S.No. |
Name of Project |
Detail of Power machines with
installed capacity (MWs) |
Share of
Punjab(MWs) |
Generation during
2006-07 |
Generation upto
31-12-07 |
I |
OWN PROJECTS |
|
|
|
|
a) |
HYDRO ELECTRIC PROJECTS |
|
|
|
|
1 |
Shanan PHs |
4X 15+1X50=110.00 |
110 |
495.666 |
473.199 |
2 |
UBDC |
3X15+3X15.45 =91.35 |
91.35 |
384.607 |
329.483 |
3 |
Anandpur Sahib |
4X33.5=134.00 |
134 |
666.089 |
577.064 |
4 |
Mukerian |
6X15+6X19.5=207.00 |
207 |
1170.736 |
1175.240 |
5 |
RSDHEP |
4X150=600.00 |
452.4 |
1679.476 |
1305.365 |
6 |
Nadampur Micro |
2X0.4=0.80 |
0.8 |
7.959 |
6.225 |
7 |
Daudhar Micro |
3X0.5=1.50 |
1.5 |
8 |
Rohti Micro |
2X0.4=0.80 |
0.8 |
9 |
Thuhi Micro |
2X0.4=0.80 |
0.8 |
10 |
GGSSTP ROPAR(micro) |
|
1.7 |
|
Total |
|
1000.350 |
4404.533 |
3866.576 |
b) |
THERMAL PROJECTS |
No.& Caapacity of
units(MW) |
Total
Capacity
(MW) |
GENERATION
2006-07 |
Generation
upto
31-12-07 |
1 |
GNDTP, BATHINDA |
4X110 =440.00 |
440 |
2221.127 |
2326.631 |
2 |
GGSSTP, ROPAR |
6X210 =1260.00 |
1260 |
9770.340 |
7301.184 |
3 |
RSTP, Jalkheri |
1x10=10.00 |
Added in item4 below |
Added in item4 below |
Added in item4 below |
4 |
GHTP,Lehra Mohabat |
2x210=420.00 |
420 |
3443.172 |
2578.407 |
|
Total |
|
2120 |
15434.639 |
12206.222 |
|
Total (a) +(b) |
|
3120.350 |
19839.172 |
16072.798 |
II |
Share From BBMB Pojects |
|
1258 |
3978.260 |
3605.735 |
III |
Share from Central Sector Projects |
|
1917 |
12361.601 |
14345.573 |
IV |
PEDA & Captive Power Plants |
|
61 |
233.022 |
169.243 |
|
G.Total (I+II+III+IV) |
|
6356 |
36412.055 |
34193.349 |
|
|