REQUISITION FORM FOR INDUSTRIAL/BULK SUPPLY
(FOR LOADS EXCEEDING 500 KW)
Requisition
No._________________
Date:__________________
To
SE/Dy.
Chief Engineer/Op.
P.S.E.B.,
Circle,
___________________
Sir,
I/We hereby request you to
supply energy for the following premises owned/occupied by me/us. Load/Contract
demand and other particulars are detailed below:-
1. Motive /Industrial
Load(KW)
2. General Load(Light,
fans, heaters,
refrigerator
etc)(KW)
3. Load for residential
colony (KW)
4. Total Load(KW)
5. Contract Demand(KVA)
6. Transformer
Capacity(KVA)
7. Supply voltage
8. In case of extension
in load,
Details
of present load/
Present
Contract demand
9. Type of Industry
10. Capacity of furnace(Arc/Induction)
transformer(KVA)
and voltage ratio.
11. Details of premises(Alongwith Map)
12. Distance from Sub-Station
13. Special feeder if required
14. Any other details
I/We request that
permission to file requisition for above Load/Contract Demand may be granted.
(Signature of
Applicant)
Full
Address:_______________________
___________________________________
___________________________________
Earnest
Money_________________________
BA-16
No.______________________________
Dated:________________________________
Issued to Sh//M/s._________________________________S/o_______________________
Signature
Consumer Clerk
List of documents to be submitted:-
1. Certified copy of the Articles of Association/memorandum
2. Certified copy of the Incorporation of the company
3. Certified copy of the partnership deed.
4. Certified copy of registration of the firm by the Registrar of the firms.
5. Certified copy of Constitution of the society/trust.
6. Certified copy of the registration of the society by the Registrar of
Societies.
7. Special power of attorney for the authorized signatory duly notarized.
8. Certified copy of the resolution authorizing the signatory to sign on
behalf of the company.
9. Certified copy of the NOC from PPCB.
10. Certified copy of NOC from PUDA.
11. Undertaking that the company or its sister concern is not involved in
theft case.
12. Undertaking that no court case or dispute is pending.
13. Undertaking to the effect that the consumer shall not claim damages in
the event of fluctuation on the system.
14. Undertaking that no other connection is running in the same premises.
PUNJAB
STATE ELECTRICITY BOARD
APPLICATION
AND AGREEMENT FOR
(For
Loads up to 100 KW other than DS/NRS categories)
PSEB CS-I Sr. No???.(to be machine numbered)
For
Official use only
1. Name
of Sub division_________________
2. Applicants
Name/Designation____________________
3. Is
applicant a member of Scheduled Caste/Back ward Classes___________
4. Security
Receipt No. and Date ____________________
5. Current
Account No. (If any) ______________________
6. a) Present connected Load (if any) ________________
b) Load applied
___________________
c) Total Load
_____________________
?????????????????????????????????????..
(To
be completed and signed by Applicant)
To
The__________________
Punjab State Electricity Board,
________________________
I/We hereby agree to take
from Punjab State Electricity Board (herein-after referred to as the Board) at
the premises stated below, a supply of electrical energy not exceeding the
connected load of my/our installation as below, and I/We hereby further agree to
pay for the said supply in accordance with the relevant tariff, as amended from
time to time and also to pay for all such other charges as may become due by
me/us to the Board from time to time at rates laid down in the Schedule of
General and Service Connection Charges prescribed by the Board from time to
time. I/We further agree that I/We shall, as and when required by the Board to
do so, lodge with the Local office of the Board Security Against Consumption as
per the rates specified by the PSEB in Schedule of General & Service
Connection Charges. And I/We hereby declare that we shall be bound by the
Electricity Supply Regulations including Schedules of Tariffs and Schedule of
General and Service Connection Charges approved by PSERC and also the provision
of the Electricity Act-2003 and rules & regulations made thereunder.
I/We further require you
to supply me/us with the necessary meter/meters on hire in terms of Section 55
of Electricity Act, 2003. I/We agree to give you such security as may be
required for the price of the meter/meters whenever called upon to do so.
Description of Premises:-
house/ship/premises
No????..Locality??????..Town/Village?????
I/We also declare that
I/We am/are owner/landlord
of the premises or my/our/landlord/owner agrees to my/our taking the said supply
and his/their written consent is attached herewith.
or
I/We are the lawful
occupier/s of the premises but it has not been possible for me/us to obtain
consent from the landlord and I/We herby agree to keep the PSEB indemnified and
harmless against all claims made and action and proceedings taken up by the
landlord or any person claiming through or under him by reason of giving of this
electric connection by the PSEB to me/us.
2. I/We hereby agree
that I/We shall abide by the power cut restrictions/peak load hours
restrictions.
3. It
is disclosed that I/We am/are major.
4. The authorized representative of the Board can check energy consuming
apparatus at my/our premises at any time.
????????????????????????????????????.
Schedule of energy consumption apparatus:
????????????????????????????????????..
|
LIGHT AND FAN
Lamps, Wall Plugs and other Lighting load
|
HEAT AND POWER
Appliances, Heater, Cookers, Refrigerator and
Power Plugs etc.
|
INDUSTRIAL LOAD
Motores
etc..
|
|
Description No. Wattage Total
each KW
|
Description No. Wattage Total
each KW
|
Description No. HP/KW Total
each KW
|
|
Light
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fans
|
|
|
|
|
|
|
|
Wall Sockets
|
|
|
|
Connected Load
|
Connected load
|
Connected load
|
Total connected load???????.KW Supply Voltage????????..V/KV
Signature of
witnesses?????????? Signature
of Applicant???????
Name?????????????.. Name??????????????.
Address????????????.. Present Address?????????..
PSEB Account No???????? ????????????..
Dated??????????????..
Signature of
representative
of PSEB with
designation.
Note:- Applicant will sign in the presence of XEN/AEE/AE/JE/RA/ARA and in case
of Sub-Office Addl. AE/JE. Officer will ensure that this form has been filed in
correctly. He will sign after satisfying himself that form has been signed in
his presence.
Dated???????????
Signature of officer/official verifying the
correctness of the application.
Name:????????
Designation:?????.
FOR OFFICE USE ONLY
General Load??????????.
Motive Load if any????????..
Total connected load?????????
Watts/Kilowatts/LT(400 Volts)/HT (11 KV)
FORM NO.CS-1-A ANNEXURE-I
Application
and Agreement Form
cum
Consumer Case for
Release of
General Service
Connection
(Category:
DS/NRS)
Name of
Applicant/Consumer:_______________________________________
Complete
Address:________________________________________________
________________________________________________________________
Sub-Division:_____________________________________________________
Price Rs.50/- Account No.___________
GUIDELINES
FOR THE PROSPECTIVE CONSUMER REGARDING
PROCESSING
OF THE CASE FOR RELEASE OF ELECTRIC CONNECTION
1. PSEB shall entertain only such prospective consumers who are ready to
take permanent connections and not those who have started construction of their
premises.
2. The applicant/consumer shall contact CC/RA to obtain an application and
agreement form at the prescribed rate.
3. The application and agreement form duly filled alongwith test report
shall be submitted to the CC./RA for further process.
4. The application and agreement form shall be checked by CC/RA in the
presence of the applicant/consumer and ensure that all the columns have been
filled in correctly and in case of any deficiency the same shall be got
completed from the applicant/consumer.
5. RA shall put up application and agreement form to the SDO/AEE/XEN(DS.)
for attestation of the photo of the applicant/consumer pasted on the form.
6. RA shall give details of amount to be deposited by the applicant/consumer
with the cashier.
7. The applicant/consumer shall deposit the required amount with the cashier
who will issue a printed receipt to the applicant/consumer in token of amount
received.
8. The applicant/consumer shall keep the original receipt with him and leave
the case file with the cashier. Formalities
on the part of the applicant/consumer shall be over.
9. The electric connection shall be released within seven days subject to
availability of material (maximum 30 days) and in case connection is not
released during this period, he may contact SDO/AEE/XEN (OP.)
10. In case of extension in load applied by the existing consumer, it shall
be considered deemed released on the day it is applied.
11. Single Phase electric connections (DS/NRS) shall be released up to 10KW
load only and above that three phase connections shall be released.
12. How to work out connected load by the applicant/consumer:-
|
Description
|
Domestic
|
NRS
|
Remarks
|
|
Light Points
|
60
Watts each. (1/2 of total No. of light points to be taken into account)
|
80
Watts each
|
|
|
Fan Points
|
80
Watts each.
|
100
Watts each
|
|
|
Wall Sockets
|
60
Watts each(1/4 of total No. of sockets to be taken into account)
|
60
Watts each(1/3rd of
total No. of sockets to be taken into account)
|
Fraction
of socket to be taken as one socket
|
|
Power Sockets
|
100
Watts each (1/3rd of
total No. of sockets to be taken into account)
|
2000
Watts each (1/2 of total No.
of sockets to be taken into account)
|
Fraction
of socket to be taken as one socket
|
Note:- (i) The
Load of air conditioners/AC packages/centralized AC systems of standard shall be
taken as per their nameplate. For
non standard window type air conditioners the total load shall be taken as 2.5
KW.
(ii) The
load of geysers connected through power sockets only and the additional load as
per rating/name place is not to be counted for the purpose of computing the
total connected load.
(iii) The load,
motors etc. shall be counted as per the name place.
PUNJAB
STATE ELECTRICITY BOARD APPLICATION AND AGREEMENT FORM
(For General Service Connections)
Category ?DS/NRS
To
The Sub Divisional
Officer,
____________Sub-Division, PSEB,
___________________________
Sub: Contract Agreement for release of
a new connection/extension /reduction in load. Account No.__________________(in
case of extension/reduction in load only)
1. I/We hereby agree to take from Punjab State Electricity Board(hereinafter
referred to as the Board) at the premises stated below, a supply of electrical
energy not exceeding the connected load of my/our installation as below, and
I/We hereby further agree to pay for the said supply in accordance with the
relevant tariff as amended from time to time and also to pay for all such other
charges as may become due by me/us to the board from time to time at rates laid
down in the Schedule of General and Service Connection Charges prescribed by the
Board from time to time. I/We further agree that I/We shall as and when required by
the Board to do so, lodge with the local office of the Board Security Against
Consumption as per specified rates. I/We hereby declare that we shall be bound
by the Electricity Supply Regulations including Schedules of Tariffs and
Schedule of General and Service Connection Charges approved by PSERC and also
the provision of the Electricity Act-2003 and rules & regulations made there
under.
2. I/We further require you to supply me/us with the necessary meter/meters
on hire in terms of section 55 of the ElectricityAct, 2003. I/We agree to give you such security as may be required for the price of
the meter/meters whenever called upon to do so. I/We agree to pay monthly rent for the meter(s) as fixed by the Board
from time to time.
3. Description of Premises:
House /Shop/ Premises No.______Locality_____________Town/ Village/
City_______________Pin Code_______ Telephone No._____________________
4. I/We declare on oath as under:-
i. It is disclosed
that I/We am/are major.
ii I/We, am/are owner/landlord of the premises or my/our landlord/owner
agrees to my/our taking the said supply from the Board.
OR
I/We are the lawful occupier/s of the premises but it has not been
possible for me/us to obtain consent from the landlord and I/We hereby agree to
keep the Board indemnified and harmless against all claims made and action and
proceedings taken up by the landlord or any person claiming through or under him
by reason of giving this electric connection by the Board to me/us.
iii I/we hereby agree that I/We shall abide by the power cut
restrictions/peak load hour restrictions imposed by the State Government/Board
from time to time.
iv My/our premises are within/outside the municipal limit.
v. My/our premises are ready and electrical installation complete in all
respect to receive power.
vi` I/We shall provide space for the installation of motor at the main entry
of the premises. The MCB shall be
provided by me/us.
vii The authorized representative of the Board can check energy consuming
apparatus/installation at my/our premises at any time.
viii There
is no other electric connection running in the above premises.
OR
One No. DS/NRS electric connection is already existing in the above
premises and I/We want to take second connection for which I/We are ready to pay
highest slab of tariff.
ix There is no defaulting amount/theft case/pending court case of the board
against my/our above premises.
x I/We do not have any dispute of any amount with the Board anywhere in
Punjab.
OR
I/We have a dispute of Rs.__________with Board for which compliance of
instructions of Board on the subject has been made.
xi The above premises is more than 5m /10m /30m /100m away from the road
reservation of Municipal Road./Schedule Road/Bye-pass.
xii I/We have applied this electric connection for domestic purpose and no
business activity shall be carried out in this premises without prior permission
from the Board.
OR
i/We have applied this electric connection for non residential purposes
only.
5. SCHEDULE OF ENERGY CONSUMING APPARATUS
|
Category
|
Description
|
No.
|
Wattage
each
|
Total
KW
|
|
A. Light Load
Lamps,Wall Plugs and other lighting load, etc.
|
Light
Points
|
|
|
|
|
Fan
Points
|
|
|
|
|
Wall
Sockets
|
|
|
|
|
|
|
|
|
|
Total
Light Load
|
|
B.Power
Load
Power
Plugs/Air Conditioners, etc.
|
Power
Plugs
|
|
|
|
|
Air
Conditioner
|
|
|
|
|
|
|
|
|
|
Total
Power Load
|
|
C.Other
Load
(
if any)
Motors
etc.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total
Other Load
|
|
Total
Connected Load(A+B+C)
|
KW
|
|
Supply
voltage
|
V/KV
|
6. I/We am/are enclosing herewith Wiring Contractors test report alongwith
A&A form. A copy of Challan of CEI(Pb) and permission accorded by him
is also enclosed (wherever applicable). I/We also certify that I/We will not
effect any change in wiring /connected load as given in the test load.
VERIFICATION:
I/we also undertake that
the above information is correct and in case I/We violate any
undertaking/instructions or any other information is found to be false at any
stage, my/our electric connection may not be released and if released, it may be
disconnected without prior notice and all charges deposited by me/us be
forfeited.
___________________
Signature of the applicant(s)
Date:__________
Name & Address:_______________
_____________________________
For
and on behalf of the Board
____________________
Signature
of the SDO/AEE/XEN/Sr.XEN/SE/Dy.CE(DS)
Date:__________________
Official
seal
(To be signed after release of
load)
FOR
OFFICE USE ONLY
A. ACTION BY R.A.
Whether new/extension/reduction in load. Existing Account No.___________
Existing connected load_____________KW,Applied Load+
_______________Total Load_______KW
Amount to be deposited on account of following:-
(i) Security Against Consumption Rs.__________________________
(ii)Meter Security Rs.__________________________
(iii)Service Connection Charges Rs.__________________________
(iv)Special/Any other Charges Rs.__________________________
Total Rs.__________________________
Cashier please accept Rs._________________(in
words)Rs.________________________________
Dated:____________________
Signature of R.A.
Name:___________________
(NOTE: Test report
received with the A&A form to be pasted in the case file).
B. ACTION BY CASHIER
Received
Rs.____________(in words)Rs._________________________________________________
vide RO-4/BA-16 Receipt
No._______________________Book No.____________Dated___________
Signature of
Cashier
Name:____________________
(NOTE: RO-4/BA-16 receipt
shall be issued by the cashier to the applicant/consumer and shall send the case
to Consumer Clerk. The consumer clerk shall make entry in the service connection
register and pass on the case file to R.A )
C. ACTION BY CONSUMER CLERK
Entered in Service Connection Register at Serial
No._____________date________________
Signature of CC
Name:_________________
D. FOR FURTHER ACTION BY RA
Certified that the applicant has completed all the
formalities and has deposited the required amount. Work for release of his
connection/extension in load maybe taken in hand against the following
sanctioned estimate.
I Sanctioned Estimate No.__________Date____________Operative
period_________________
ii Sanctioned amount of the estimate Rs.__________________________________
iii Amount already spent Rs.__________________________________
iv Balance unspent amount Rs.__________________________________
Date:_______________ Signature of R.A.
Name:__________________
E. FOR ORDERS BY SDO/AEE/XEN(OP) INCHARGE
i Issue Service Connection order.
ii The work may be carried by Shri._________________________________JE.
Signature of SDO/AEE/XEN(OP)
Name:________________________
F. ISSUE OF JOB ORDERS BY RA
Service
Connection Order No._________________________Dated________________in the name of
Shri__________________________________JE issued.
Signature
of R.A.
Name:____________________
Dated:____________________
Signature
of JE_______________________
Name_______________________________
Date:_____________
G. INFORMATION/CERTIFICATES TO BE RECORDED BY THE JE FOR RECORD.
i The load
has been checked at site and found to be___________KW.
ii The
connection/extension/reduction in load has been released on______________
iii The connection/extension/reduction in load has been released
from__________(Name of Transformer)
iv The connection/extension/reduction in load has been released
from__________(Name of Feeder), Code No.__________.
v The entry has been made in connected load register.
vi Location of the premises of the applicant/consumer.
|
Left Side existing Premises
|
Applicant/Consumer
Premises
|
Right Side existing Premises
|
|
Acct . No.
|
|
Acct. No.
|
vii Certified that the connection has been released without any violation of
PSEB rules and regulations.
OR
Connection has not been released because of the following violations of
rules.
a.
b.
c
d.
viii Details of Material used for release of connection and its value:
|
Sr.
No.
|
Item
|
Quantity used
|
Rate as per Estimate
|
Amount(Rs.)
|
EMB
|
|
|
|
Mtrs.
|
Nos.
|
|
|
No.
|
Page
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total(Rs.)
|
Total Value of the material installed. Rs.______________________
Labour Charges Rs.______________________
Departmental Charges: Rs.______________________
Total Amount debited to the estimate Rs.______________________
ix Details of PSEB/PVT. Meter installed.
|
Meter
No.
|
Make
|
S.No.
of ME
|
Capacity
|
Phase
|
Voltage
|
No.
of Digits
|
Initial
Reading
|
ME-2
Register No./S.No.
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
|
|
|
|
|
|
|
|
|
|
Date:_______________ Signature of J.E.:______________
Name:____________________________
H. CERTIFICATE IN RESPECT OF CHECK ENTRIES TO BE RECORDED BY JE-1/ AAE/SDO
Quantity of material shown as used has been measured
and found to be correct except the following:-
|
Sr.
No.
|
Item
No.
|
Shown
Used
|
Actual
Measurement
|
Difference
|
|
|
|
Mtrs
|
Nos.
|
Mtrs
|
Nos.
|
Mtrs.
|
Nos.
|
|
I
|
|
|
|
|
|
|
|
|
ii
|
|
|
|
|
|
|
|
|
iii
|
|
|
|
|
|
|
|
|
iv
|
|
|
|
|
|
|
|
Date:____________________ Signature of JE-1/AAE/SDO
Name:____________________
I. CHECK ENTERIES TO BE RECORDED BY SDC
Certified that the above particulars have been
checked and entries compared with IWR/ EMB. No.________________Page_________
ME-2 Register No.______________.
Sr.No.______________Page_____________and found
correct.
Date:_________________