| 1) |
Location |
The dam is located at river Ravi near village Thein. The
left bank of river falls in the Punjab State and the Right Bank in J&K
State, about 24 KMs upstream of Madhopur Head-works. |
| 2) |
Main Features |
Irrigation, Power, Flood Control, Development of Fishries
& Tourism etc. |
| 3) |
No. of Power Houses |
One |
| 4) |
No. of Units |
4 |
| 5) |
Total generating capacity |
4 x 150 = 600 MW |
| 6) |
Design Discharge |
5700 cusecs |
| 7) |
Designed net Head |
Max = 121.9 Mts
Min = 76.0 Mts
Rated = 100 Mts |
| 8) |
Type of Development |
Reservior |
| 9) |
Commissioning |
Unit - I = 8/2000
Unit - II = 10/2000
Unit - III = 8/2000 Unit -
IV = 9/2000 |
| 10) |
Cost of Project |
Rs. 3601 Crores (6/2000) |
| 11) |
Total energy contribution annually |
1509 MUs |
| 12) |
Cost per unit |
Rs. 8.04 per unit |