| Sr. No. |
Name of theScheme/Head |
Activity |
Planned enddate of theactivity |
Amount Proposed |
Amount Sanctioned |
Amount released/disbursed (No. ofinstallments) |
Actual expenditure for the year2004-05 |
Responsible officer for the quality and the complete execution of the
work |
| 1 |
2 |
3 |
5 |
6 |
7 |
8 |
9 |
10 |
| I |
|
GENERATION |
|
|
|
|
|
|
| A |
|
Hydro |
|
|
|
|
|
|
| 1 |
PP1.5 |
Ranjit Sagar Dam EB(Elect) |
Project already commissioned / Residual works in progress. |
94 |
94 |
133.75 |
133.75 |
CE/Hydel Project, PSEB, Patiala. |
| 2 |
PP1.7 |
Shahpurkandi HEP EB only |
Decision to develop the project is pending. |
0 |
5000 |
5000.00 |
5000.00 |
CE/SKPD, Pb.Govt. CHD. |
| 3 |
PP1.23(i) |
UBDC Stage-III |
Project is to be developed on BOO/BOOT basis. |
0 |
0 |
- |
- |
|
| 4 |
PP1.26 |
Mukerian HEP-II |
Work in Progress & to be commissioned in 2005-06 |
2650 |
1562 |
1208.39 |
1208.39 |
CE/Hyde Projects & CE/Civil Design & Const. Patiala. |
| 5 |
PP1.29 |
Micro Hydel Project at GGSSTP Ropar |
Work in Progress & to be commissioned in 2005-06 |
1200 |
600 |
708.40 |
708.40 |
CE/Civil Design & Const. Patiala. |
| B |
|
Thermal |
|
|
|
|
|
|
| 1 |
PP1.11 |
GHTP Stage-I Lehra Mohabbat |
Project already commissioned minor works being completed. |
1100 |
1100 |
700.10 |
700.10 |
CE/Thermal Design, PSEB, Patiala. |
| 2 |
PP1.22 |
GHTP Stage-II Lehra Mohabbat |
Project taken in hand and likely to be commissioned in 2006-07 |
22500 |
16000 |
18156.70 |
18156.70 |
-do- |
| II |
|
Renovation & Modernisation |
|
|
|
|
|
|
| 1 |
PP1.8 |
R&M works of GNDTP Bathinda(Phase-II) |
Work in progress likely to be completed in 2005-06 |
300 |
250 |
|
|
CE/O&M, GNDTP, Bathinda. |
| 2 |
PP1.31 |
R&M works of GNDTP Unit-I & II |
Work taken in hand and likely to be completed in 2005-06. |
13400 |
6800 |
7508.85 |
7508.85 |
-do- |
|
|
based on RLA Study (Phase-I) |
|
|
|
|
|
|
| 3 |
PP1.39 |
R&M of GNDTP Unit III & IV based on |
|
10 |
10 |
0.00 |
0.00 |
-do- |
|
|
RLA Study (Phase-II) |
|
|
|
|
|
|
| 4 |
PP1.9 |
R&M works of GGSSTP Ropar including APDP |
Work in progress. |
3700 |
3000 |
3817.07 |
3817.07 |
CE/O&M, GGSSTP, Ropar |
|
& 1.40 |
|
|
|
|
|
|
|
| 5 |
PP1.10 |
Bhakra Right Bank & associated works |
|
|
|
|
|
|
| a) |
|
Bhakra Right Bank |
Work completed / Residual works in progress. |
|
|
0.33 |
0.33 |
|
| b) |
|
Ganguwal/Kotla PHs(Phase-I & II) |
Work completed / Residual works in progress. |
550 |
700 |
364.84 |
364.84 |
Spl. Secy./BBMB, Chandigarh |
| c) |
|
Pong Power House |
Work completed / Residual works in progress. |
|
|
0.05 |
0.05 |
|
| d) |
|
Bhakra Left Bank |
Board has decided to avail loan from REC. |
|
|
0.00 |
0.00 |
|
| e) |
|
Ganguwal/Kotla PHs(Phase-III) |
Board has decided to avail loan from REC. |
|
|
0.00 |
0.00 |
|
| 6 |
PP1.25 |
Shanan & other PSEB Projects |
|
|
|
|
|
|
| a) |
|
Shanan PHs,Joginder Nagar including APDP |
Work in progress. |
|
|
135.50 |
135.50 |
|
| b) |
|
UBDC HEP Stage-I & II |
Work in progress. |
|
|
185.05 |
185.05 |
|
| c) |
|
R&M of Mukerian HEP Stage-I |
-do- |
2500 |
1700 |
1261.32 |
1261.32 |
CE/Hydel Project, PSEB, Patiala. |
| d) |
|
R&M of ASHP |
-do- |
|
|
44.14 |
44.14 |
|
| e) |
|
Micro Power Houses |
-do- |
|
|
0.00 |
0.00 |
|
| f) |
|
SYL Project |
|
|
|
-0.48 |
-0.48 |
|
|
|
Total(Generation) :- |
|
48004 |
36816 |
39224.01 |
39224.01 |
|
|
PP1.12(A) |
TRANSMISSION & DISTRIBUTION
SYSTEM |
|
|
|
|
|
|
| III A |
|
Transmission System |
|
|
|
|
|
|
| 1 |
|
Transmission & Sub-transmission Lines & SIS |
|
|
2200 |
|
|
CE/ TL, PSEB, Patiala. |
|
|
including APDRP |
|
|
|
|
|
|
| 2 |
|
S/Stn. works including APDRP |
|
|
6800 |
|
|
CE/Sub-Stn., PSEB, Patiala. |
| 3 |
|
Capacitor banks |
|
|
350 |
|
|
-do- |
| 4 |
|
PLCC/SLDC/SCADA |
|
|
250 |
|
|
CE/SO&C, PSEB, Ablowal |
| 5 |
|
Installation of Disturbance Recorders |
|
16000 |
250 |
9393.10 |
9393.10 |
CE/Thermal Design, PSEB, Patiala. |
| B |
|
Renovation & Refurbishment of old equipt. |
|
|
|
|
|
|
| 1 |
|
Capital Maintenance of Power Transformers |
|
|
|
|
|
|
| 2 |
|
220/132KV Grid S/Stn. Equipt. |
|
|
1150 |
|
|
CE/P&M, PSEB, Ludhiana |
| 3 |
|
66/33KV Sub Station equipt. |
|
|
|
|
|
|
|
|
Total (Transmission) :- |
|
16000 |
11000 |
9393.10 |
9393.10 |
|
| IV |
|
Distribution System |
|
|
|
|
|
|
| 1 |
|
Normal Development works & S.I.S. |
|
24000 |
32000 |
34436.33 |
34436.33 |
CE/Operation Zones |
|
|
including APDRP |
|
|
|
|
|
|
| 2 |
PP1.32 |
Under PMGY |
|
500 |
444 |
300.00* |
300.00* |
-do- |
| 3 |
PP1.27 |
ME Lab & workshop |
|
200 |
76 |
0.00 |
0.00 |
CE/Metering, Ludhiana & CE/Workshop, Patiala. |
| 4 |
PP1.24(iii) |
Release of tubewell connections |
|
10000 |
8000 |
6125.38 |
6125.38 |
CE/Operation Zones |
| 5 |
PP1.12(B) |
Urban Pattern Supply to villages |
|
5000 |
3500 |
1788.41 |
1788.41 |
-do- |
|
|
Including Border Area |
|
|
|
|
|
|
|
|
Total(Distribution):- |
|
39700 |
44020 |
42350.12 |
42350.12 |
|
| V |
|
Miscellaneous |
|
|
|
|
|
|
| 1 |
PP1.13 |
Survey & Investigation |
|
50 |
50 |
24.84 |
24.84 |
CE/Planning (Irrigation, GOP), Chandigarh |
| 2 |
PP1.43 |
I.T.Plan |
|
146 |
40 |
0.00 |
0.00 |
Director/IT, PSEB, Patiala. |
|
|
Sub total |
|
196 |
90 |
24.84 |
24.84 |
|
|
|
Grand Total:- |
|
103900 |
91926.00 |
90992.07 |
90992.07 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* Expenditure of Rs. 300 Lacs against PMGY is included in
the expenditure of Urban Pattarn Supply to Gillages. |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Scheme No. Sub-head |
Name of Project / Scheme |
Approved by Pb. Govt. / Allocation by PSEB 2005-06 |
Expenditure upto 8/2005 |
| PP1.5 |
Ranjit Sagar Dam Project |
0 |
0 |
| PP1.7 |
Shahpur Kandi HEP |
1.00 |
0 |
| PP1.23(i) |
UBDC Stage-III Escape Channel |
0 |
0 |
| PP1.26 |
Mukerian Hydro Electric Project Stage-II |
25.00 |
3.23 |
| PP1.29 |
Micro Hydel Power Houses at Roper |
6.50 |
4.58 |
| PP1.35 |
Shahpur Kandi Extension HEP |
0 |
0 |
| PP1.36 |
Mukerian Hydel Project Stage-III |
0 |
0 |
| PP1.10 |
Renovation & Modernisation of Bhakra Power Houses & associated
works |
8.00 |
2.34 |
| PP1.25 |
Shanan & other PSEB Projects |
10.00 |
0.65 |
| PP1.11 |
GHTP Stage-I, Lehra Mohabbat |
2.00 |
0.73 |
| PP1.22 |
GHTP Stage-II Lehra Mohabbat |
375.00 |
96.13 |
| PP1.37 |
Dhuri Thermal Plant |
0 |
0 |
| PP1.38 |
Doraha Gas Based Thermal Plant |
6.00 |
0 |
| PP1.31 |
R&M works at Thermal Plants as per RLA study (Unit-I & II) GNDTP,BTI
|
71.00 |
27.83 |
| PP1.8 |
Renovation & Modernisaion of GNDTP Bathinda Phases-II |
1.00 |
| PP1.39 |
R&M GNDTP Bathinda Unit-III & IV based on RLA Study |
1.00 |
| PP1.9& PP1.40 |
Renovation &Modernisation ofGGSSTP Ropar including under APDP scheme
|
20.00 |
5.17 |
| PP1.42 |
R&M under Global Environment facility at GGSSTP Ropar |
0 |
0 |
| PP1.44 |
R & M GHTP Stage-I, Lehra Mohabbat |
0 |
0 |
| PP1.12(A) |
Transmission & Distribution System (including APDRP Schemes) (a)
Transmission (b) Distribution |
336.50 224.00 112.50 |
111.44 194.63 |
| PP1.27 |
Revamping of ME Labs and Workshops |
4.50 |
0 |
| |
Energy conservation & Energy Audit CE/Enforcement |
0.31 |
0 |
| PP1.24(iii) |
Release of Tubewell Connections |
60.00 |
12.78 |
| PP1.32 |
Rural Electrification 1. PMGY |
2.44 |
0 |
| PP1.12(B) |
Urban Pattern Supply to Villages (24 hours supply) inc. Border Area |
20.00 |
8.19 |
| PP1.13 |
Survey & Investigation |
0.50 |
0.06 |
| PP1.41 |
Tariff Regulatory Commission |
0 |
0 |
| PP1.43 |
Implementation of I.T. Plan for PSEB |
4.00 |
0 |
| |
HRD Programmes (Setting of Staff Colleges) |
1.00 |
0 |
| |
Total |
955.75 |
467.76 |