The Punjab State Electricity Board has filed its
Revenue Requirement as a vertically integrated utility for the year 2005-06.
The Board has projected aggregate revenue requirement for an amount of Rs. 9704
crores. This covers the total expenses of Rs. 9498 crores and return of Rs.
206 crores on net fixed assets. The expected revenue projected at the current
tariff rates including subsidy from GoP, is Rs. 7195 crores and non - tariff
income is projected at Rs.340 crores. The Board has worked out a revenue gap
of Rs. 2169 crores. The Board has proposed to cover this gap by revenue surplus
carried over from previous year (Rs. 291 crores), additional revenue from
proposed tariff (Rs. 1002 crores) and creation of Regulatory Asset (Rs. 876
crores). A summary of Annual Revenue Requirement as filed by the Board is given
below in Table 5.1.
Table - 5.1
Annual Revenue
Requirement for the year 2005-06
(Rs. Crores)
| Sl. No. |
Item |
Projected by the Board in
ARR 05-06 |
| 1 |
2 |
3 |
| 1. |
Cost of Fuel |
2334 |
| 2. |
Power Purchase Expenses |
3553 |
| 3. |
Employees Cost* |
1700 |
| 4. |
Interest Charges* |
967 |
| 5. |
O&M Expenses* |
265 |
| 6. |
A&G Expenses * |
55 |
| 7. |
Depreciation Charges |
624 |
| 8. |
Net Expenditure |
9498 |
| 9. |
Add: Reasonable Return |
206 |
| 10. |
Total Revenue Requirement |
9704 |
| 11. |
Less Non-tariff Income |
340 |
| 12. |
Net Revenue Requirement |
9364 |
| Sl. No. |
Item |
Projected by the Board in
ARR 05-06 |
| 1 |
2 |
3 |
| 13. |
Less Revenue at Existing Tariff including Subsidy
from Government of Punjab |
7195 |
| 14. |
Net Revenue Gap |
2169 |
| 15. |
Covered by i)
Revenue Surplus carried over ii) Additional Revenue from
Proposed Tariff. iii) Regulatory Asset. iv) Total |
291 1002 876 2169 |
* Net of capitalization.
The major items of expenses are Fuel cost (25%),
power purchase cost (38%), employees cost (18%) and interest charges (10%).
5.1.2 Energy Projections
The Board in its ARR has projected energy sales and energy availability for
the year 2005-06 as given below in Tables 5.2 and 5.3.
Table - 5.2
Energy Sales
for 2005-06
(MU)
| Sl.
No. |
Category of Consumers |
Projected Energy Sales
|
| 1 |
2 |
3 |
| 1. |
Domestic |
6075 |
| 2. |
Non-Residential |
1587 |
| 3. |
Small Power |
678 |
| 4. |
Medium Supply |
1862 |
| 5. |
Large Supply |
6706 |
| 6. |
Agriculture |
7364 |
| 7. |
Public Lighting |
127 |
| 8. |
Bulk Supply and Railway
Traction |
504 |
| 9. |
Total Sales in the State |
24903 |
Table - 5.3
Energy Availability
for 2005-06
(MU)
| Sr. No. |
Particulars |
Projected Energy Availability |
| 1 |
2 |
3 |
1. |
Generation |
|
| |
(i) Thermal Generation |
|
| |
- Gross generation
|
13,870 |
| |
- Auxiliary consumption
|
1,368 |
| |
- Net generation |
12,502 |
| Sr. No. |
Particulars |
Projected Energy Availability |
| 1 |
2 |
3 |
| |
(ii) Own Hydel Generation
|
|
| |
- Gross generation
|
3228 |
| |
- Auxiliary consumption
|
7 |
| |
- Transformation losses |
16 |
| |
- Net generation
|
3205 |
| |
(iii) Share from BBMB (including
381 MU as
share of common pool
consumers) |
3743 |
| |
Total generation (net) |
19450 |
| 2. |
Power purchase (net) |
14251 |
| 3. |
Total energy availability |
33701 |
| 4. |
Less
i)
Common pool sales.
ii)
Outside state sales |
381
553 |
| 5. |
Energy available for sale within in the State
(3-4) |
32767 |
| 6. |
T&D loss at 24% |
7864 |
| 7. |
Estimated energy sales in the State (5-6) |
24903 |
5.1.3 Proposed Tariffs
a) Existing and Proposed Tariffs
The Board has filed proposals for revising tariff
to meet the Revenue requirement for the year 2005-06. The existing and proposed
tariff rates are given in Annexure-I to this Chapter.
b) Salient Features of the Proposed Tariff
i)
Two part tariff structure has been proposed for all consumer categories except
for agriculture. Fixed charges are proposed to be levied on sanctioned load
of the consumer except for LS, MES, Bulk Supply and Railway Traction consumers.
Demand charges for LS, MES, Bulk supply and Railway Traction consumer are proposed
to be levied on contract demand.
ii)
Monthly minimum charges are proposed to be discontinued for all categories except
temporary supply.
iii)
Differential agriculture tariff has been proposed for submersible pumpsets
and monoblock pump sets. Tariff for submersible pump sets is proposed to be
24% higher than tariff of monoblock pumpsets on the plea that consumption by
submersible pumpsets is higher by 24% than consumption by monoblock pumpsets.
iv)
A new domestic slab of 0-30 units has been proposed for the marginal / economically
weaker consumers. The second domestic slab stands revised to 31-100 units.
v)
Domestic slab of 101-300 units and slab of above 300 units are proposed to be
merged.
vi)
The Board has proposed to abolish the 10% rebate for its Rural domestic consumers
in view of proposed coverage of all the villages under urban pattern supply
by June 30, 2005.
vii)
A rebate for higher voltage has been proposed for all categories of consumers
connected at 11 KV or above except Railway Traction at the following rates.
| a) |
Consumers with connected load at prescribed
voltage level as per PSEB norms. |
NIL |
| b) |
Consumers connected at voltage higher than PSEB
norms for connected load. |
3% |
| |
Surcharge is proposed to be levied on consumers
connected at voltage lower than the PSEB norms. |
|
viii)
Tariff applicable on temporary connection consumers is proposed to be increased
by 15% for all categories.
ix)
The Board has intimated that fixed costs constitute 40% of the total costs while
variable costs constitute the balance 60% of total costs. On introduction of
the proposed 2-part tariff structure, the Board has estimated revenue recovery
through fixed charges at 19% of total revenues, while revenue recovery from
energy charges will be 81%.
x)
Any other charges which are being collected by the Board will be continued at
the existing rates.
c) Revenue from Existing and Proposed Tariffs
The Board
has projected the revenue from various consumer categories with reference to
the existing and proposed tariffs as given below in Table 5.4.
Table 5.4
Revenue from
Existing and Proposed Tariff Rates
| Sr. No. |
Consumer category |
Annual consumption (MU) |
Revenue from
(Rs. Crores) |
| Existing Tariff |
Proposed Tariff |
| 1 |
2 |
3 |
4 |
5 |
| 1. |
Domestic |
6075 |
1565 |
1794 |
| 2. |
NRS |
1587 |
663 |
729 |
| 3. |
Small power |
678 |
220 |
245 |
| 4. |
Medium supply |
1862 |
649 |
723 |
| 5. |
Large supply |
6706 |
2331 |
2648 |
| 6. |
Public lighting |
127 |
49 |
52 |
| 7. |
Bulk supply, MES and Traction. |
504 |
181 |
206 |
| 8. |
Agriculture |
7364 |
1356 |
1595 |
| 9. |
Common pool |
381 |
75 |
85 |
| 10. |
Outside State |
553 |
106 |
120 |
| 11. |
Total |
25,837 |
7195 |
8,197 |
The Board has worked out additional revenue requirement
of Rs. 1878 crores for the year 2005-06 after adjustment of revenue surplus
of Rs. 291 crores from the previous year i.e. 2004-05. In its tariff proposals,
the Board has proposed to capture an amount of Rs. 1002 crores through tariff
revision and remaining gap of Rs. 876 crores is proposed to be carried forward
as Regulatory Asset subject to approval of the Commission.
5.2
2004-05 Review
The Board has given revised estimates for Aggregate Revenue
Requirement and Revenue for the year 2004-05. In the revised estimates the costs
under various heads are different from those approved in the Tariff Order of
the Commission. The Board has worked out revenue gap of Rs. 1431 crores for
the years 2004-05 regarding which the Board has stated that recovery mechanism
needs to be evolved separately. Revised Revenue Requirement for the year 2004-05
is analysed in Chapter-3 of this Tariff Order.
5.3
2003-04 True Up
The Board has given actual Aggregate Revenue Requirement
and Revenue for the year 2003-04 and has indicated a revenue gap of Rs. 45 crores.
True up for the year 2003-04 is discussed in Chapter - 2 of this Tariff Order.
5.4
Expenses for the year 2002-03
In its presentation dated April 11, 2005, the Board has
claimed prior period expenditure of Rs. 63.54 crores and other debits of Rs.
10.31 crores relating to the year 2002-03. The Board has stated that the prior
period expenses are bonafide expenses incurred by the Board in the previous
years that could not be booked in the respective year because of reasons on
which the Board has no control.
Annexure-I
Existing & Proposed Tariff Structure
| Consumer Categories |
Energy Charges (Rs/U) |
Minimum Charges per month |
Fixed Charges per month |
| Existing |
Proposed |
Unit |
Existing |
Proposed |
Unit |
Existing |
Proposed |
| Domestic |
|
|
|
|
|
|
|
|
| 0-30 units |
2.00 |
2.00 |
Rs/kW |
27 |
0 |
Rs/kW |
0 |
20 |
| 31-100 units |
2.00 |
2.30 |
Rs/kW |
27 |
0 |
Rs/kW |
0 |
20 |
| 101-300 Units |
3.34 |
3.53 |
Rs/kW |
27 |
0 |
Rs/kW |
0 |
20 |
| > 300 Units |
3.53 |
3.53 |
Rs/kW |
27 |
0 |
Rs/kW |
0 |
20 |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| Non-Residential Supply |
3.84 |
3.84 |
Rs/kW |
99 |
0 |
Rs/kW |
0 |
50 |
| Agriculture |
| Existing Tariff |
Proposed Tariff |
| i) |
Without Government Subsidy 194
Ps/Unit or Rs. 205/BHP/month |
Agri - Unmetered - Cost Based
Tariff (Mono-Block Pump-sets) |
Rs. 225/BHP/Month |
| ii) |
With Government Subsidy
57 Ps/Unit or Rs. 60/BHP/month |
Agri - Unmetered - Cost Based
Tariff (Submersible Pump-sets) |
Rs. 286/BHP/Month |
| |
|
Agri - Metered - Cost Based Tariff |
Rs. 2.13 /unit |
| Consumer Categories |
Energy Charges (Rs/U) |
Minimum Charges per month |
Fixed Charges per month |
| Existing |
Proposed |
Unit |
Existing |
Proposed |
Unit |
Existing |
Proposed |
| Small Power |
|
|
|
|
|
|
|
|
| SP-Permanent |
3.06 |
3.06 |
Rs/kW |
81 |
0 |
Rs/kW |
0 |
35 |
| SP-ice factory etc.-on season (April to July) |
3.06 |
3.06 |
Rs/kW |
405 |
0 |
Rs/kW |
0 |
35 |
| SP- ice factory etc.-off season |
3.06 |
3.06 |
Rs/kW |
81 |
0 |
Rs/kW |
0 |
35 |
| SP-Seasonal-on season (1st Sept to 31st
May next year) |
3.06 |
3.63 |
Rs/kW |
297 |
0 |
Rs/kW |
0 |
35 |
| SP-Seasonal-off season |
3.63 |
3.63 |
Rs/kW |
NA |
0 |
Rs/kW |
0 |
35 |
| |
|
|
|
|
|
|
|
|
| Medium Supply |
| MS-Permanent |
3.37 |
3.37 |
Rs/kW |
108 |
0 |
Rs/kW |
0 |
75 |
| MS-ice factory etc.-on season (April to July) |
3.37 |
3.37 |
Rs/kW |
405 |
0 |
Rs/kW |
0 |
75 |
| MS- ice factory etc.-off season |
3.37 |
3.37 |
Rs/kW |
81 |
0 |
Rs/kW |
0 |
75 |
| MS-Seasonal-on season (1st Sept to 31st
May next year) |
3.37 |
3.37 |
Rs/kW |
297 |
0 |
Rs/kW |
0 |
75 |
| MS-Seasonal-off season |
3.91 |
3.91 |
Rs/kW |
NA |
0 |
Rs/kW |
0 |
75 |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| Consumer Categories |
Energy Charges (Rs/U) |
Minimum Charges per month |
Fixed Charges per month |
| Existing |
Proposed |
Unit |
Existing |
Proposed |
Unit |
Existing |
Proposed |
| Large Supply |
|
|
|
|
|
|
|
|
| General Industry (Permanent) |
3.37 |
3.37 |
Rs/kW |
108 |
0 |
Rs/kVA |
0 |
100 |
| PIU |
3.37 |
3.37 |
Rs/kW |
297 |
0 |
Rs/kVA |
0 |
150 |
| Arc Furnace |
3.37 |
3.37 |
Rs/kW |
283 |
0 |
Rs/kVA |
0 |
150 |
| |
|
|
|
|
|
|
|
|
| LS- ice factory etc. on season (April to July) |
3.37 |
3.37 |
Rs/kW |
405 |
0 |
Rs/kVA |
0 |
100 |
| LS- ice factory etc.-off season |
3.37 |
3.37 |
Rs/kW |
81 |
0 |
Rs/kVA |
0 |
100 |
| LS-Seasonal-on season (1st Sept to
31st May next year) |
3.37 |
3.37 |
Rs/kW |
297 |
0 |
Rs/kVA |
0 |
100 |
| LS-Seasonal-off season |
3.88 |
3.88 |
Rs/kW |
NA |
0 |
Rs/kVA |
0 |
100 |
| |
|
|
|
|
|
|
|
|
| MES |
|
|
|
|
|
|
|
|
| HT |
Covered in Bulk Supply |
3.46 |
Rs/kVA |
Covered in Bulk Supply |
0 |
Rs/kVA |
0 |
100 |
| LT |
3.68 |
Rs/kW |
0 |
Rs/kVA |
0 |
100 |
| Bulk Supply |
|
|
|
|
|
|
|
|
| HT |
3.46 |
3.46 |
Rs/kVA |
162 |
0 |
Rs/kVA |
0 |
100 |
| LT |
3.68 |
3.68 |
Rs/kW |
162 |
0 |
Rs/kVA |
0 |
35 |
| Railway Traction |
4.02 |
4.02 |
Rs/kVA |
162 |
0 |
Rs/kVA |
0 |
100 |
| |
|
|
|
|
|
|
|
|
| Public Lighting |
3.84 |
3.84 |
Hrs/day |
8 |
8 |
Rs/kW |
0 |
75 |
| Golden Temple & Durgiana temple |
| 0-2000 units |
Free |
0.00 |
Rs/kW |
NA |
0 |
Rs/kW |
0 |
20 |
| 2001 & Above |
2.73 |
2.81 |
Rs/kW |
NA |
0 |
Rs/kW |
0 |
20 |
| Temporary Supply |
| i) Domestic |
6.01 |
6.91 |
Rs./kW |
Higher of Rs.500 or
Rs.100 / KW |
Higher of Rs.575 or
Rs.115 / KW |
|
|
|
| ii) NRS |
6.01 |
6.91 |
Rs./kW |
Higher of Rs.1000 or
Rs.250 / KW |
Higher of Rs.1150 or
Rs.285 / KW |
|
|
|
iii) Industrial
(SP, MS & LS) |
As per tariff for permanent supply +
100% |
7.75 |
Rs/kW |
400 |
460 |
|
|
|
iv) wheat thrasher
|
-do- |
7.75 |
Rs/kW |
400 |
460 |
|
|
|
v) Fairs, exhibition
& melas Congregations |
Bulk supply Tariff + 50% |
6.15 |
Per service |
4000 |
4600 |
|
|
|
| Consumer Categories |
Energy Charges (Rs/U) |
Minimum Charges per month |
Fixed Charges per month |
| Existing |
Proposed |
Unit |
Existing |
Proposed |
Unit |
Existing |
Proposed |
| vi) Touring
Cinemas
a) Lights and
fans
b) Motive load
- SP
- MS & LS |
6.01 As per tariff for permanent supply
+ 100% |
6.91 7.04 7.75 |
Rs./kW |
Higher of Rs.1000 or
Rs.250/
KW |
Higher of Rs.1150
or
Rs.285/KW |
|
|
|
|