S.No.

Name of Project

Detail of Power  machines with
installed capacity (MWs)

Share of  
Punjab(MWs)

Generation during
2006-07

Generation  upto
31-12-07

I

OWN PROJECTS

 

 

 

 

a)

HYDRO ELECTRIC PROJECTS

 

 

 

 

1

Shanan PHs

4X 15+1X50=110.00

110

495.666

473.199

2

UBDC

3X15+3X15.45 =91.35

91.35

384.607

329.483

3

Anandpur Sahib

4X33.5=134.00

134

666.089

577.064

4

Mukerian

6X15+6X19.5=207.00

207

1170.736

1175.240

5

RSDHEP

4X150=600.00

452.4

1679.476

1305.365

6

Nadampur Micro

2X0.4=0.80

0.8

7.959

6.225

7

Daudhar Micro

3X0.5=1.50

1.5

8

Rohti Micro

2X0.4=0.80

0.8

9

Thuhi Micro

2X0.4=0.80

0.8

10

GGSSTP ROPAR(micro)

 

1.7

 

Total

 

1000.350

4404.533

3866.576

b)

THERMAL PROJECTS

No.& Caapacity of
units(MW)

Total
Capacity
(MW)

GENERATION
2006-07

Generation
upto 31-12-07

1

GNDTP, BATHINDA

4X110 =440.00

440

2221.127

2326.631

2

GGSSTP, ROPAR

6X210 =1260.00

1260

9770.340

7301.184

3

RSTP, Jalkheri

1x10=10.00

Added in item4 below

Added in item4 below

Added in item4 below

4

GHTP,Lehra Mohabat

2x210=420.00

420

3443.172

2578.407

 

Total

 

2120

15434.639

12206.222

 

Total (a) +(b)

 

3120.350

19839.172

16072.798

II

Share From BBMB Pojects

 

1258

3978.260

3605.735

III

Share from Central Sector Projects

 

1917

12361.601

14345.573

IV

PEDA & Captive Power Plants

 

61

233.022

169.243

 

G.Total (I+II+III+IV)

 

6356

36412.055

34193.349