Suburban Circle Amritsar
66/11 KV Grid Substations = 25 No.
A) 66 KV Feeders = 25 No.
Length of 66 KV Lines = 264 k
B) 11 KV Feeders = 322 No.
Length of 11KV Lines = 6089 KM
C) Length of LT Lines = 10932 KM
D) HT/LT Ratio = 1: 1.80
E) No. of DTF/S Capacity wise ending 30.11.2005:
Total No. of distribution Transformers = 13238 Nos.
400 KVA 500 KVA 750 KVA 800 KVA 1000 KVA
5 53 04 Nil 5
F) No. Current complaints per thousand consumers: During 11/04 During 11/05
1.62 1.54
G) Reliability Index: During 11/04 During 11/05
99.79% 99.84%
1.3 Peak Demand: = 522 MW
1.4 No of Consumers & connected load = 323822 Nos.; C. Load = 883.504 MW
Category As on 30.11.05 Load(KW)
D.S 218904 317194
C.S 29086 63593
S.P 6601 60711
M.S 1063 62270
L.S 159 91687
A.P. (SP) 761 2239
A.P (Metered) 1661 6978
A.P. (Un-Metered) 65452 254725
AP Temp
Street Light 72 914
B.S. 63 17183
TOTAL: 323822 Nos. 883504 KW
CategorybAs on 30.11.05 Load(KW)
D.S 218904 317194
C.S 29086 63593
S.P 6601 60711
M.S 1063 62270
L.S 159 91687
A.P. (SP) 761 2239
A.P (Metered) 1661 6978
A.P. (Un-Metered) 65452 254725
AP Temp
Street Light 72 914
B.S. 63 17183
TOTAL: 323822 Nos. 883504 KW
2. ENERGY ACCOUNTING
2.1 Energy Consumption Per Year: 550.8 M: US
End.11/2004 End.11/2005 Diff %age Increase / Decrease
Energy Input (in Lac) 12431.50 12748.14 + 316.64 + 2.55
Energy Sold (in Lac) 7743.08 7983.31 - 240.23 + 3.10
2.4 Energy losses 37.71 37.38 - 0.33
2.5 Revenue Assessed (in Lac ) 2003-04 End 3/05 End.11/04 End.11/05 %age Increase/Decrease21779.27 22752.99 15745.82 17306.15 9.90%
2.6 Sundry Debtors: Ending 11/2004 Ending 11/2005
Assessment Realization Recovery % Assessment Realization Recovery %
16101.05 14924.27 92.69% 17814.76 16009.29 89.87%
2.7 Defaulting Amount Total Amount Recoverable
End.9/03 1525.11 1184.72
End.3/04 1950.73 1536.71
End.6/04 2024.63 1594.83 End 3/05 3107.28 2476.01
End 9/05 3823.86 (Audit) 3091.50 (Audit)
End 10/05 3960.89 3215.51
End 11/05 4090.15 3356.27
3. TOTAL NO OF VILLAGES = 732 no. + 17 cluster
3.1 No. of villages given 24 hrs supply = 602 no. +7 clusters
3.2 Balance villages where 24 hrs supply = 130 +10 cluster
TARN TARAN CIRCLE ENDING 10/2005 |
|
|
|
|
|
|
|
|
1 |
|
|
Profile. |
|
|
|
|
1.1 |
66/11Kv Grid Sub Stn. |
|
|
31. Nos |
|
|
1.2 |
66Kv Feeder |
|
|
28 Nos |
|
|
|
11Kv Feeders |
|
|
286 No |
|
|
|
Lenth of 11 Kv Feeders |
|
|
6488 KM |
|
|
|
Lenth of L.T. Line |
|
|
12205 KM |
|
|
|
HT/LT Ratio |
|
|
|
01:01:.81 |
|
|
No of D/S T/F's capacity
wise ending 31.10.2005 |
|
25 Kva |
63Kva |
100 Kva |
200 Kva |
300 Kva |
400 Kva |
500 Kva |
|
5767 |
6135 |
2618 |
154 |
12 |
0 |
4 |
No Current complants
per thousand consumers |
Relliability index |
During 10/2004 |
During 10/2005 |
|
|
|
|
99.85 |
|
99.09 |
|
1.3 |
Peak Demand |
|
825Mn |
|
|
|
1.4 |
No. of consumer & connected Load |
|
251390 |
No C. Load |
611555 |
|
AP Temproary |
|
|
|
|
|
|
|
|
|
|
|
|
|
Category |
|
As on 31.10.05 |
Load in Kw |
|
|
DS |
|
155971 |
|
171786 |
|
|
|
CS |
|
19388 |
|
30803 |
|
|
|
SP |
|
2960 |
|
24237 |
|
|
|
MS |
|
177 |
|
9666 |
|
|
|
LS |
|
42 |
|
18433 |
|
|
|
AP/SP |
|
196 |
|
694 |
|
|
|
AP METERED |
310 |
|
1278 |
|
|
|
AP UNMETERED |
72292 |
|
339029 |
|
|
|
SL |
|
12 |
|
165 |
|
|
|
BS |
|
41 |
|
4664 |
|
|
|
RLY TRACTION |
1 |
|
10800 |
|
|
|
TOTAL |
|
251390 |
|
611555 |
|
|
|
|
|
|
|
|
|
|
2 |
Energy accounting |
in put end 31.3.05 |
11241.41 |
|
|
2.1 |
Energy cosumption per year |
|
31.3.05 |
8448.18 |
|
|
|
|
Ending10/04 |
Ending 10/05 |
Inc/Dec |
|
|
2.2 |
Energy input in lacs |
8269.97 L. U. |
8675.06 |
|
(+)4.89 |
|
|
|
|
|
|
|
|
|
2.3 |
Energy sold in lacs |
6148.12 |
5593.5 |
|
(-) 9.02 |
|
|
|
|
|
|
|
|
|
2.4 |
Energy losses |
25.65% |
35.52% |
|
(-)38.47 |
|
|
|
|
|
|
|
|
|
2.5 |
Revenue assessed 2003/04 end 3/05 |
End 10/04 |
End 10/05 |
Inc/Dec % |
|
(In Lacs) |
9384.78 |
10248.59 |
5907.3 |
6542.9 |
10.76% |
|
|
|
|
|
|
|
|
|
2.6 |
Sundry Debter |
Ending 10/2004 |
|
|
Ending 10/2005 |
|
|
Assesment Realisation |
Recoery % |
Assesment Realisation |
Recoery % |
|
6220.09 |
4859.1 |
78.12 |
6863.95 |
5307.06 |
|
77.32 |
|
|
|
|
|
|
|
|
2.7 |
Deft Amt |
Total Amt |
Recoverable |
|
|
|
|
end 9/03 |
1690.77 |
944.66 |
|
|
|
|
|
" 9/04 |
3311.56 |
944.66 |
|
|
|
|
|
" 6/04 |
2716.37 |
2776.22 |
|
|
|
|
|
" 3/05 |
4694.35 |
4137 |
|
|
|
|
|
" 10/05 |
5755.99 |
5171.09 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Total villages |
|
|
617 No |
|
|
|
3.1 |
No of vill. Given 24 hrs supply |
|
482 NO |
|
|
|
3.2 |
No of vill. Given 24 hrs supply |
|
135 NO |
|
|
|
|
yet to be given |
|
|
|
|
|
3.3 |
Growth of conn. During 2004-05 |
2.97% |
|
|
|
3.4 |
Growth of load During 2004-05 |
|
19.32% |
|
|
|
3.5 |
Total conn. Released 2004/05 |
|
7235 NO |
|
|
|
3.6 |
Total load Released 2004/05 |
|
97396 Kw |
|
|
|
3.7 |
Pending App End 30.9.05 |
|
18026 NO |
|
|
|
3.8 |
Pending App load End 30.9.05 |
|
50512 KW |
|
|
|
|
|
|
|
|
|
|
|
|
66/11 KV Grid Sub Station |
|
|
|
|
|
|
|
33/11 KV Grid Sub Station |
|
|
|
|
|
|
|
66KV Feeders |
|
|
|
|
|
|
|
|
Length of 66KV Line |
|
|
|
|
|
|
11KV Feeders |
|
|
|
|
|
|
|
|
Length of 11KV Line |
|
|
|
|
|
|
|
Length of LT Line |
|
|
|
|
|
|
|
HT/LT Ratio |
|
|
|
|
|
|
|
|
No.of Distribution T/Fs capacity-wise ending 9/2005
|
|
|
|
|
|
Total No.of Distribution T/Fs
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NO.of current complaints per thousand consumers:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No.of Consumers & Connected load ending
12/05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Energy consumption per year
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Energy Input (In Lacs) |
|
|
|
|
|
|
|
|
Energy Sold (In Lacs) |
|
|
|
|
|
|
|
|
Energy losses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenue Assessed(In Lacs)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No.of Village given 24 hrs. supply
|
|
|
|
|
|
|
|
No.of Village where24 hrs. supply
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ACHIEVEMENTS ENDING 31-01-2007--
BORDER ZONE AMRITSAR.
1. Total No. of Connections/Connected Load
| Sr.No. |
Category |
No. of Connections |
Connected load (in KW) |
| 1 |
DS |
802745 |
1214024 |
| 2 |
NRS |
146412 |
335643 |
| 3 |
SP |
19527 |
173814 |
| 4 |
MS |
2659 |
141817 |
| 5 |
LS |
365 |
216454 |
| 6 |
SL |
221 |
4841 |
| 7 |
BS |
180 |
66519 |
| 8 |
AP |
223025 |
890655 |
| |
Total |
1195134 |
3043767 |
2. Release of Connections
| Sr.No. |
Category |
4/06 to 12/06 No. |
During
01/07 |
upto 01/07 |
| 1 |
GSC |
21685 |
2306 |
23991 |
| 2 |
ISC |
502 |
58 |
560 |
| 3 |
AP |
4571 |
228 |
4799 |
| 4 |
Others |
98 |
12 |
110 |
| |
Total |
26856 |
2604 |
29460 |
3. Pending Test Reports
| Sr.No. |
Category |
Pending Test Reports (No.) |
Date of oldest Pending Test Report |
| 1 |
GSC |
6105 |
12.7.05 |
| 2 |
ISC |
81 |
10.11.06 |
| 3 |
AP |
4206 |
28.5.01 |
| Total |
10392 |
28.5.01 |
4. Grid Sub-Stations
| Sr.No. |
Description |
No. |
Installed Capacity (in MVA) |
No. |
Installed Capacity
(in MVA) |
| During 01/07 |
upto 01/07 |
| 1 |
220 KV |
0 |
0.00 |
0 |
0.00 |
| 2 |
132 KV |
0 |
0.00 |
0 |
0.00 |
| 3 |
66 KV |
0 |
0.00 |
93 |
1727.50 |
| 4 |
33 KV |
0 |
0.00 |
4 |
22.00 |
| |
Total |
0 |
0.00 |
97 |
1749.50 |
5.
| Sr.No. |
Description (Length) |
Length of lines (in KMs) |
| upto 12/06 |
during 01/07 |
upto 01/07 |
| 1 |
11 KV |
20670 |
189 |
20859 |
| 2 |
LT |
35479 |
38 |
35517 |
6. De-loading of Distribution T/Fs
| Sr.No. |
Capacity of DS T/F |
No. of DS T/Fs de-loaded |
| Ending 12/06 |
During 01/07 |
End. 01/07 |
| 1 |
25 KVA |
153 |
88 |
241 |
| 2 |
63 KVA |
144 |
66 |
210 |
| 3 |
100 KVA |
102 |
20 |
122 |
| 4 |
200 KVA |
10 |
3 |
13 |
| Total |
409 |
177 |
586 |
7. Distribution Transformers
| Sr.No. |
Distribution T/Fs ;l(in KVA) |
upto 12/06 (Nos.) |
during 01/07 (Nos.) |
Upto 01/07 (Nos.) |
| 1 |
6.3 KVA |
202 |
88 |
290 |
| 2 |
10/16 KVA |
75 |
20 |
95 |
| 3 |
25 KVA |
14833 |
404 |
15237 |
| 4 |
63 KVA |
18075 |
146 |
18221 |
| 5 |
75 KVA |
3 |
0 |
3 |
| 6 |
100 KVA |
10020 |
25 |
10045 |
| 7 |
200 KVA |
1860 |
14 |
1874 |
| 8 |
300 KVA |
311 |
2 |
313 |
| 9 |
400 KVA |
24 |
0 |
24 |
| 10 |
500 KVA |
220 |
0 |
220 |
| 11 |
750 KVA |
44 |
0 |
44 |
| 12 |
1000 KVA |
28 |
0 |
28 |
| Total |
45695 |
699 |
46394 |
8. UPS to Villages
| a) Total No of Villages |
|
Nos. 3077 |
| b) UPS given ending 31.12.06 |
|
Nos. 3049 |
9. T & D Losses
| Billing cycle |
2005-06 |
2006-07 |
% Increase/ Decrease |
| Ending Cy-1 |
39.55 |
38.95 |
-0.6 |
| Ending Cy-2 |
33.56 |
38.37 |
4.81 |
| Ending Cy-3 |
33.24 |
35.65 |
2.41 |
| Ending Cy-4 |
33.44 |
31.80 |
-1.64 |
10. APDRP Works
| Area |
Amount for which scheme is sanctioned |
Amount to be spent by DS |
Amount utilised |
%age utilization |
| Batala |
1630.57 |
1305.86 |
448.34 |
34.33 |
| Gurdaspur |
480.4 |
352.2 |
332.13 |
94.30 |
| Pathankot |
1229.79 |
840.38 |
577.85 |
68.77 |
| Suburban Asr |
9851.97 |
9383 |
3965.07 |
42.26 |
| T/Taran. |
344.26 |
344.26 |
168.50 |
48.95 |
| City Asr |
4975.70 |
2665.37 |
1815.65 |
68.11 |
| Total |
|
18512.69 |
14891.07 |
7307.543 |
49.07 |
|
|
|
|
|
|
11.
Revenue of Border Zone
(Rs. In lacs) |
upto 12/06 |
during 01/07 |
Upto 01/07 |
| 51460.61 |
5714.46 |
60029.31 |
12. Replacement of Electro-mechanical Meters with Electronic Meters
| Category |
No. of Connections |
Replaced with Electronic Meters |
%age |
| During 01/07 |
End. 01/07 |
| DS |
1- Ph |
786624 |
4670 |
475144 |
|
| 3-Ph |
18646 |
25 |
13032 |
|
| CS |
1- Ph |
140563 |
853 |
97729 |
|
| 3-Ph |
5787 |
26 |
5787 |
|
| SP |
19421 |
34 |
19395 |
|
| MS |
2655 |
8 |
2646 |
|
| Total |
973696 |
5616 |
613733 |
0 |
13. Progress of Installation of MCBs
| Category |
No. of Connections |
MCBs provided |
Balance |
| During 01/07 |
End. 01/07 |
| DS |
801666 |
2676 |
227843 |
367670 |
| CS |
146337 |
628 |
39638 |
78520 |
| Total |
948003 |
3304 |
267481 |
446190 |
14. Defaulting Amount
| Ending 01/2006 |
| Cate-gory |
PDCOs |
Others |
Total Recov. Def. Amt. |
| No |
Amt. |
No |
Amt. |
No |
Amt. |
| ISC |
4430 |
585.97 |
1690 |
145.35 |
6120 |
731.32 |
| AP |
509 |
25.44 |
119755 |
6804.89 |
120264 |
6830.33 |
| GSC |
83562 |
2879.15 |
90187 |
1796.29 |
173749 |
4675.44 |
| Total |
88501 |
3490.56 |
211632 |
8746.53 |
300133 |
12237.09 |
| End. 01/07 |
| Cate-gory |
PDCOs |
Others |
Total Recov. Def. Amt. |
| No |
Amt. |
No |
Amt. |
No |
Amt. |
| ISC |
4415 |
550.14 |
1641 |
151.57 |
6056 |
701.71 |
| AP |
483 |
27.79 |
106502 |
6028.91 |
106985 |
6056.7 |
| GSC |
91291 |
3424.99 |
96474 |
1852.99 |
187765 |
5277.98 |
| Total |
96189 |
4002.92 |
204617 |
8033.47 |
300806 |
12036.39 |
15. Meter Pillar Boxes installed = Nos. 446 16. Detection of theft
of energy End. 01/07
| Description |
upto 12/06 |
during 01/07 |
Upto 01/07 |
| a) No. of Connections checked |
|
441203 |
33718 |
474921 |
| b)No. of Cases detected |
|
42103 |
894 |
42997 |
| c) Amount Charged (Rs in lacs)
|
|
1319.64 |
31.77 |
1351.41 |
| d) Amount Recovered (Rs. in lacs)
|
645.39 |
32.72 |
678.11 |
17. Key-exceptions
| Description |
GSC ending Cy-5 |
SP ending Cy-10 |
| Meter Defective |
18694 |
179 |
| Meter Burnt |
3052 |
142 |
| Meter Glass Broken |
265 |
1 |
| M & T Seal Broken |
1550 |
8 |
| Total |
23561 |
330 |
18. Meters Taken Out from the Premises of Consumers
| Category |
Total No. of Connections |
Meters taken out of the premises of consumers |
| Ending 30-04-06 |
Ending 31-01-07 |
| DS |
806055 |
47868 |
115990 |
| NRS |
146449 |
5078 |
7699 |
| SP |
17418 |
1123 |
2992 |
| MS |
2655 |
454 |
522 |
| Total |
972577 |
54523 |
127203 |
Dy.CE/Hqr-cum-