THE BUDGET ALLOCATED TO EACH AGENCY FOR THE YEAR 2004-05.

Sr. No.

Name of the

Activity

Planned end

Amount

Amount

Amount

Actual

Responsible

 

Scheme/Head

 

date of the

Proposed

Sanctioned

released/

expenditure

officer for the

 

 

 

activity

 

 

disbursed

for the

quality and the

 

 

 

 

 

 

(No. of

year

complete

 

 

 

 

 

 

installments)

2004-05

execution of

 

 

 

 

 

 

 

 

the work

1

2

3

5

6

7

8

9

10

I

 

GENERATION

 

 

 

 

 

 

A

 

Hydro

 

 

 

 

 

 

1

PP1.5

Ranjit Sagar Dam EB(Elect)

Project already commissioned / Residual works in progress.

94

94

133.75

133.75

CE/Hydel Project, PSEB, Patiala.

2

PP1.7

Shahpurkandi HEP EB only

Decision to develop the project is pending.

0

5000

5000.00

5000.00

CE/SKPD, Pb.Govt. CHD.

3

PP1.23(i)

UBDC Stage-III

Project is to be developed on BOO/BOOT basis.

0

0

-

-

 

4

PP1.26

Mukerian HEP-II

Work in Progress & to be commissioned in 2005-06

2650

1562

1208.39

1208.39

CE/Hyde Projects & CE/Civil Design & Const. Patiala.

5

PP1.29

Micro Hydel Project at GGSSTP Ropar

Work in Progress & to be commissioned in 2005-06

1200

600

708.40

708.40

CE/Civil Design & Const. Patiala.

B

 

Thermal

 

 

 

 

 

 

1

PP1.11

GHTP Stage-I Lehra Mohabbat

Project already commissioned minor works being completed.

1100

1100

700.10

700.10

CE/Thermal Design, PSEB, Patiala.

2

PP1.22

GHTP Stage-II Lehra Mohabbat

Project taken in hand and likely to be commissioned in 2006-07

22500

16000

18156.70

18156.70

-do-

II

 

Renovation & Modernisation

 

 

 

 

 

 

1

PP1.8

R&M works of GNDTP Bathinda(Phase-II)

Work in progress likely to be completed in 2005-06

300

250

 

 

CE/O&M, GNDTP, Bathinda.

2

PP1.31

R&M works of GNDTP Unit-I & II

Work taken in hand and likely to be completed in 2005-06.

13400

6800

7508.85

7508.85

-do-

 

 

based on RLA Study (Phase-I)

 

 

 

 

 

 

3

PP1.39

R&M of GNDTP Unit III & IV based on

 

10

10

0.00

0.00

-do-

 

 

RLA Study (Phase-II)

 

 

 

 

 

 

4

PP1.9

R&M works of GGSSTP Ropar including APDP

Work in progress.

3700

3000

3817.07

3817.07

CE/O&M, GGSSTP, Ropar

 

& 1.40

 

 

 

 

 

 

 

5

PP1.10

Bhakra Right Bank & associated works

 

 

 

 

 

 

a)

 

Bhakra Right Bank

Work completed / Residual works in progress.

 

 

0.33

0.33

 

b)

 

Ganguwal/Kotla PHs(Phase-I & II)

Work completed / Residual works in progress.

550

700

364.84

364.84

Spl. Secy./BBMB, Chandigarh

c)

 

Pong Power House

Work completed / Residual works in progress.

 

 

0.05

0.05

 

d)

 

Bhakra Left Bank

Board has decided to avail loan from REC.

 

 

0.00

0.00

 

e)

 

Ganguwal/Kotla PHs(Phase-III)

Board has decided to avail loan from REC.

 

 

0.00

0.00

 

6

PP1.25

Shanan & other PSEB Projects

 

 

 

 

 

 

a)

 

Shanan PHs,Joginder Nagar including APDP

Work in progress.

 

 

135.50

135.50

 

b)

 

UBDC HEP Stage-I & II

Work in progress.

 

 

185.05

185.05

 

c)

 

R&M of Mukerian HEP Stage-I

-do-

2500

1700

1261.32

1261.32

CE/Hydel Project, PSEB, Patiala.

d)

 

R&M of ASHP

-do-

 

 

44.14

44.14

 

e)

 

Micro Power Houses

-do-

 

 

0.00

0.00

 

f)

 

SYL Project

 

 

 

-0.48

-0.48

 

 

 

Total(Generation) :-

 

48004

36816

39224.01

39224.01

 

 

PP1.12(A)

TRANSMISSION & DISTRIBUTION SYSTEM

 

 

 

 

 

 

III A

 

Transmission System

 

 

 

 

 

 

1

 

Transmission & Sub-transmission Lines & SIS

 

 

2200

 

 

CE/ TL, PSEB, Patiala.

 

 

including APDRP

 

 

 

 

 

 

2

 

S/Stn. works including APDRP

 

 

6800

 

 

CE/Sub-Stn., PSEB, Patiala.

3

 

Capacitor banks

 

 

350

 

 

-do-

4

 

PLCC/SLDC/SCADA

 

 

250

 

 

CE/SO&C, PSEB, Ablowal

5

 

Installation of Disturbance Recorders

 

16000

250

9393.10

9393.10

CE/Thermal Design, PSEB, Patiala.

B

 

Renovation & Refurbishment of old equipt.

 

 

 

 

 

 

1

 

Capital Maintenance of Power Transformers

 

 

 

 

 

 

2

 

220/132KV Grid S/Stn. Equipt.

 

 

1150

 

 

CE/P&M, PSEB, Ludhiana

3

 

66/33KV Sub Station equipt.

 

 

 

 

 

 

 

 

Total (Transmission) :-

 

16000

11000

9393.10

9393.10

 

IV

 

Distribution System

 

 

 

 

 

 

1

 

Normal Development works & S.I.S.

 

24000

32000

34436.33

34436.33

CE/Operation Zones

 

 

including APDRP

 

 

 

 

 

 

2

PP1.32

Under PMGY

 

500

444

300.00*

300.00*

-do-

3

PP1.27

ME Lab & workshop

 

200

76

0.00

0.00

CE/Metering, Ludhiana & CE/Workshop, Patiala.

4

PP1.24(iii)

Release of tubewell connections

 

10000

8000

6125.38

6125.38

CE/Operation Zones

5

PP1.12(B)

Urban Pattern Supply to villages

 

5000

3500

1788.41

1788.41

-do-

 

 

Including Border Area

 

 

 

 

 

 

 

 

Total(Distribution):-

 

39700

44020

42350.12

42350.12

 

V

 

Miscellaneous

 

 

 

 

 

 

1

PP1.13

Survey & Investigation

 

50

50

24.84

24.84

CE/Planning (Irrigation, GOP), Chandigarh

2

PP1.43

I.T.Plan

 

146

40

0.00

0.00

Director/IT, PSEB, Patiala.

 

 

Sub total

 

196

90

24.84

24.84

 

 

 

Grand Total:-

 

103900

91926.00

90992.07

90992.07

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* Expenditure of Rs. 300 Lacs against PMGY is included in the expenditure of Urban Pattarn Supply to Gillages.

 

 

 

 

 

 

 

 

 

 

 

 

 

ANNUAL PLAN PROPOSALS FOR THE YEAR 2005-06 & Expenditure upto 8/2005

(Rs. In Crores)

Scheme No. Sub-head

Name of Project / Scheme

Approved by Pb. Govt. / Allocation by PSEB 2005-06

Expenditure upto 8/2005

PP1.5

Ranjit Sagar Dam Project

0

0

PP1.7

Shahpur Kandi HEP

1.00

0

PP1.23(i)

UBDC Stage-III Escape Channel

0

0

PP1.26

Mukerian Hydro Electric Project Stage-II

25.00

3.23

PP1.29

Micro Hydel Power Houses at Roper

6.50

4.58

PP1.35

Shahpur Kandi Extension HEP

0

0

PP1.36

Mukerian Hydel Project Stage-III

0

0

PP1.10

Renovation & Modernisation of Bhakra Power Houses & associated works

8.00

2.34

PP1.25

Shanan & other PSEB Projects

10.00

0.65

PP1.11

GHTP Stage-I, Lehra Mohabbat

2.00

0.73

PP1.22

GHTP Stage-II Lehra Mohabbat

375.00

96.13

PP1.37

Dhuri Thermal Plant

0

0

PP1.38

Doraha Gas Based Thermal Plant

6.00

0

PP1.31

R&M works at Thermal Plants as per RLA study (Unit-I & II) GNDTP,BTI

71.00

27.83

PP1.8

Renovation & Modernisaion of GNDTP Bathinda Phases-II

1.00

PP1.39

R&M GNDTP Bathinda Unit-III & IV based on RLA Study

1.00

PP1.9& PP1.40

Renovation &Modernisation ofGGSSTP Ropar including under APDP scheme

20.00

5.17

PP1.42

R&M under Global Environment facility at GGSSTP Ropar

0

0

PP1.44

R & M GHTP Stage-I, Lehra Mohabbat

0

0

PP1.12(A)

Transmission & Distribution System (including APDRP Schemes)

(a) Transmission

(b) Distribution

336.50

224.00

112.50

111.44

194.63

PP1.27

Revamping of ME Labs and Workshops

4.50

0

Energy conservation & Energy Audit

CE/Enforcement

0.31

0

PP1.24(iii)

Release of Tubewell Connections

60.00

12.78

PP1.32

Rural Electrification 1. PMGY

2.44

0

PP1.12(B)

Urban Pattern Supply to Villages

(24 hours supply) inc. Border Area

20.00

8.19

PP1.13

Survey & Investigation

0.50

0.06

PP1.41

Tariff Regulatory Commission

0

0

PP1.43

Implementation of I.T. Plan for PSEB

4.00

0

HRD Programmes (Setting of Staff Colleges)

1.00

0

Total

955.75

467.76




Terms & Conditions | Privacy Policy | Feedback | Admin Login
Developed and Maintained by Phoenix IT Solutions Ltd.
©2007 PSEB -All Rights Reserved