GHTP Presentation on Stage-I and Stage-II during 2006-07.

1) Location Between 129 km and 132 km mile stones on Bhatinda, Barnala Road on State Highway No. 12.
2) Main Features
  • Highest generation during 2000-01.
  • Highest P.L.F during March, 2001.
  • Lowest Oil consumption during Feb, 2001
  • Lowest D.M. water make up during August, 2000.
3) No. of Power Houses 2
4) No. of Units 2
5) Total generating capacity 2 x 210 MW = 420 MW
6) Source of water supply Bhatinda Branch of Sirhind Canal.
7) Fuel used Coal from North Karanpura. Coal field of Central Coal field Ltd. a subsidiery Company of coal India Ltd. & L.D.O (Light Diesel Oil)
8) Turbines 210 MW single shaft reaction turbine, tandem coupled 3000 rpm, double flow exhaust, reheat type with initial parameters of 150 kg/sq.cm. and 535 deg.Cel.
9) Generators 247 MVA, 15.75 kV, 0.85 lag, 50 Hz, 3 phase, double star two pole, Horizontal, Cylindrical rotor type.
10) Commissioning Unit I = 29.12.97   Unit II = 16.10.98
11) Cost of Project 1189 Crores
12) Total energy contribution annually 2281 MUs
13) Cost per unit Rs. 2.30/-