| 1) |
Location |
Between 129 km and 132 km mile stones on Bhatinda, Barnala Road on State Highway No. 12. |
| 2) |
Main Features |
- Highest generation during 2000-01.
- Highest P.L.F during March, 2001.
- Lowest Oil consumption during Feb, 2001
- Lowest D.M. water make up during August, 2000.
|
| 3) |
No. of Power Houses |
2 |
| 4) |
No. of Units |
2 |
| 5) |
Total generating capacity |
2 x 210 MW = 420 MW |
| 6) |
Source of water supply |
Bhatinda Branch of Sirhind Canal. |
| 7) |
Fuel used |
Coal from North Karanpura. Coal field of Central Coal field Ltd. a subsidiery Company of coal India Ltd. & L.D.O (Light Diesel Oil) |
| 8) |
Turbines |
210 MW single shaft reaction turbine, tandem coupled 3000 rpm, double flow exhaust, reheat type with initial parameters of 150 kg/sq.cm. and 535 deg.Cel. |
| 9) |
Generators |
247 MVA, 15.75 kV, 0.85 lag, 50 Hz, 3 phase, double star two pole, Horizontal, Cylindrical rotor type. |
| 10) |
Commissioning |
Unit I = 29.12.97 Unit II = 16.10.98 |
| 11) |
Cost of Project |
1189 Crores |
| 12) |
Total energy contribution annually |
2281 MUs |
| 13) |
Cost per unit |
Rs. 2.30/- |