

153 SUPPLY CHARGES IN CASE OF BOARD EMPLOYEES:

153.1 Like other consumers Schedule 'DS' is applicable to Board employees but as a matter of concession, all employees irrespective of their posting shall be allowed free electricity for domestic use up to the extent mentioned below:-

                        Sr.No. Basic Pay Range Unit per month

                        1. Pay up to 6000/- 100

                        2. Pay exceeding Rs.6000 but not exceeding Rs.10,500/- 125

                        3. Pay exceeding Rs10,500/- 155

153.2 The units of free electricity concession to respective categories of employees shall first be deducted from the total consumption and the remaining units shall be billed as per tariff applicable.

153.3 Electricity duty shall continue to be charged from the employees as heretofore unless its levy is exempted by the State Govt.

153.4 The above concessions shall only be applicable in the following cases:-

153.4.1 If the connection of the house in which the Board employee resides is held in his name and he is the sole occupant of the premises.

153.4.2 In case the connection stands in the name of some one else(say landlord) but is occupied solely by the Board's employee, he should be allowed the benefit of concession after obtaining a half yearly certificate from the employee that he is residing in the premises and the energy has been consumed by him.

153.4.3 Where the connection is in the name of some body else but the house is shared by the employee(say with the landlord or some tenant) or vice-versa, concession should be allowed to the Board employee after obtaining a half yearly certificate that he is residing there.

153.4.4 Where two or more than two employees are sharing the same residence and are using electricity from the same meter, the units of electricity concession shall be compounded and deducted from the total consumption and billing will be done for the remaining units as per tariff applicable.  The concerned employees shall submit the following certificate:-

                        "Certified that I am sharing the concession________alongwith_________designation and office address__________from account number____________.  I have not claimed this benefit at any other place."

153.4.5 The Concessional rate may be allowed to the employee irrespective of his place of duty as the families of many employees maybe living at stations other then the station of posting. The head of the office/section should issue a certificate to the effect that the concerned employee has not availed the concession at the place of duty.  The following certificate may be obtained from such an employee.

                        "Certified that I/my family is residing at________________where I am claiming the benefit of supply of electricity at concessional rate and I have not claimed this benefit at any other place."

153.4.6 If the employee is claiming elecy. concession at the station of his duty, he shall give a declaration that he has not claimed this concession at the place where his family is residing or any lace other than this station of posting.

153.4.7 This concession shall not entitle an employee to keep his headquarters at the station where his family is residing.  The place at which the employee wants to get electricity concession i.e. either the place of posting or at a place where his family is residing may be chosen by the employee.

                        Note:- However, the employees posted at Joginger Nagar/ Brot if theyso desire, can avail concessional units permissible to them at Joginder Nagar/Brot at any other place in Punjab where their families choose to live.

153.4.8 Supply at Concessional rate maybe allowed to the work charged staff, who have a continuous service of atleast one year.

153.4.9 The concession of Free electricity shall also be available to other employees, who have put in one year service.  As such concession of free electricity applicable to the regular staff, the  national break after 6 months will not be counted as break in service.

153.4.10 The concession of free elecy. shall not be admissible to the contingent staff.

153.4.11 If the Board employee is residing with his father, brother etc. under joint family system and a Concessional supply is claimed by him, the concession will be allowed and units of free electricity concession shall be deducted from the total consumption and remaining units shall be billed as per tariff applicable.

153.4.12 irrigation Branch employees working at the power project sites viz Hydel-UBDC, Pathankot, Anandpur Sahib Hydel Project under Hydel administration and staff on deputation from outside the Board and serving the Board for so long as they remain on deputation with the Board, shall also be eligible for electricity concession like any other Board employee.  Staff on deputation or deemed to be on deputation shall furnish half yearly certificates that they are on deputation or they are employed on PSEB Projects.

153.5 Board Employees residing outside the State: This concession shall also be available to the officers/officials employed in areas not covered under the Board's supply system. They will be paid admissible concession in cash alongwith their salaries subject to production of certificate  by them that their monthly consumption is not less than that prescribed.  :Provided further that they are not in receipt of any deputation allowance/pay or special pay from the organization under which they may be serving on deputation.

153.6 Quantum of free electricity to employees posted at Shanan/Joginder Nagar/Brot: All O&M and construction staff posted at Shanan/Joginder Nagar/Brot are entitled to free electricity as mentioned hereunder:-

 

 

8 summer months w.e.f. 16th March to 14th Nov. at Joginder Nagar and Brot

4 Winter months w.e.f 15th Nov. to 15th March at

 

 

 

Joginder Nagar

Brot

1

SE/Civil Shanan Construction Circle

300

350

-

2

RE/XEN/Senior Shift Engineer

250

300

350

3

Asstt.Resident Engineer

AEE/Head Works Engineer

200

250

300

4.

Shift Engineer/ Asstt.Engineer and Control Room Er/ Apprentice Engineer

150

200

250

5.

All other employees

100

150

200

 

154 CHARGING OF SERVICE AND METER RENTALS FROM BOARD EMPLOYEES RESIDING IN BOARD'S QUARTERS:

154.1 No service rental shall be recoverable from a Board employee occupying a residence belonging to the Board, while meter rent will be payable by such an occupant.  This will have no relationship with the emoluments of an employee.

154.2 All PSEB employees, including work charged staff and adhoc employees with more than one year of service shall be exempted up to 50% of monthly meter rentals payable by them to the Board.  This concession shall be admissible for Domestic Connections only granted to PSEB employees and to such DS connections from where PSEB employee is consuming energy and will not be admissible to such employees who are posted outside PSEB area.