|
PSEB CS-I(R)
PUNJAB STATE ELECTRICITY BOARD REQUISITION FORM FOR INDUSTRIAL/BULK
SUPPLY
(FOR LOADS EXCEEDING 500 KW)
Requisition No._________________
Date:__________________
To
SE/Dy. Chief Engineer/Op.
P.S.E.B., Circle,
___________________
Sir,
I/We hereby request you to supply energy for the
following premises owned/occupied by me/us. Load/Contract demand and other particulars
are detailed below:-
1.
Motive /Industrial Load(KW)
2.
General Load(Light, fans, heaters,
refrigerator etc)(KW)
3.
Load for residential colony (KW)
4.
Total Load(KW)
5.
Contract Demand(KVA)
6.
Transformer Capacity(KVA)
7.
Supply voltage
8.
In case of extension in load,
Details of present load/
Present Contract demand
9.
Type of Industry
10. Capacity
of furnace(Arc/Induction)
transformer(KVA) and voltage ratio.
11. Details
of premises(Alongwith Map)
12. Distance
from Sub-Station
13. Special
feeder if required
14. Any other
details
I/We request that permission to file requisition
for above Load/Contract Demand may be granted.
(Signature of Applicant)
Full Address:_______________________
___________________________________
___________________________________
Earnest Money_________________________
BA-16 No.______________________________
Dated:________________________________
Issued to Sh//M/s._________________________________S/o________________________
Signature
Consumer Clerk
List of documents to be submitted:-
1. Certified copy of the Articles
of Association/memorandum
2. Certified copy of the Incorporation
of the company
3. Certified copy of the partnership
deed.
4. Certified copy of registration
of the firm by the Registrar of the firms.
5. Certified copy of Constitution
of the society/trust.
6. Certified copy of the registration
of the society by the Registrar of Societies.
7. Special power of attorney
for the authorized signatory duly notarized.
8.
Certified copy of the resolution authorizing the signatory to sign on behalf
of the company.
9.
Certified copy of the NOC from PPCB.
10.
Certified copy of NOC from PUDA.
11.
Undertaking that the company or its sister concern is not involved in theft
case.
12.
Undertaking that no court case or dispute is pending.
13.
Undertaking to the effect that the consumer shall not claim damages in the event
of fluctuation on the system.
14.
Undertaking that no other connection is running in the same premises.
|