To be situated at RD- 550M of newly built
channel of approx, 3.5 Km length, off taking from RD-35500m of Mukerian
Hydel Channel of MHP Stage-I of maximum carrying capacity 11,500 Cusecs.
2)
Main Features:
Project envisages to provide a permanent
outfall structure for the Mukerian Hydel Channel Stage-I in to river Beas
& additionally to generate power.
3)
No. of Power Houses.
One
4)
No. of Units:
Two
5)
Total generating capacity
2x 8.25 = 16.5 MW
6)
Designed net Head:
Approx. 7.21 M
7)
Design Discharge:
10,000 cusecs
8)
Type of Development
Run-of-the canal
9)
Commissioning:
2002-06
10)
Cost of Project:
Approx. 138 Cr.
11)
Total energy contribution annually
134.3 MU + 74 MU =208.3 MU annually saved
by preventing annual forced closure of MHC-I for stone crate dumping (208.3
MU)