A) GENERATION
Sr.No. |
Description |
Installed Capacity
(MW) |
Total Generation
(MUs) |
Auxilary Net Consumption
(MUs) |
Generation (MUs)
Upto 31-12-2007 |
a) |
OWN |
|
|
|
|
|
Thermal |
2120 |
12206.222 |
1121.713 |
11084.509 |
|
Hydro |
995 |
3860.351 |
48.142 |
3812.209 |
|
Share from BBMB |
1257 |
3605.735 |
0.00 |
3605.735 |
|
Micro Hydel |
6 |
6.225 |
0.000 |
6.225 |
|
Total |
4378 |
19678.533 |
1169.855 |
18508.678 |
b) |
Share from Central Sector |
1917 |
14345.573 |
0.00 |
14345.573 |
c) |
PEDA /Captive Plants |
61 |
169.243 |
0.00 |
169.243 |
|
Grand Total |
6356 |
34193.349 |
1169.855 |
33023.494 |
B) MAXIMUM DEMAND : 7340 MW at 15.30 hrs on 26.07.2007
C) TRANSMISSION
& DISTRIBUTION SYSTEM as on 31.12.2007
Sr.No. |
Description |
No. of Sub Stations |
Capacity (MVA) |
Lines (Ckt. Kms.) |
a) |
220 KV |
47 |
10220.00 |
4345.402 |
b) |
132 KV |
77 |
4950.00 |
3080.774 |
c) |
66 KV |
446 |
10118.25 |
5983.247 |
d) |
33 KV |
89 |
1140.00 |
1503.316 |
|
Total (a to d) |
659 |
26428.250 |
14912.739 |
e) |
11 KV |
261891 |
16815 |
125484 |
f) |
L.T |
upto 9/07 |
upto 9/07 |
174515.090 |
D) RURAL ELECTRIFICATION :
| Sr.No. |
Description |
No. of Villages |
1 |
Villages Electrified |
13123(100%) |
2 |
Villages provided 24 hours supply on Urban Pattern |
13123 |
3 |
Agriculture pump sets enerigised |
978523 |
E)
COMMERCIAL:
| Sr.No. |
Description |
|
a) |
Total No. of Consumers |
6353603 |
b) |
Total Connected Load(MWs) |
22012.527 |
c) |
Energy Available for State (MUs) |
32445.328 |
d) |
Transmission Distribution Losses (MUs) |
Calculatd Annually |
e) |
Energy Consumed in State (MUs) |
23659.5 |
f)Export to other States(MU) Upto 31-12-2007 919.957
g) Revenue from Sale of Power(Crores) 5086.67
f) PER CAPITA CONSUMPTION calculated annually
g)FINANCE AND ACCOUNTS:
- Capital Plan Outlay 3170
- Capital Plan Expenditure 1061
h) MAN POWER upto 31-3-07
a) |
Class-I & II |
NA |
b) |
Class-III |
NA |
c) |
Class-IV) |
NA |
|
Total |
72154 |
i)COST PER UNIT : Calculated annually |