All the power Stations operated at their best ever plant load factor since their installation.
Total Power generated is 34984 lakhs units which is more than previous year by 1636 lakhs units resulting of 4.9% increased.
The prestigious Ranjit Sagar Dam Project (4x150 MW) commissioned and dedicated to the Nation.
Power purchase agreement signed with M/S GVK for installing 2x250 MW thermal power station at Goindwal initialized 6th Feb.,2007 and submitted to PSERC for approval.
Second stage of Lehra Mohabbat Thermal Power Station for 2x250 MW under construction. Unit-III likely to be commissioned by 30-9-2007 and Unit-IV by 31-12-2007.
Under various categories,970139 new tubewell connections energized.
24 Hrs. Urban pattern supply made available to 12428 villages and 695 Deras/Dhanies.
To help the scheduled castes/tribes consumers, free monthly consumption limit A,200 units raised for connected load from 500 Watts to 1000 Watts w.e.f. 12-10-06.
Strict measures undertaken to reduce power theft. Disciplinary action taken against the erring employees.
New technologies like electronic meters, remote control of transformers, remote meter reading and introduced.
All these efforts resulted in and increase of 3% in revenue (approximately Rs.6.15) asserting healthy for the further.