REQUISITION FORM FOR INDUSTRIAL/BULK SUPPLY
(FOR LOADS EXCEEDING 500 KW)
Requisition
No._________________
Date:__________________
To
SE/Dy.
Chief Engineer/Op.
P.S.E.B.,
Circle,
___________________
Sir,
I/We hereby request you to
supply energy for the following premises owned/occupied by me/us. Load/Contract
demand and other particulars are detailed below:-
1. Motive /Industrial
Load(KW)
2. General Load(Light,
fans, heaters,
refrigerator
etc)(KW)
3. Load for residential
colony (KW)
4. Total Load(KW)
5. Contract Demand(KVA)
6. Transformer
Capacity(KVA)
7. Supply voltage
8. In case of extension
in load,
Details
of present load/
Present
Contract demand
9. Type of Industry
10. Capacity of furnace(Arc/Induction)
transformer(KVA)
and voltage ratio.
11. Details of premises(Alongwith Map)
12. Distance from Sub-Station
13. Special feeder if required
14. Any other details
I/We request that
permission to file requisition for above Load/Contract Demand may be granted.
(Signature of
Applicant)
Full
Address:_______________________
___________________________________
___________________________________
Earnest
Money_________________________
BA-16
No.______________________________
Dated:________________________________
Issued to Sh//M/s._________________________________S/o_______________________
Signature
Consumer Clerk
List of documents to be submitted:-
1. Certified copy of the Articles of Association/memorandum
2. Certified copy of the Incorporation of the company
3. Certified copy of the partnership deed.
4. Certified copy of registration of the firm by the Registrar of the firms.
5. Certified copy of Constitution of the society/trust.
6. Certified copy of the registration of the society by the Registrar of
Societies.
7. Special power of attorney for the authorized signatory duly notarized.
8. Certified copy of the resolution authorizing the signatory to sign on
behalf of the company.
9. Certified copy of the NOC from PPCB.
10. Certified copy of NOC from PUDA.
11. Undertaking that the company or its sister concern is not involved in
theft case.
12. Undertaking that no court case or dispute is pending.
13. Undertaking to the effect that the consumer shall not claim damages in
the event of fluctuation on the system.
14. Undertaking that no other connection is running in the same premises.
PUNJAB
STATE ELECTRICITY BOARD
APPLICATION
AND AGREEMENT FOR
(For
Loads up to 100 KW other than DS/NRS categories)
PSEB CS-I Sr. No???.(to be machine numbered)
For
Official use only
1. Name
of Sub division_________________
2. Applicants
Name/Designation____________________
3. Is
applicant a member of Scheduled Caste/Back ward Classes___________
4. Security
Receipt No. and Date ____________________
5. Current
Account No. (If any) ______________________
6. a) Present connected Load (if any) ________________
b) Load applied
___________________
c) Total Load
_____________________
?????????????????????????????????????..
(To
be completed and signed by Applicant)
To
The__________________
Punjab State Electricity Board,
________________________
I/We hereby agree to take
from Punjab State Electricity Board (herein-after referred to as the Board) at
the premises stated below, a supply of electrical energy not exceeding the
connected load of my/our installation as below, and I/We hereby further agree to
pay for the said supply in accordance with the relevant tariff, as amended from
time to time and also to pay for all such other charges as may become due by
me/us to the Board from time to time at rates laid down in the Schedule of
General and Service Connection Charges prescribed by the Board from time to
time. I/We further agree that I/We shall, as and when required by the Board to
do so, lodge with the Local office of the Board Security Against Consumption as
per the rates specified by the PSEB in Schedule of General & Service
Connection Charges. And I/We hereby declare that we shall be bound by the
Electricity Supply Regulations including Schedules of Tariffs and Schedule of
General and Service Connection Charges approved by PSERC and also the provision
of the Electricity Act-2003 and rules & regulations made thereunder.
I/We further require you
to supply me/us with the necessary meter/meters on hire in terms of Section 55
of Electricity Act, 2003. I/We agree to give you such security as may be
required for the price of the meter/meters whenever called upon to do so.
Description of Premises:-
house/ship/premises
No????..Locality??????..Town/Village?????
I/We also declare that
I/We am/are owner/landlord
of the premises or my/our/landlord/owner agrees to my/our taking the said supply
and his/their written consent is attached herewith.
or
I/We are the lawful
occupier/s of the premises but it has not been possible for me/us to obtain
consent from the landlord and I/We herby agree to keep the PSEB indemnified and
harmless against all claims made and action and proceedings taken up by the
landlord or any person claiming through or under him by reason of giving of this
electric connection by the PSEB to me/us.
2. I/We hereby agree
that I/We shall abide by the power cut restrictions/peak load hours
restrictions.
3. It
is disclosed that I/We am/are major.
4. The authorized representative of the Board can check energy consuming
apparatus at my/our premises at any time.
????????????????????????????????????.
Schedule of energy consumption apparatus:
????????????????????????????????????..
|
LIGHT AND FAN
Lamps, Wall Plugs and other Lighting load
|
HEAT AND POWER
Appliances, Heater, Cookers, Refrigerator and
Power Plugs etc.
|
INDUSTRIAL LOAD
Motores
etc..
|
|
Description No. Wattage Total
each KW
|
Description No. Wattage Total
each KW
|
Description No. HP/KW Total
each KW
|
|
Light
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fans
|
|
|
|
|
|
|
|
Wall Sockets
|
|
|
|
Connected Load
|
Connected load
|
Connected load
|
Total connected load???????.KW Supply Voltage????????..V/KV
Signature of
witnesses?????????? Signature
of Applicant???????
Name?????????????.. Name??????????????.
Address????????????.. Present Address?????????..
PSEB Account No???????? ????????????..
Dated??????????????..
Signature of
representative
of PSEB with
designation.
Note:- Applicant will sign in the presence of XEN/AEE/AE/JE/RA/ARA and in case
of Sub-Office Addl. AE/JE. Officer will ensure that this form has been filed in
correctly. He will sign after satisfying himself that form has been signed in
his presence.
Dated???????????
Signature of officer/official verifying the
correctness of the application.
Name:????????
Designation:?????.
FOR OFFICE USE ONLY
General Load??????????.
Motive Load if any????????..
Total connected load?????????
Watts/Kilowatts/LT(400 Volts)/HT (11 KV)
FORM NO.CS-1-A ANNEXURE-I
Application
and Agreement Form
cum
Consumer Case for
Release of
General Service
Connection
(Category:
DS/NRS)
Name of
Applicant/Consumer:_______________________________________
Complete
Address:________________________________________________
________________________________________________________________
Sub-Division:_____________________________________________________
Price Rs.50/- Account No.___________
GUIDELINES
FOR THE PROSPECTIVE CONSUMER REGARDING
PROCESSING
OF THE CASE FOR RELEASE OF ELECTRIC CONNECTION
1. PSEB shall entertain only such prospective consumers who are ready to
take permanent connections and not those who have started construction of their
premises.
2. The applicant/consumer shall contact CC/RA to obtain an application and
agreement form at the prescribed rate.
3. The application and agreement form duly filled alongwith test report
shall be submitted to the CC./RA for further process.
4. The application and agreement form shall be checked by CC/RA in the
presence of the applicant/consumer and ensure that all the columns have been
filled in correctly and in case of any deficiency the same shall be got
completed from the applicant/consumer.
5. RA shall put up application and agreement form to the SDO/AEE/XEN(DS.)
for attestation of the photo of the applicant/consumer pasted on the form.
6. RA shall give details of amount to be deposited by the applicant/consumer
with the cashier.
7. The applicant/consumer shall deposit the required amount with the cashier
who will issue a printed receipt to the applicant/consumer in token of amount
received.
8. The applicant/consumer shall keep the original receipt with him and leave
the case file with the cashier. Formalities
on the part of the applicant/consumer shall be over.
9. The electric connection shall be released within seven days subject to
availability of material (maximum 30 days) and in case connection is not
released during this period, he may contact SDO/AEE/XEN (OP.)
10. In case of extension in load applied by the existing consumer, it shall
be considered deemed released on the day it is applied.
11. Single Phase electric connections (DS/NRS) shall be released up to 10KW
load only and above that three phase connections shall be released.
12. How to work out connected load by the applicant/consumer:-
|
Description
|
Domestic
|
NRS
|
Remarks
|
|
Light Points
|
60
Watts each. (1/2 of total No. of light points to be taken into account)
|
80
Watts each
|
|
|
Fan Points
|
80
Watts each.
|
100
Watts each
|
|
|
Wall Sockets
|
60
Watts each(1/4 of total No. of sockets to be taken into account)
|
60
Watts each(1/3rd of
total No. of sockets to be taken into account)
|
Fraction
of socket to be taken as one socket
|
|
Power Sockets
|
100
Watts each (1/3rd of
total No. of sockets to be taken into account)
|
2000
Watts each (1/2 of total No.
of sockets to be taken into account)
|
Fraction
of socket to be taken as one socket
|
Note:- (i) The
Load of air conditioners/AC packages/centralized AC systems of standard shall be
taken as per their nameplate. For
non standard window type air conditioners the total load shall be taken as 2.5
KW.
(ii) The
load of geysers connected through power sockets only and the additional load as
per rating/name place is not to be counted for the purpose of computing the
total connected load.
(iii) The load,
motors etc. shall be counted as per the name place.
PUNJAB
STATE ELECTRICITY BOARD APPLICATION AND AGREEMENT FORM
(For General Service Connections)
Category ?DS/NRS
To
The Sub Divisional
Officer,
____________Sub-Division, PSEB,
___________________________
Sub: Contract Agreement for release of
a new connection/extension /reduction in load. Account No.__________________(in
case of extension/reduction in load only)
1. I/We hereby agree to take from Punjab State Electricity Board(hereinafter
referred to as the Board) at the premises stated below, a supply of electrical
energy not exceeding the connected load of my/our installation as below, and
I/We hereby further agree to pay for the said supply in accordance with the
relevant tariff as amended from time to time and also to pay for all such other
charges as may become due by me/us to the board from time to time at rates laid
down in the Schedule of General and Service Connection Charges prescribed by the
Board from time to time. I/We further agree that I/We shall as and when required by
the Board to do so, lodge with the local office of the Board Security Against
Consumption as per specified rates. I/We hereby declare that we shall be bound
by the Electricity Supply Regulations including Schedules of Tariffs and
Schedule of General and Service Connection Charges approved by PSERC and also
the provision of the Electricity Act-2003 and rules & regulations made there
under.
2. I/We further require you to supply me/us with the necessary meter/meters
on hire in terms of section 55 of the ElectricityAct, 2003. I/We agree to give you such security as may be required for the price of
the meter/meters whenever called upon to do so. I/We agree to pay monthly rent for the meter(s) as fixed by the Board
from time to time.
3. Description of Premises:
House /Shop/ Premises No.______Locality_____________Town/ Village/
City_______________Pin Code_______ Telephone No._____________________
4. I/We declare on oath as under:-
i. It is disclosed
that I/We am/are major.
ii I/We, am/are owner/landlord of the premises or my/our landlord/owner
agrees to my/our taking the said supply from the Board.
OR
I/We are the lawful occupier/s of the premises but it has not been
possible for me/us to obtain consent from the landlord and I/We hereby agree to
keep the Board indemnified and harmless against all claims made and action and
proceedings taken up by the landlord or any person claiming through or under him
by reason of giving this electric connection by the Board to me/us.
iii I/we hereby agree that I/We shall abide by the power cut
restrictions/peak load hour restrictions imposed by the State Government/Board
from time to time.
iv My/our premises are within/outside the municipal limit.
v. My/our premises are ready and electrical installation complete in all
respect to receive power.
vi` I/We shall provide space for the installation of motor at the main entry
of the premises. The MCB shall be
provided by me/us.
vii The authorized representative of the Board can check energy consuming
apparatus/installation at my/our premises at any time.
viii There
is no other electric connection running in the above premises.
OR
One No. DS/NRS electric connection is already existing in the above
premises and I/We want to take second connection for which I/We are ready to pay
highest slab of tariff.
ix There is no defaulting amount/theft case/pending court case of the board
against my/our above premises.
x I/We do not have any dispute of any amount with the Board anywhere in
Punjab.
OR
I/We have a dispute of Rs.__________with Board for which compliance of
instructions of Board on the subject has been made.
xi The above premises is more than 5m /10m /30m /100m away from the road
reservation of Municipal Road./Schedule Road/Bye-pass.
xii I/We have applied this electric connection for domestic purpose and no
business activity shall be carried out in this premises without prior permission
from the Board.
OR
i/We have applied this electric connection for non residential purposes
only.
5. SCHEDULE OF ENERGY CONSUMING APPARATUS
|
Category
|
Description
|
No.
|
Wattage
each
|
Total
KW
|
|
A. Light Load
Lamps,Wall Plugs and other lighting load, etc.
|
Light
Points
|
|
|
|
|
Fan
Points
|
|
|
|
|
Wall
Sockets
|
|
|
|
|
|
|
|
|
|
Total
Light Load
|
|
B.Power
Load
Power
Plugs/Air Conditioners, etc.
|
Power
Plugs
|
|
|
|
|
Air
Conditioner
|
|
|
|
|
|
|
|
|
|
Total
Power Load
|
|
C.Other
Load
(
if any)
Motors
etc.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total
Other Load
|
|
Total
Connected Load(A+B+C)
|
KW
|
|
Supply
voltage
|
V/KV
|
6. I/We am/are enclosing herewith Wiring Contractors test report alongwith
A&A form. A copy of Challan of CEI(Pb) and permission accorded by him
is also enclosed (wherever applicable). I/We also certify that I/We will not
effect any change in wiring /connected load as given in the test load.
VERIFICATION:
I/we also undertake that
the above information is correct and in case I/We violate any
undertaking/instructions or any other information is found to be false at any
stage, my/our electric connection may not be released and if released, it may be
disconnected without prior notice and all charges deposited by me/us be
forfeited.
___________________
Signature of the applicant(s)
Date:__________
Name & Address:_______________
_____________________________
For
and on behalf of the Board
____________________
Signature
of the SDO/AEE/XEN/Sr.XEN/SE/Dy.CE(DS)
Date:__________________
Official
seal
(To be signed after release of
load)
FOR
OFFICE USE ONLY
A. ACTION BY R.A.
Whether new/extension/reduction in load. Existing Account No.___________
Existing connected load_____________KW,Applied Load+
_______________Total Load_______KW
Amount to be deposited on account of following:-
(i) Security Against Consumption Rs.__________________________
(ii)Meter Security Rs.__________________________
(iii)Service Connection Charges Rs.__________________________
(iv)Special/Any other Charges Rs.__________________________
Total Rs.__________________________
Cashier please accept Rs._________________(in
words)Rs.________________________________
Dated:____________________
Signature of R.A.
Name:___________________
(NOTE: Test report
received with the A&A form to be pasted in the case file).
B. ACTION BY CASHIER
Received
Rs.____________(in words)Rs._________________________________________________
vide RO-4/BA-16 Receipt
No._______________________Book No.____________Dated___________
Signature of
Cashier
Name:____________________
(NOTE: RO-4/BA-16 receipt
shall be issued by the cashier to the applicant/consumer and shall send the case
to Consumer Clerk. The consumer clerk shall make entry in the service connection
register and pass on the case file to R.A )
C. ACTION BY CONSUMER CLERK
Entered in Service Connection Register at Serial
No._____________date________________
Signature of CC
Name:_________________
D. FOR FURTHER ACTION BY RA
Certified that the applicant has completed all the
formalities and has deposited the required amount. Work for release of his
connection/extension in load maybe taken in hand against the following
sanctioned estimate.
I Sanctioned Estimate No.__________Date____________Operative
period_________________
ii Sanctioned amount of the estimate Rs.__________________________________
iii Amount already spent Rs.__________________________________
iv Balance unspent amount Rs.__________________________________
Date:_______________ Signature of R.A.
Name:__________________
E. FOR ORDERS BY SDO/AEE/XEN(OP) INCHARGE
i Issue Service Connection order.
ii The work may be carried by Shri._________________________________JE.
Signature of SDO/AEE/XEN(OP)
Name:________________________
F. ISSUE OF JOB ORDERS BY RA
Service
Connection Order No._________________________Dated________________in the name of
Shri__________________________________JE issued.
Signature
of R.A.
Name:____________________
Dated:____________________
Signature
of JE_______________________
Name_______________________________
Date:_____________
G. INFORMATION/CERTIFICATES TO BE RECORDED BY THE JE FOR RECORD.
i The load
has been checked at site and found to be___________KW.
ii The
connection/extension/reduction in load has been released on______________
iii The connection/extension/reduction in load has been released
from__________(Name of Transformer)
iv The connection/extension/reduction in load has been released
from__________(Name of Feeder), Code No.__________.
v The entry has been made in connected load register.
vi Location of the premises of the applicant/consumer.
|
Left Side existing Premises
|
Applicant/Consumer
Premises
|
Right Side existing Premises
|
|
Acct . No.
|
|
Acct. No.
|
vii Certified that the connection has been released without any violation of
PSEB rules and regulations.
OR
Connection has not been released because of the following violations of
rules.
a.
b.
c
d.
viii Details of Material used for release of connection and its value:
|
Sr.
No.
|
Item
|
Quantity used
|
Rate as per Estimate
|
Amount(Rs.)
|
EMB
|
|
|
|
Mtrs.
|
Nos.
|
|
|
No.
|
Page
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total(Rs.)
|
Total Value of the material installed. Rs.______________________
Labour Charges Rs.______________________
Departmental Charges: Rs.______________________
Total Amount debited to the estimate Rs.______________________
ix Details of PSEB/PVT. Meter installed.
|
Meter
No.
|
Make
|
S.No.
of ME
|
Capacity
|
Phase
|
Voltage
|
No.
of Digits
|
Initial
Reading
|
ME-2
Register No./S.No.
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
|
|
|
|
|
|
|
|
|
|
Date:_______________ Signature of J.E.:______________
Name:____________________________
H. CERTIFICATE IN RESPECT OF CHECK ENTRIES TO BE RECORDED BY JE-1/ AAE/SDO
Quantity of material shown as used has been measured
and found to be correct except the following:-
|
Sr.
No.
|
Item
No.
|
Shown
Used
|
Actual
Measurement
|
Difference
|
|
|
|
Mtrs
|
Nos.
|
Mtrs
|
Nos.
|
Mtrs.
|
Nos.
|
|
I
|
|
|
|
|
|
|
|
|
ii
|
|
|
|
|
|
|
|
|
iii
|
|
|
|
|
|
|
|
|
iv
|
|
|
|
|
|
|
|
Date:____________________ Signature of JE-1/AAE/SDO
Name:____________________
I. CHECK ENTERIES TO BE RECORDED BY SDC
Certified that the above particulars have been
checked and entries compared with IWR/ EMB. No.________________Page_________
ME-2 Register No.______________.
Sr.No.______________Page_____________and found
correct.
Date:_________________ Signature of SDC
Name:____________________
(NOTE: File to be passed on
to RA for allotment of Account No. and issue of provisional bill)
J. ISSUE OF ACCOUNT NO. PROVISIONAL BILL AND DATA FOR COMPUTER
CENTER(MASTER FILE) BY R.A.
i The Consumer has been allotted permanent Account No:___________________
ii First provisional bill for Rs.____________(in
words)___________________________
issued on date_____________________
iii Data for computer center master file:
|
Sub-Divn.
Code
|
Billing
Group
|
Acct.No.
|
Name
of Consumer
|
Address
of Consumer
|
Connected
Load
|
D.O.C.
|
Tariff
Type
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Feeder
Code
|
Meter
No
|
Make
|
S.No.of
ME
|
Capacity
|
Phase
|
Voltage
|
No.
of Digits
|
Initial
Reading
|
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date:________________ Signature of R.A.
Name:_________________________
(NOTE: Case file to be sent to
computer center for the preparation of Master file and issue of regular bill).
K. FOR ACTION BY THE COMPUTER CENTER
i Master
file of the consumer has been prepared and stored.
ii Regular bill issued on__________with bill group No.__________________and
provisional bill of Rs.____________adjusted.
Dated:__________ Signature in charge Computer Center
Name:__________________________
(NOTE:
Case file to be sent back to the respective Sub-Division for Record)
PSEB CS-I-(HT/EHT)
PUNJAB
STATE ELECTRICITY BOARD
AGREEMENT FOR HIGH TENSION AND EXTRA HIGH TENSION
SUPPLY
THIS
AGREEMENT MADE THIS___day of_______20__ between the Punjab State Electricity
Board(hereinafter called the 'Board' which expression shall where the context so
admits include its successors in office and assign)having its Head Office at
Patiala of the one part and____________________________________(hereinafter
called 'Consumer' which expression where the context so admits shall include his
heirs, executors, administrators , legal representatives successors in business
and assigns) of the other part.
Whereas the consumer has
requested the Board to supply him with electrical energy at his premises
situated_____________________ and indicated in red ink in the map attached
hereto for the purpose of__________and the Board has agreed to supply to the
consumer such energy upon the terms and conditions hereinafter contained.
NOW IT IS HEREBY
DECLAREDAND AGREED AS FOLLOWS:
1(a) Subject to the provisions hereinafter contained and during the
continuance of this agreement the Board shall give supply to the consumer at one
point or more, as the Board may decide for industrial/bulk/_____supply purpose,
at his premises referred to above up to a maximum demand of __________KVA(________________)
(hereinafter called contract demand) subject to provisions of condition No.23
hereof connected load of the consumer shall not exceed_______KW(____________) .
Installed capacity of the step down transformers at the premises of the consumer
shall not exceed_______KVA(____________________).
(b) The consumer shall not sell the electrical energy taken under sub
clause1(a) above, without obtaining the prior sanction in writing of the
Govt./Board.
2. The electrical energy so supplied shall be of three phase, alternating
current, at a declared pressure (voltage) of________-thousand volts between
phases and at a frequency of 50 cycles per second at the terminals. The frequency and pressure of the electricity energy at the point of
supply shall be subject to fluctuations that are ordinary, usual and incidental
to the generation and transmission of electrical energy but such fluctuations
shall not except owing to extraordinary reasons beyond the control of the Board,
exceed the tolerance limits permitted by the Indian Electricity Rules, 1956 or
any amendments/modifications thereof.
3. In case consumer gives an undertaking to take work in hand without
submitting test report and subsequently fails or neglects to obtain the supply
of electric energy from the date of readiness by Board to give supply, the
consumer shall be liable to pay to the Board from the said date the minimum
charges as laid down in the relevant schedule of tariff irrespective of the fact
that the consumer has not consumed any electric energy.
4. Unless otherwise agreed upon the point of supply shall be the outgoing
terminals of the metering equipment/circuit breaker or the cut out of the Board
installed at the consumer's/Board's premises from which electrical energy is
conveyed to the consumer.
5.(a) The Board shall provide and erect such switchgear and metering
equipment(hereinafter referred to as Board's apparatus) as may be necessary to
provide supply of power under this agreement and to measure the same.
(b) The
Board may, however, at its discretion provide metering equipment on low voltage
side of consumer's transformer and in such a case 3% shall be added to the
recorded maximum demand and units to cover transformation and cable losses.
(c) The
Board shall provide and erect such metering equipment(hereinafter called the
Board's apparatus) at its EHT sub-station as maybe necessary to afford the
supply of power under this agreement and to measure the same.
6. The consumer shall be solely responsible for and shall pay for any loss
or damage to any supply lines, main fuses, meters and/or other apparatus
belonging to the Board on the premises of the consumer whether caused
maliciously or through culpable negligence or default on the part of the
consumer or any of his employees.
7. (a)The consumer shall provide and maintain at his own cost an
accommodation (hereinafter called the consumer's Sub-Station) of a size and
construction to be approved by the Board for purpose of housing the Board's
terminal high tension switchgear and equipment.
(b)The consumer shall further provide free of cost to the Board necessary
land belonging to the consumer and afford all reasonable facilities for bringing
in not only the direct cables or overhead lines of the Board's system for
serving the consumer but also cable or overhead lines connecting Board's other
consumers and shall permit the Board to provide all requisite switchgear and
connections thereto on the above premises and to furnish supply to such other
consumers through cable and terminals situated on the consumer's premises
provided supply to the consumer in the opinion of the Board is not thereby
unduly affected.
(c)The consumer may with the written permission of the Board house his
own HT switchgear and other equipment connected with supply of energy to him
under this agreement as must necessarily be placed therein but such enclosures
shall not be used for any other purpose.
(d) The consumer shall provide and maintain at his own cost an accommodation suitable as per
requirement of the Board both in size and construction (to be approved by the
Board) for purpose of housing Board's metering arrangement nearest to the main
gate with independent access to the Board and also any other equipment including
measuring devices as may be considered necessary by the Board.
8. (a) All transformers,
switchgears and other electrical equipments belonging to the consumer directly
connected to the feeders or lines of the Board shall be of suitable design and
be maintained to the reasonable satisfaction of the Board. The settings of the fuses and relays on the consumer's control gear as
well as the rupturing capacity of any of its circuit breakers shall be subject
to the approval of the Board.
(b) In the event of any
defect(s) being discovered in consumer's installation connected to the Board's
mains or any earth or leakage occurring on any section of the circuits so
connected, the consumer, in the absence of any of the Board's authorized
employees shall immediately disconnect such part of the wiring or apparatus from
the circuits and notify the Board and the Board shall reserve the right to
disconnect at any time such sections from its supply system.
(c) The Board shall be under
no responsibility of any kind of connection with the consumer's installations or
any apparatus on the consumer's side of the supply point.
(d) The load on the three
phase of supply under the agreement shall be kept so balanced by the consumer
that the difference in current between any two phases at the time of maximum
demand shall not exceed 5% without the prior approval of the supplier in
writing.
9. The duly authorized employees of the Board shall be entitled at all
reasonable times, to enter the premises of the consumer for the purpose of
inspecting and testing his(Consumer) installation and /or for reading meter and
inspecting and testing any of apparatus belonging to the Board on consumer's
premises or for doing all things necessary or incidental to the proper giving or
maintaining supply to the consumer.
10. The Board shall not be liable for any claim for loss, damage or
compensation whatsoever arising out of failure or shortage of supply when such
failure or shortage is either directly or indirectly due to war, mutiny, civil
commotion, riot, strike, lockout, fire, flood, tempest, lightning, earthquake or
other force majeure causes or occurrences beyond the control of the Board.
11. (a) The consumer shall be
liable to pay the cost of service line and other equipment as may be laid down
or placed on his property for the purpose of supply to his premises as per the
Schedule of General and Service Connection Charges as in force at the time of
release of connection.
(b) Notwithstanding that the
cost of the full or a part of the service line has been paid for by the
consumer, the ownership thereof shall vest in the Board and will be maintained
by the Board at its cost. The Board
shall have a right to utilize the aforesaid service line and sub station in the
consumer's premises, place apparatus other than those required to control the
supply to the consumer and to lay overhead and underground feeders in the
property of the consumer with a view to connect the same with the apparatus
installed in any other consumer's premises. The consumer shall provide all necessary facilities for such a work.
12. The supply taken from the Board by the consumer under this agreement
shall be measured by the meter or meters installed by the Board at suitable
point or points. The Board shall be entitled to charge rent on account of such
metering equipment at such rates as may be in force from time to time.
13. The reading of the said meter shall be taken once in every month or at
such intervals as the Board may think expedient by the authorized
representatives of the Board. The readings so taken shall be binding and conclusive between
the consumer and the Board as to the amount of demand and electrical energy
supplied to the consumer. In case
consumer does not arrange for his representative to be available on the
scheduled date of taking the reading of the meters, the reading of meter taken
by the representatives of the Board shall be conclusive and the consumer shall
not have the right to raise any objection regarding the correctness or accuracy
of the readings. Meter readings
shall be noted in the meter card/pass book provided by the Board. The consumer shall ensure that the representative of the Board taking the
reading makes the entry in the meter card/duplicate pass book.
14. The meter shall be properly sealed by the authorized representative of
the Board in the presence of the consumer or his representative and shall not be
interfered with by the either.
15. The consumer shall be entitled on application to the Board to have a test
carried out on the meters at anytime and the expenses of such test shall be
borne by the Board or by the consumer accordingly as the meters are found
defective or correct as a result of such test. Such meters shall be deemed to be correct if the limits of the error do
not exceed those laid down in rule 57 of the Indian Electricity Rules,1956 or
any other statutory amendments/modifications thereof as maybe in force from time
to time.
16. (a) The consumer shall pay to
the Board every month charges for electrical energy supplied to the consumer
during the preceding month under this agreement in accordance with the
provisions and sale of rates set
forth in the tariff schedule as amended from time to time. The incidence of the fuel adjustment shall be in addition to any minimum
charges payable by the consumer. The
Board, if the exigencies so warrant, may change the method of charging.
(b) If the Board by
notification makes any alteration in the aforesaid scale of charges/tariff, such
altered rates shall be treated as if the same were part of this agreement in
super session of the charges set out in the schedule attached hereto with effect
from the date fixed in the notification and if no date is fixed in the
notification then from the date of issue of notification.
17. (a) If the consumer fails to
pay the amount of any bill due under this agreement within 10 days (or such
shorter period which the Board may prescribed at any time )from the date of bill
referred to, he shall be liable to pay late payment surcharge as provided in the
schedule of tariffs. If the amount of such bill remains unpaid for 10 days after
the date of its presentation, the Board shall without prejudice to its right to
recover such amount, give 15 days notice to such a person before disconnecting
the supply of electrical energy and should the supply be so disconnected, the
connection shall not be restored until full payment for all obligations pending,
including charges for the work of reconnection, has been made by the consumer. The Board may also send the notice of disconnection alongwith the bill
itself.
(b) If the payment of the bill
is not made in full, necessary surcharge for late payment of the bill as
mentioned in the relevant tariff schedule will be payable by the consumer.
18. In the event of any dispute or difference as to the correctness of any
bill or bills presented under the terms hereof, the consumer shall nevertheless
pay such bill or bills within stipulated period. Any adjustment necessary due to incorrectness in such bill or bills shall
be made by the Board in the ensuing bill(s) after the settlement of the said
dispute or difference.
19 (a) The consumer shall, when
required by the Board, pay Security Against Consumption as per schedule of
General and Service Connection Charges, as amended from time to time, for the
performance of the terms and conditions of this agreement and shall on the
requisition time to time renew or replenish SAC and security in the event of the
same becoming exhausted or insufficient. The
Board, in the event of consumer being found indulging in unauthorized use of
electricity or theft of electricity, may require him to pay additional SAC
failing which the Board may disconnect the supply to the consumer. Also the Board shall be at liberty at any time and from time to time to
appropriate and apply the SAC deposit as aforesaid towards payments or
satisfaction of all or any money which shall become due or owing by the consumer
to the Board in respect of the supply of energy or otherwise under this
agreement but the provision contained in this clause shall not prejudice any
other remedy to which the Board maybe entitled for the recovery of such amount.
(b) If the consumer fails within 15 days or such other period of notice
as may be specified in writing in each case to comply with the terms of any
notice by the Board requiring him to give any SAC or additional SAC or security
or so renew or replenish any security mentioned in sub-clause (a) foregoing,
which may become exhausted or insufficient, the Board may without prejudice to
any other remedy be entitled to refuse or discontinue the supply so long as such
failure continues.
20 (a) The consumer shall agree
to restrict or regulate consumption of electrical energy/supply under this
agreement during peak hours as may be directed by the Chief Engineer SO&C or
any other appropriate authority of the Board in writing and any other hours as
and when required to do so if the power position or any other emergency warrants
such an action.
(b) The consumer shall agree
to the supply of electricity under this agreement being curtailed, staggered or
cutoff altogether by the Board if the power position or any other emergency in
power system warrants such a course of action.
(c) The Board would have the
right to discontinue temporarily power to the consumer at any time at its
discretion, whenever it becomes necessary for the purpose of testing plant,
equipments etc. and for this no compensation will be payable to the consumer.
21. (a) The consumer shall pay to
the Board Service Connection charges, additional SAC/Security as per the
schedule of General and Service Connection Charges in force at the time of
extension of load or contract demand as the case may be.
(b) The minimum charges as
provided in the schedule of tariff shall be increased to take into account the
altered load.
22. The consumer shall not, without the previous consent in writing of the
Board, assign, transfer or part with the benefit of this agreement and shall not
in any manner part with or creates any partial or separate interest in it.
23. If at anytime during the continuance of this agreement the consumer
shall:
(a) Being a company pass a
resolution for winding up or be ordered to be wound up by a court of competent
jurisdiction and being an individual or individuals commit any act of insolvency
or be adjudged insolvent.
(b) Execute or create any
mortgage charge or other encumbrance on any property or asset of the consumer so
as to prejudicially affect the Board's electric meter, plant apparatus and
equipment, at consumer's premises or any part thereof or any right exercisable
by the Board in connection with the said electric meters, plant, apparatus and
equipment, the Board shall be at liberty to terminate this agreement by giving
15 days notice in writing to the consumer and upon such termination the consumer
shall forthwith pay to the Board all the money then due and payable under the
agreement together with a further sum equal to the amount of the minimum and/or
special guarantee for the unexpired minimum period of supply as and by way of
liquidated damages.
24. (a) The consumer shall comply
with Electricity supply Regulations prescribed by the Board and approved by
PSERC, which shall be deemed to be a part of the agreement and shall govern the
parties hereto in so far as same are applicable.
(b) The consumer shall afford
to the Board on demand all reasonable information including certified copies of
monthly return of production of goods being submitted by him to the
Central/State Excise and Sales Tax Authorities to enable the Board to keep a
watch over the consumption of electricity to keep all records required under the
provisions of Act, or the rules of the conditions of supply.
(c) If any of the information
supplied or undertaking given by the consumer is found to be incorrect or false
or shows that he had obtained connection by misrepresentation, he will be deemed
to have indulged in Un-authorized use of Electricity and will be liable to pay
higher tariff as specified by regulations by giving him a notice of 7 (seven)
days.
(d) The consumer shall not
without the prior consent of the Board effect any change in the industry or
operate any additional industry for which the connection had been taken in the
first instance. Default in this
regard may lead to unauthorized use of supply, & higher tariff as specified
in the regulations shall be payable and for non payment of the charges, the
supply shall be liable to be disconnected after giving him a notice of 15
(Fifteen) days.
(e) In the event of consumer
failing to comply with any of the provisions of the Regulations or failing to
observe and fulfill the terms and conditions of this agreement on his part, it
shall be lawful for the Board after giving notice to the consumer to discontinue
the supply of energy, notwithstanding that the Board may have at any time
previously omitted to exercise such power on a similar failure by the consumer. The Board shall however on the terms and conditions of this agreement and
on payment by the consumer of the expenses incurred by the Board in cutting off
and reconnection of the supply, reconnect the supply with reasonable speed.
25. Any levy such as Sales Tax, Electricity Duty, Octroi etc imposed by the
State Government or any other competent authorities on energy purchased by the
consumer from the Board shall be paid by the consumer.
26. This agreement shall be read and construed as subject in all respect to
the provisions of the Electricity Act, 2003 or any statutory modifications
thereof for the time being in force and the rules, regulations made there in or
any subsequent amendment or modifications thereof so far as the same
respectively may be applicable.
27. The consumer has agreed to bear stamp duty on this agreement, if
applicable.
28. The consumer shall declare the connected load of the factory at the time
of giving connection and subsequently at the time when increased demand is met
under this agreement. The consumer
shall not make any addition to the installation, unless approved by the Board.
29. All disputes arising under this agreement or touching or concerning any
covenant or conditions of this agreement shall be dealt in accordance with the
provisions of the EA-2003 and be referred to Forum of Redressal of Grievances of
the consumers.
30. The consumer would provide all corrective measures to keep the voltage
flickering within the permissible limits as maybe advised by the Board, from
time to time. Should the voltage
flicker be more than the limits prescribed by the Board, the installation shall
be disconnected and will not be reconnected, till the voltage flickering is
brought down to the satisfaction of the Board.
IN
WITNESS WHEREOF, I______________________(Name and designation) of the Punjab
State Electricity Board by order and direction of and on behalf of the Punjab
State Electricity Board and the consumer_______________________have hereinto set
their signatures and the common seals the day, month, and year first written
above.
Signed by the above named in
the presence of
___________________(Designation
& Seal)
Punjab State
Electricity Board.
1. Name:_____________________
Address:___________________
2. Name:_____________________
Address:___________________
(Consumer
or his Authorized Representative)
Name:_______________________
Designation:_______________________
Authorized
vide Resolution No_______________
or
Power of Attorney No.________________
(For
and on behalf of)
PSEB CS-I(HT/EHT-S)
PUNJAB STATE ELECTRICITY BOARD
SUPPLEMENTARY AGREEMENT FOR LARGE INDUSTRIAL AND BULK SUPPLY CONSUMERS
(HT/EHT
SUPPLY)
THIS AGREEMENT MADE THIS___day of_______20__ between
the Punjab State Electricity Board(hereinafter called the 'Board' which
expression shall where the context so admits include its successors in office
and assign)having its Head Office at Patiala of the one part
and____________________________________(hereinafter called 'Consumer' which
expression where the context so admits shall include his heirs, executors,
administrators , legal representatives successors in business and assigns) of
the other part.
Whereas the Board has already released electric supply to the premises of
the consumer situated at________________________________________________for
purposes of____________________on the terms and conditions mentioned in the
agreement between the Board and the consumer
dated____________________hereinafter called the Principal Agreement.
AND WHEREAS, the parties have now agreed to modify the Principal
Agreement in the manner hereinafter appearing.
AND
WHERAS this agreement is Supplemental to the Principal Agreement.
1. In paragraph 1(a) of the Principal Agreement dated______________the
maximum demand of ______________KVA, the connected load of_______KW and the
installed capacity of step down transformers of__________KVA shall be amended to
read as_____KVA, ________KW and _________KVA respectively.
2. In paragraph 2 of the Principal Agreement the declared pressure(Voltage)
of_________thousand volts between phases shall be amended to read
as______________-thousand volts between phases.
3. Subject only to the variations herein contained the Principal Agreement
shall remain in full force and effect and shall be read and construed and be
enforceable as if terms of this agreement were inserted by way of addition or substitution as the case may be.
IN
WITNESS WHEREOF, I______________________(Name and designation) of the Punjab
State Electricity Board by order
and direction of and on behalf of the Punjab State Electricity Board and the
consumer_______________________have hereinto set their signatures and the common
seals the day, month, and year first written above.
Signed
by the above named in the presence of
___________________(Designation)
Punjab
State Electricity Board.
1.
Name:_____________________
Address:___________________
2.
Name:_____________________
Address:___________________
(Consumer
or his Authorized Representative)
Name:_______________________
Designation:_______________________
Authorized
vide Resolution No_______________
or
Power of Attorney No.________________
(For and on behalf of)
FORM NO.CS-1(SL/A)
PUNJAB
STATE ELECTRICITY BOARD
AGREEMENT FOR STREET LIGHTING
(Applicable
where Initial installation of complete street light fittings and lamps and their
subsequent replacement is done at the Board's cost)
This
agreement made_________day of___________two thousand and__________between the
Punjab State Electricity Board(hereinafter referred to as "the Board"
of the one part and the Corporation/Municipal committee/Cantonment Board/Panchayat/__________
of (hereinafter together with its
successors and assigns called the consumer) of the other part.
Whereas the Board has agreed for the purpose of lighting certain street
lamps and hereinafter prescribed within the area under the jurisdiction of the
consumer to supply electrical energy (hereinafter called the supply) and to
provide for this purpose additional to the Board's general supply system the
necessary works and the said street lamps and to maintain, repair, renew and
operate the said works and renew the said lamps as hereinafter provided.
And whereas the consumer has agreed as hereinafter provided to pay for
the said supply and charges on the said works and for the renewal of said lamps.
Now
This agreement witnesseth as follows:-
1. Provisions of Fitting:-The
Board shall provide and install works consisting of conductors, insulators,
apparatus and fittings as are and maybe required for the purpose of providing
supply to the lamps mentioned in the list(Schedule-IV) and Board shall also
install such lamps as are set forth in Schedule I to this agreement. The Board shall install the initial fittings and lamps and shall also
provide subsequent replacements.
The total length of
aerial/cable lines required for providing the aforesaid supply is set forth in
Schedule II to this Agreement.
2. Location of Lamps, The
consumer shall not be entitled to demand the provision of street lamps in any
position other than upon the poles already existing unless the Board agrees to
provide extra lamps and install the necessary works.
The street light
consumer would be required to pay the actual cost of such works as per schedule
of Service connection charges.
3. Altering the position of lamps:
If the position of any lamp(s) has been agreed upon between the parties hereto
in writing or if any such lamp(s) has been installed as provided in Clause-1 and
2 above, the consumer shall not be entitled to have any change made in the
position of any such lamp(s) or to have any alteration whatsoever made thereto.
Provided that in
the event of the consumer requiring any alteration in the position or other
particulars of any such lamp(s) , the Board may execute such alteration upon
payment by the consumer of the cost thereof.
4. Type, size and luminosity of Lamps: "All
lamps shall be of the capacity not less than 25 watts and not greater than 250
watts, Lamps of 25 watts capacity may be used along roads and lanes not
accessible to vehicular tariff, but the number of such lamps shall at no time
exceed 30 percent of the total number of lamps installed. Special lamps of wattage higher than 250 may be installed as agreed to
between the parties.
The average
luminosity of batches of not less than 25 lamps in use removed at random and
tested shall at no time be less than 90 percent and 85 percent of the initial
luminosity guaranteed by the manufacturers for the vaccum and gas filled lamps
respectively, at the standard pressure for which the respective lamps are
designed. Further, the average
luminosity per watt shall not be less than that specified in the BIS
5. Lighting Hours and minimum consumption: Upon a date not later than
15 days before the commencement of each quarter beginning respectively on Ist
January, Ist April, Ist July and Ist October in each year, the consumer shall
furnish the Board with a statement showing the hours during which the consumer
requires supply for the purpose of street lighting and ensuing quarter and
provided the said statement is not in conflict with the general system of
control adopted by the Board in respect of street lighting, the Board shall
provide supply to the consumer for the purpose of street lighting for such hours
on each night as may be prescribed
by the consumer in the said statement.
Provided firstly, that in the event of lighting being required at times
other than those as above prescribed, supply may be made by the Board to the
consumer for such additional hours as may be mutually agreed upon between the
Board and the consumer in writing.
Provided secondly, that
the night period of lighting for every lamp shall be of duration not less than
an average of 8 hours over each period of one year dating from Ist April in each
year during the period of agreement.
Provided thirdly, that if the total number of units consumed in the whole
year is less than it would have been if the lamps had been lit on an average of
8 hours per night over the whole year, the Board shall charge for the difference
between the stipulated units and units actually consumed at the tariff rates.
Provided always that for the purpose of this agreement night shall mean
the period between the hours 5 p.m. to any one-day and 7 a.m. of the following
day.
6. Measurement of Energy:
The supply taken from the Board by the consumer shall be measured by the meter
or meters installed by the Board at suitable point or points and the supply
taken by the consumer so measured shall be deemed to be correct and binding on
the consumer.
Provided firstly
that in the event of consumer disputing the accuracy of any such said meter, the
consumer may, upon giving notice in writing to the Board, cause such meter to be
tested by the Board. If the meter
shall be found to be not correct as specified, the Board shall not be entitled
to recover the cost of such test from the consumer and shall adjust the
consumer's account in accordance with the result of the test with retrospective
effect for a period not exceeding three months immediately preceding the date of
such test.
Provided secondly, that if on such test as aforesaid being made by the
Board the meter shall be found to be correct as specified the Board shall be
entitled to recover from the consumer the charges as per schedule of general
charges for testing the meter.
Provided always that should the consumer decline to accept any such test
or such adjustment as aforesaid, the matter shall be referred to the DS Forum
under the Act.
7. Charges for Service and Supply of Energy: The Board shall maintain, repair and operate the
works described in clause 1 and 2 and give supply; to and renew the lamps
referred therein and in respect of the service and supply thus rendered the
consumer shall, notwithstanding anything contained in clause 13 thereof, pay the
Board at the rates prescribed in Tariff S.L. of Schedule III to this Agreement
or such rate as maybe prescribed by the PSERC.
Provided that in
the event of any lamps having been stolen or maliciously damaged by any person
or persons not proved by the consumer to be employees of Punjab State
Electricity Board, the renewal of the same shall be made at the expense of the
consumer.
The consumer shall
also pay meter hire at the rate prescribed by the Board from time to time (or as
amended from time to time) per month for every single-phase meter installed.
8. Payment of Bills:
The Board will present to the consumer monthly bills for energy consumed and for
operation, maintenance, repair and lamp renewals prescribed in clause 7above and
the said bills shall be paid on demand.
If any such bill
were not paid within 15 days of the date of presentation of the bill, a
surcharge of 10% (or as specified by PSERC) shall be levied. After one year the rate of surcharge shall be 1½% per month or part
thereof (or as specified by PSERC) until the amount is paid in full.
Provided that any such bill shall be payable within 15 days from the date
of presentation of the bill notwithstanding any difference or dispute which may
arise as to the accuracy of the bill. In
the event of an error in the bill being admitted, the amount of the error shall
be adjusted by the Board in the next monthly bill rendered to the consumer after
the settlement of the difference or dispute.
Provided further that in the event of any bill remaining unpaid for 30
days after the date of presentation of the bill the Board shall be entitled to
disconnect the supply after serving 15(Fifteen) days clear notice of its
intention to do so and to decline to reconnect the supply until all outstanding
bills due to the Board by the consumer under this agreement have been paid. In the event of the supply being so disconnected the Board shall be
entitled to charge the consumer for every day during which the supply shall have
been so disconnected at the full rates of charge prescribed in clause 7 above
with the exception of the energy charges.
Provided always that no payment shall be accepted by the Board on a
holiday declared by the Board and that in case the date on which the Board
becomes entitled to disconnect the supply is a holiday declared by the Board, it
shall postpone the disconnection of the supply till the following day.
9. Repair and Renewal of Lamps:
The Board shall repair or renew as may be deemed necessary all inoperative or
faulty lamps within 24 hours of the receipt of written notice from the consumer
in this behalf, Provided such notice has been received at the Board's local
office before 2 p.m. of any day and subject to the provision in the event of the
Board failing to repair or renew within 24 hours any inoperative or faulty lamp
of which such notice has been received, the consumer shall not be liable for the
lamp charge for such lamp for the period during which it may remain inoperative
or faulty.
10. Penalty for inefficiency:
Should the consumer consider that the provisions of clause 4 and pressure as
stated in schedule III are not complied with, he shall notify the Board in
writing and Board shall within 48 hours of the receipt of such notice rectify
the defects, failing which the Board will render itself liable to a penalty of
Rs.20/- for each day that the luminosity or pressure does not comply with the
conditions specified in clause 4 and schedule mentioned above and any dispute in
regard to the luminosity or the pressure shall be referred to the DS Forum under
the Act.
11. Applicability of Act, Rules and Regulations: The parties to this
agreement shall be bound by the provision of the Electricity Act, 2003 and any
statutory amendment thereof and of the rules made there under and of the
regulations of the Punjab State Electricity Board in so far as these maybe
relevant.
12. Commencement of Supply: The date of commencement of supply shall
be the date on which the supply is actually commenced or a date three months
after the date of notice presented to the consumer by the Board intimating that
the Board will be in a position to give supply to the consumer on or before the
said date of commencement of supply whichever is earlier.
Provided that if
the consumer does not take supply from the date when the Board is in a position
to give supply in accordance with the notice mentioned above, the consumer shall
pay to the Board charges as prescribed in Schedule of Street Lighting Tariff in
accordance with the terms of the Agreement from the date of expiry of the period
of notice referred to above till the date when he actually takes supply.
13. Duration of Agreement: This
agreement shall be and remain inforce for
five years commencing from the date of commencement of supply and be deemed to
have been renewed from time to time and shall continue in force for further
period of five years each, unless and until either party shall within the first
four years of the first or any such succeeding period of five years, have served
upon the other part 12 Calendar months notice in writing of the intention not to
renew the agreement at the expiry of the current period of five years, in which
case subject to anything contained in these presents to the contrary this
agreement shall terminate at the expiry of the period of five years during which
such notice in writing shall have been duly delivered and received by the other
party.
14. Termination of Agreement: Whenever the consumer wants permanent
disconnection of the said supply of power before the expiry of the current five
years of agreement, the consumer will have and exercise in writing the option to
pay rentals plus minimum consumption charges as maybe payable under the schedule
of tariff hereof, for the remaining period from the date of disconnection of the
street lighting supply till the agreement including arrears if any, outstanding
at the time or to pay rentals including minimum consumption charges under clause
5 hereof, until the date of lighting works erected under this agreement. In case, however, the cost of street lighting supply system or of any
portion thereof was paid by the consumer originally, then cost of erection and
dismantlement will not be payable by the consumer for such system or part
thereof as the case maybe.
15. Interruption and failure or defect in supply: The energy to be
supplied under this agreement shall be available at all hours of the day and
night, but no liability whatsoever shall attach to the Board to compensate the
consumer for any interruption, failure or defect of supply arising from any
cause whatsoever, except to the extent provided in this agreement.
16. Resolution of Disputes: In the event of any difference or dispute
arising between the Board and the consumer in respect of any matter connected
with the supply which can not be determined by these conditions or by the terms
of any agreement between the Board and the consumer and in the event of any
difference or dispute arising as to the interpretation of these conditions or of
these conditions or of the terms of the agreement between the Board and the
consumer, the matter shall be determined in accordance with the provisions of
the Act and be referred to DS Forum.
IN
WITNESS WHEREOF THE parties hereto have set their hands the day and year first
written.
Signed by_________________Mayor/ President/Executive Officer/Sarpanch for
and on behalf of the Corporation/Municipal Committee/ Cantonment Board/Panchayat____________of________being
duly authorized to sign vide certified copy of Resolution No.________ dated __________annexed hereto.
In the presence of
Name:_____________________
Description:________________
Address:__________________
Signed by___________________
Member for and on behalf of the Corporation/Municipal Committee/
Cantonment Board /Panchayat ____________of__________being duly authorized to
sign vide certified copy of Resolution No.________ dated __________ annexed hereto
In the presence of
Name:_____________________
Description:________________
Address:__________________
Countersigned by___________
Secretary for and on behalf of the Corporation/Municipal Committee/
Cantonment Board /Panchayat __________________
___________________________
Signed by the Superintending Engineer Punjab State Electricity Board for
and on behalf of PSEB.
In the presence of
Name:_____________________
Description:________________
Address:__________________
SCHEDULES
Schedule-I
NUMBER
AND CAPACITYOF LAMPS
|
Item No.
|
Minimum No.
|
Maximum No
|
Wattage
|
Total Capacity in KW Minimum Maximum
|
|
Ordinary Lamps
1.Lamps up to 150 Watts
2. Lamps above 150 watts
3. Special Lamps
4.
5.
Mercury Vapour Lamps
1. Lamps of 80 watts.
2. Lamps of 125 Watts
3. Lamps of 250 Watts
4. Lamps of 400 Watts
5
6
Fluorescent Tubes:
1. Single 2 Ft. 20 Watts
2. Single 4 Ft. 40 Watts
3. Double 2 Ft. 20 Watts
4. Double 4 Ft. 40 Watts
5.
6.
Other Fittings(if any)
1.
2.
3.
|
|
|
|
|
Schedule-II
LENGTH
OF AERIAL AND CABLE LINES
1. Minimum
Length_____________________________Kilo Metres.
2. Maximum
Length_____________________________Kilo Metres
Schedule-III
PSEB
SCHEDULE OF STREET LIGHTING TARIFF AS AMENDED FROM TIME TO TIME
Note: Tariff
as amended from time to time shall be applicable.
Schedule
?IV
DETAILS
OF LAMPS AND LINES
|
Sr.No
|
Pole No
|
Type
of Fitting
|
Street
or Locality
|
Wattage
|
Type
of Line (ACSR,Cable)
|
|
|
|
|
|
|
|
ABSTRACT(Nos.)
|
Type of Fittings
|
Pole Mounted
|
Wall Mounted
|
Hanging
|
Total
|
|
Ordinary Lamps
1.Lamps up to 150 Watts
2. Lamps above 150 watts
3. Special Lamps
4.
5.
Mercury Vapour Lamps
1. Lamps of 80 watts.
2. Lamps of 125 Watts
3. Lamps of 250 Watts
4. Lamps of 400 Watts
5
6
Flourescent Tubes:
1. Single 2 Ft. 20 Watts
2. Single 4 Ft. 40 Watts
3. Double 2 Ft. 20 Watts
4. Double 4 Ft. 40 Watts
5.
6.
Other Fittings(if any)
1.
2.
3.
|
|
|
|
|
Total Length of Street Light Line
1. Overhead___________________________Kilo Metres
2. Cable______________________________Kilo Metres.
FORM NO.CS-1(SL/B)
PUNJAB
STATE ELECTRICITY BOARD
AGREEMENT FOR STREET LIGHTING
(Applicable
where Initial installation of complete street light fittings and their
subsequent replacement is carried out at the cost of the Board and initial
installation and subsequent replacement of lamps is done at consumer's cost)
This
agreement made_________day of___________two thousand and__________between the
Punjab State Electricity Board (hereinafter referred to as "the Board"
of the one part and the Corporation/Municipal committee/Cantonment Board/Panchayat/__________
of (hereinafter together with its successors and assigns called the consumer) of
the other part.
Whereas the Board has agreed for the purpose of lighting certain street
lamps and hereinafter prescribed within the area under the jurisdiction of the
consumer to supply electrical energy (hereinafter called the supply) and to
provide for this purpose additional to the Board's general supply system the
necessary works and the said street lamps and to maintain, repair, renew and
operate the said works and renew the said lamps as hereinafter provided.
And whereas the consumer has agreed as hereinafter provided to pay for
the said supply and charges on the said works and for the renewal of said lamps.
Now
this agreement witnessed as follows: -
1. Provisions of Fitting: -The
Board shall provide and install works consisting of conductors, insulators,
apparatus and fittings as are and maybe required for the purpose of providing
supply to the lamps mentioned in the list (Schedule-IV) and Board shall also
install such lamps as are set forth in Schedule I to this agreement provided
such lamps are procured and supplied by the consumer to the Board at his own
cost.
The total length of
aerial/cable lines required for providing the aforesaid supply is set forth in
Schedule II to this Agreement.
2. Location of Lamps: - The
consumer shall not be entitled to demand the provision of street lamps in any
position other than upon the poles already existing unless the Board agrees to
provide extra lamps and install the necessary works.
The street light
consumer would be required to pay the actual cost of such works as per schedule
of Service connection charges.
3. Altering the position of lamps:
If the position of any lamp(s) has been agreed upon between the parties hereto
in writing or if any such lamp(s) has been installed as provided in Clause-1 and
2 above, the consumer shall not be entitled to have any change made in the
position of any such lamp(s) or to have any alteration whatsoever made thereto.
Provided that in
the event of the consumer requiring any alteration in the position or other
particulars of any such lamp(s), the Board may execute such alteration upon
payment by the consumer of the cost thereof.
4. Type, size and luminosity of Lamps: "All
lamps shall be of the capacity not less than 25 watts and not greater than 250
watts, Lamps of 25 watts capacity may be used along roads and lanes not
accessible to vehicular tariff, but the number of such lamps shall at no time
exceed 30 percent of the total number of lamps installed. Special lamps of wattage higher than 250 may be installed as agreed to
between the parties.
The average
luminosity of batches of not less than 25 lamps in use removed at random and
tested shall at no time be less than 90 percent and 85 percent of the initial
luminosity guaranteed by the manufacturers for the vacuum and gas filled lamps
respectively, at the standard pressure for which the respective lamps are
designed. Further, the average
luminosity per watt shall not be less than that specified in the BIS
5. Lighting Hours and minimum consumption: Upon a date not later than
15(Fifteen) days before the commencement of each quarter beginning respectively
on 1st January, 1st April, 1st July and 1st
October in each year, the consumer shall furnish the Board with a statement
showing the hours during which the consumer requires supply for the purpose of
street lighting and ensuing quarter and provided the said statement is not in
conflict with the general system of control adopted by the Board in respect of
street lighting, the Board shall provide supply to the consumer for the purpose
of street lighting for such hours on each right
as may be prescribed by the consumer in the said statement.
Provided firstly, that in the event of lighting being required at times
other than those as above prescribed, supply may be made by the Board to the
consumer for such additional hours as may be mutually agreed upon between the
Board and the consumer in writing.
Provided secondly, that the night period of lighting for every lamp shall
be of duration not less than an average of 8 hours over each period of one year
dating from Ist April in each year during the period of agreement.
Provided thirdly, that if the total number of units consumed in the whole
year is less than it would have been if the lamps had been lit on an average of
8 hours per night over the whole year, the Board shall charge for the difference
between the stipulated units and units actually consumed at the tariff rates.
Provided always that for the purpose of this agreement night shall mean
the period between the hours 5 p.m. to any one-day and 7 a.m. of the following
day.
6. Measurement of Energy:
The supply taken from the Board by the consumer shall be measured by the meter
or meters installed by the Board at suitable point or points and the supply
taken by the consumer so measured shall be deemed to be correct and binding on
the consumer.
Provided firstly
that in the event of consumer disputing the accuracy of any such said meter, the
consumer may, upon giving notice in writing to the Board, cause such meter to be
tested by the Board. If the meter
shall be found to be not correct as specified, the Board shall not be entitled
to recover the cost of such test from the consumer and shall adjust the
consumer's account in accordance with the result of the test with retrospective
effect for a period not exceeding three months immediately preceding the date of
such test.
Provided secondly, that if on such test as aforesaid being made by the
Board the meter shall be found to be correct as specified, the Board shall be
entitled to recover from the consumer the charges as per schedule of general
charges for testing the meter.
Provided always that should the consumer decline to accept any such test
or such adjustment as aforesaid, the matter shall be referred to the DS Forum
under the Act.
7. Charges for Service and Supply of Energy: The Board shall maintain, repair and operate the
works described in clause 1 and 2 and give supply; to and renew the lamps
referred to therein provided such lamps are procured and provided by the
consumer to the Board at its own cost and in respect of the service and supply
thus rendered the consumer shall, notwithstanding anything contained in clause
13 thereof, pay the Board at the rates prescribed in Tariff S.L. of Schedule III
to this Agreement or such rate as maybe prescribed by the PSERC.
Provided that in
the event of any lamps having been stolen or maliciously damaged by any person
or persons not proved by the consumer to be employees of Punjab State
Electricity Board, the renewal of the same shall be made at the expense of the
consumer.
The consumer shall
also pay meter hire at the rate prescribed by the Board from time to time (or as
amended from time to time) per month for every single-phase meter installed.
8. Payment of Bills:
The Board will present to the consumer monthly bills for energy consumed and for
operation, maintenance, repair and lamp renewals prescribed in clause 7above and
the said bills shall be paid on demand.
If any such bill
were not paid within 15 days of the date of presentation of the bill, a
surcharge of 10% or as specified by PSERC shall be levied. After one year the rate of surcharge shall be 1½% per month or part
thereof or as specified by PSERC until the amount is paid in full.
Provided that any such bill shall be payable within 15(Fifteen) days from
the date of presentation of the bill notwithstanding any difference or dispute
which may arise as to the accuracy of the bill. In the event of an error in the bill being admitted, the amount of the
error shall be adjusted by the Board in the next monthly bill rendered to the
consumer after the settlement of the difference or dispute.
Provided further that in the event of any bill remaining unpaid for
30(Thirty) days after the date of presentation of the bill the Board shall be
entitled to disconnect the supply after serving 15(Fifteen) days clear notice in
writing of its intention to do so and to decline to reconnect the supply until
all outstanding bills due to the Board by the consumer under this agreement have
been paid. In the event of the supply being so disconnected the Board
shall be entitled to charge the consumer for every day during which the supply
shall have been so disconnected at the full rates of charge prescribed in clause
7 above with the exception of the energy charges.
Provided always that no payment shall be accepted by the Board on a
holiday declared by the Board and that in case the date on which the Board
becomes entitled to disconnect the supply is a holiday declared by the Board, it
shall postpone the disconnection of the supply till the following day.
9. Repair and Renewal of Lamps:
The Board shall repair or renew as may be deemed necessary all inoperative or
faulty lamps within 24 hours of the receipt of written notice from the consumer
in this behalf, Provided such notice has been received at the Board's local
office before 2 p.m. of any day alongwith requisite number of new bulbs required
to be replaced and subject to the provision in the event of the Board failing to
repair or renew within 24 hours any inoperative or faulty lamp of which such
notice has been received, the consumer shall not be liable for the lamp charge
for such lamp for the period during which it may remain inoperative or faulty.
10. Penalty for inefficiency:
Should the consumer consider that the provisions of clause 4 and pressure as
stated in schedule III are not complied with, he shall notify the Board in
writing and Board shall within 48 hours of the receipt of such notice rectify
the defects, failing which the Board will render itself liable to a penalty of
Rs.20/- for each day that the luminosity or pressure does not comply with the
conditions specified in clause 4 and schedule mentioned above and any dispute in
regard to the luminosity or the pressure shall be referred to the DS Forum under
the Act.
11. Applicability of Act, Rules and Regulations: The parties to this
agreement shall be bound by the provision of the Electricity Act, 2003 and any
statutory amendment thereof and of the rules made there under and of the
regulations of the Punjab State Electricity Board in so far as these maybe
relevant.
12. Commencement of Supply: The date of commencement of supply shall
be the date on which the supply is actually commenced or a date three months
after the date of notice presented to the consumer by the Board intimating that
the Board will be in a position to give supply to the consumer on or before the
said date of commencement of supply whichever is earlier.
Provided that if
the consumer does not take supply from the date when the Board is in a position
to give supply in accordance with the notice mentioned above, the consumer shall
pay to the Board charges as prescribed in Schedule of Street Lighting Tariff in
accordance with the terms of the Agreement from the date of expiry of the period
of notice referred to above till the date when he actually takes supply.
13. Duration of Agreement: This
agreement shall be and remain in force for five years commencing from the date
of commencement of supply and be deemed to have been renewed from time to time
and shall continue in force for further period of five years each, unless and
until either party shall within the first four years of the first or any such
succeeding period of five years, have served upon the other part 12 Calendar
months notice in writing of the intention not to renew the agreement at the
expiry of the current period of five years, in which case subject to anything
contained in these presents to the contrary this agreement shall terminate at
the expiry of the period of five years during which such notice in writing shall
have been duly delivered and received by the other party.
14. Termination of Agreement: Whenever the consumer wants permanent
disconnection of the said supply of power before the expiry of the current five
years of agreement, the consumer will have and exercise in writing the option to
pay rentals plus minimum consumption charges as maybe payable under the schedule
of tariff hereof, for the remaining period from the date of disconnection of the
street lighting supply till the agreement including arrears if any, outstanding
at the time or to pay rentals including minimum consumption charges under clause
5 hereof, until the date of lighting works erected under this agreement. In case, however, the cost of street lighting supply system or of any
portion thereof was paid by the consumer originally, then cost of erection and
dismantlement will not be payable by the consumer for such system or part
thereof as the case maybe.
15. Interruption and failure or defect in supply: The energy to be
supplied under this agreement shall be available at all hours of the day and
night, but no liability whatsoever shall attach to the Board to compensate the
consumer for any interruption, failure or defect of supply arising from any
cause whatsoever, except to the extent provided in this agreement.
16. Resolution of Disputes: In the event of any difference or dispute
arising between the Board and the consumer in respect of any matter connected
with the supply which can not be determined by these conditions or by the terms
of any agreement between the Board and the consumer and in the event of any
difference or dispute arising as to the interpretation of these conditions or of
these conditions or of the terms of the agreement between the Board and the
consumer, the matter shall be determined in accordance with the provisions of
the Act and be referred to DS Forum.
IN
WITNESS WHEREOF THE parties hereto have set their hands the day and year first
written.
Signed by_________________Mayor/ President/Executive
Officer/Sarpanch for and on behalf of the Corporation/Municipal Committee/
Cantonment Board/ Panchayat ____________of________being duly authorized to sign
vide certified copy of Resolution No.________ dated __________annexed hereto.
In the presence of
Name:_____________________
Description:________________
Address:__________________
Signed by___________________
Member for and on behalf of the
Corporation/Municipal Committee/ Cantonment Board /Panchayat ____________of__________being
duly authorized to sign vide certified copy of Resolution No.________ dated __________ annexed hereto
In the presence of
Name:_____________________
Description:________________
Address:__________________
Countersigned by___________
Secretary for and on behalf of the
Corporation/Municipal Committee/ Cantonment Board /Panchayat __________________
Signed by the Superintending Engineer Punjab State
Electricity Board for and on behalf of PSEB.
In the presence of
Name:_____________________
Description:________________
Address:__________________
SCHEDULES
Schedule-I,II,II
and IV as per the provisions of PSEB
CS-1(SL/A)
FORM NO.CS-1(SL/C)
PUNJAB
STATE ELECTRICITY BOARD
AGREEMENT FOR STREET LIGHTING
(Applicable where Initial
installation of complete street light fittings and lamps as well as their
subsequent replacement is to be done at the cost of the consumer i.e fittings and lamps to be supplied by the
consumer)
This
agreement made_________day of___________two thousand and__________between the
Punjab State Electricity Board(hereinafter referred to as "the Board"
of the one part and the Corporation/ Municipal committee/ Cantonment Board/
Panchayat/__________of (hereinafter together
with its successors and assigns called the consumer) of the other part.
Whereas the Board has agreed for the purpose of lighting certain street
lamps and hereinafter prescribed within the area under the jurisdiction of the
consumer to supply electrical energy(hereinafter called the supply) and to
provide for this purpose additional to the Board's general supply system the
necessary works and the said street lamps and to maintain, repair, renew and
operate the said works and renew the said lamps as hereinafter provided.
And whereas the consumer has agreed as hereinafter provided to pay for
the said supply and charges on the said works and for the renewal of said lamps.
Now
This agreement witnesseth as follows:-
1. Provisions of Fitting:-The
Board shall provide and install works consisting of conductors, insulators,
apparatus and fittings as are and maybe required for the purpose of providing
supply to the lamps mentioned in the list(Schedule-IV) and Board shall also
install such lamps as are set forth in Schedule I to this agreement. The Board shall install the initial fittings and lamps and shall also
provide subsequent replacements.
The total length of
aerial/cable lines required for providing the aforesaid supply is set forth in
Schedule II to this Agreement.
2. Location of Lamps, The
consumer shall not be entitled to demand the provision of street lamps in any
position other than upon the poles already existing unless the Board agrees to
provide extra lamps and install the necessary works.
The street light
consumer would be required to pay the actual cost of such works as per schedule
of Service connection charges.
3. Altering the position of lamps:
If the position of any lamp(s) has been agreed upon between the parties hereto
in writing or if any such lamp(s) has been installed as provided in Clause-1 and
2 above, the consumer shall not be entitled to have any change made in the
position of any such lamp(s) or to have any alteration whatsoever made thereto.
Provided that in
the event of the consumer requiring any alteration in the position or other
particulars of any such lamp(s) , the Board may execute such alteration upon
payment by the consumer of the cost thereof.
4. Type, size and luminosity of Lamps: "All
lamps shall be of the capacity not less than 25 watts and not greater than 250
watts, Lamps of 25 watts capacity may be used along roads and lanes not
accessible to vehicular tariff, but the number of such lamps shall at no time
exceed 30 percent of the total number of lamps installed. Special lamps of wattage higher than 250 may be installed as agreed to
between the parties.
The average
luminosity of batches of not less than 25 lamps in use removed at random and
tested shall at no time be less than 90 percent and 85 percent of the initial
luminosity guaranteed by the manufacturers for the vaccum and gas filled lamps
respectively, at the standard pressure for which the respective lamps are
designed. Further, the average
luminosity per watt shall not be less than that specified in the BIS.
5. Lighting Hours and minimum consumption: Upon a date not later than
15(Fifteen) days before the commencement of each quarter beginning respectively
on Ist January, Ist April, Ist July and Ist October in each year, the consumer
shall furnish the Board with a statement showing the hours during which the
consumer requires supply for the purpose of street lighting and ensuing quarter
and provided the said statement is not in conflict with the general system of
control adopted by the Board in respect of street lighting, the Board shall
provide supply to the consumer for the purpose of street lighting for such hours
on each right as may be prescribed
by the consumer in the said statement.
Provided firstly, that in the event of lighting being required at times
other than those as above prescribed , supply may be made by the Board to the
consumer for such additional hours as may be mutually agreed upon between the
Board and the consumer in writing.
Provided secondly, that
the night period of lighting for every lamp shall be of duration not less than
an average of 8 hours over each period of one year dating from Ist April in each
year during the period of agreement.
Provided thirdly, that if the total number of units consumed in the whole
year is less than it would have been if the lamps had been lit on an average of
8 hours per night over the whole year, the Board shall charge for the difference
between the stipulated units and units actually consumed at the tariff rates.
Provided always that for the purpose of this agreement night shall mean
the period between the hours 5 p.m. to any one day and 7 a.m. of the following
day.
6. Measurement of Energy:
The supply taken from the Board by the consumer shall be measured by the meter
or meters installed by the Board at suitable point or points and the supply
taken by the consumer so measured shall be deemed to be correct and binding on
the consumer.
Provided firstly
that in the event of consumer disputing the accuracy of any such said meter, the
consumer may, upon giving notice in writing to the Board, cause such meter to be
tested by the Board. If the meter
shall be found to be not correct as specified, the Board shall not be entitled
to recover the cost of such test from the consumer and shall adjust the
consumer's account in accordance with the result of the test with retrospective
effect for a period not exceeding three months immediately preceding the date of
such test.
Provided secondly, that if on such test as aforesaid being made by the
Board the meter shall be found to be correct as specified, the Board shall be
entitled to recover from the consumer the charges as per schedule of general
charges for testing the meter.
Provided always that should the consumer decline to accept any such test
or such adjustment as aforesaid, the matter shall be referred to the DS Forum.
7. Charges for Service and Supply of Energy: The Board shall maintain, repair and operate the
works described in clause 1 and 2 and give supply; to and renew the lamps
referred to therein provided such lamps are procured and provided by the
consumer to the board at his own cost and in respect of the service and supply
thus rendered the consumer shall, notwithstanding anything contained in clause
13 thereof, pay the Board at the rates prescribed in Tariff S.L. of Schedule III
to this Agreement or such rate as maybe in force from time to time in this
behalf.
Provided that in
the event of any lamps having been stolen or maliciously damaged by any person
or persons not proved by the consumer to be employees of Punjab State
Electricity Board, the renewal of the same shall be made at the expense of the
consumer.
The consumer shall
also pay meter hire at the rate prescribed by the Board from time to time (or as
amended from time to time) per month for every single-phase meter installed.
8. Payment of Bills:
The Board will present to the consumer monthly bills for energy consumed and for
operation, maintenance, repair and lamp renewals prescribed in clause 7above and
the said bills shall be paid on demand.
If any such bill
were not paid within 15 days of the date of presentation of the bill, a
surcharge of 10% or as specified by PSERC shall be levied. After one year the rate of surcharge shall be 1½% per month or part
thereof or as specified by PSERC until the amount is paid in full.
Provided that any such bill shall be payable within 15(Fifteen) days from
the date of presentation of the bill notwithstanding any difference or dispute
which may arise as to the accuracy of the bill. In the event of an error in the bill being admitted, the amount of the
error shall be adjusted by the Board in the next monthly bill rendered to the
consumer after the settlement of the difference or dispute.
Provided further that in the event of any bill remaining unpaid for
30(Thirty) days after the date of presentation of the bill the Board shall be
entitled to disconnect the supply after serving 15(Fifteen) days clear notice in
writing of its intention to do so and to decline to reconnect the supply until
all outstanding bills due to the Board by the consumer under this agreement have
been paid. In the event of the supply being so disconnected the Board
shall be entitled to charge the consumer for every day during which the supply
shall have been so disconnected at the full rates of charge prescribed in clause
7 above with the exception of the energy charges.
Provided always that no payment shall be accepted by the Board on a
holiday declared by the Board and that in case the date on which the Board
becomes entitled to disconnect the supply is a holiday declared by the Board, it
shall postpone the disconnection of the supply till the following day.
9. Repair and Renewal of Lamps:
The Board shall repair or renew as may be deemed necessary all inoperative or
faulty lamps within 24 hours of the receipt of written notice from the consumer
in this behalf, Provided such notice has been received at the Board's local
office before 2 p.m. of any day alongwith requisite number of new bulbs required
to be replaced.
10. Penalty for inefficiency:
Should the consumer consider that the provisions of clause 4 and pressure as
stated in schedule III are not complied with, he shall notify the Board in
writing and Board shall within 48 hours of the receipt of such notice rectify
the defects, failing which the Board will render itself liable to a penalty of
Rs.20/- for each day that the luminosity or pressure does not comply with the
conditions specified in clause 4 and schedule mentioned above and any dispute in
regard to the luminosity or the pressure shall be referred to the DS Forum under
the Act.
11. Applicability of Act, Rules and Regulations: The parties to this
agreement shall be bound by the provision of the Electricity Act, 2003 and any
statutory amendment thereof and of the rules made there under and of the
regulations of the Punjab State Electricity Board in so far as these maybe
relevant.
12. Commencement of Supply: The date of commencement of supply shall
be the date on which the supply is actually commenced or a date three months
after the date of notice presented to the consumer by the Board intimating that
the Board will be in a position to give supply to the consumer on or before the
said date of commencement of supply whichever is earlier.
Provided that if
the consumer does not take supply from the date when the Board is in a position
to give supply in accordance with the notice mentioned above, the consumer shall
pay to the Board charges as prescribed in Schedule of Street Lighting Tariff in
accordance with the terms of the Agreement from the date of expiry of the period
of notice referred to above till the date when he actually takes supply.
13. Duration of Agreement: This
agreement shall be and remain in force for five years commencing from the date
of commencement of supply and be deemed to have been renewed from time to time
and shall continue in force for further period of five years each, unless and
until either party shall within the first four years of the first or any such
succeeding period of five years, have served upon the other part 12 Calendar
months notice in writing of the intention not to renew the agreement at the
expiry of the current period of five years, in which case subject to anything
contained in these presents to the contrary this agreement shall terminate at
the expiry of the period of five years during which such notice in writing shall
have been duly delivered and received by the other party.
14. Termination of Agreement: Whenever the consumer wants permanent
disconnection of the said supply of power before the expiry of the current five
years of agreement, the consumer will have and exercise in writing the option to
pay rentals plus minimum consumption charges as maybe payable under the schedule
of tariff hereof, for the remaining period from the date of disconnection of the
street lighting supply till the agreement including arrears if any, outstanding
at the time or to pay rentals including minimum consumption charges under clause
5 hereof, until the date of lighting works erected under this agreement. In case, however, the cost of street lighting supply system or of any
portion thereof was paid by the consumer originally, then cost of erection and
dismantlement will not be payable by the consumer for such system or part
thereof as the case maybe.
15. Interruption and failure or defect in supply: The energy to be
supplied under this agreement shall be available at all hours of the day and
night, but no liability whatsoever shall attach to the Board to compensate the
consumer for any interruption, failure or defect of supply arising from any
cause whatsoever, except to the extent provided in this agreement.
16. Resolution of Disputes: In the event of any difference or dispute
arising between the Board and the consumer in respect of any matter connected
with the supply which can not be determined by these conditions or by the terms
of any agreement between the Board and the consumer and in the event of any
difference or dispute arising as to the interpretation of these conditions or of
these conditions or of the terms of the agreement between the Board and the
consumer, the matter shall be determined in accordance with the provisions of
the Act and be referred to DS Forum.
IN
WITNESS WHEREOF THE parties hereto have set their hands the day and year first
written.
Signed
by_________________Mayor/ President/Executive Officer/Sarpanch for and on behalf
of the Corporation/Municipal Committee/ Cantonment Board/Panchayat____________of________being
duly authorized to sign vide certified copy of Resolution No.________ dated __________annexed hereto.
In
the presence of
Name:_____________________
Description:________________
Address:__________________
Signed
by___________________
Member
for and on behalf of the Corporation/Municipal Committee/ Cantonment Board /Panchayat
____________of__________being duly authorized to sign vide certified copy of
Resolution No.________ dated __________
annexed hereto
In
the presence of
Name:_____________________
Description:________________
Address:__________________
Countersigned
by___________
Secretary
for and on behalf of the Corporation/Municipal Committee/ Cantonment Board /Panchayat
__________________
___________________________
Signed
by the Superintending Engineer Punjab State Electricity Board for and on behalf
of PSEB.
In
the presence of
Name:_____________________
Description:________________
Address:__________________
SCHEDULES
Schedule-I,II,II
and IV as per the provisions of PSEB
CS-1(SL/A)
CS-I(SL/S) PUNJAB STATE ELECTRICITY BOARD
SUPPLEMENTARY AGREEMENT FOR STREET LIGHTING
THIS AGREEMENT MADE THIS___day of_______20__ between
the Punjab State Electricity Board(hereinafter called the 'Board' ) of the one
part and the Corporation/ Municipal/ Cantonment
Board/ Panchayat/_________of____________(hereinafter together with its successor and assignees called the "Consumer") of the other part.
Whereas the Board has already released electric supply to the consumer
for street lighting in the area under jurisdiction of the consumer on the terms
and conditions mentioned in the agreement dated____________________hereinafter
called the Principal Agreement.
AND WHEREAS, the parties have now agreed to modify the Principal
Agreement in the manner hereinafter appearing.
AND
WHERAS this agreement is Supplemental to the Principal Agreement.
Now
this agreement witnesses and the parties hereto agree as follows:
1. In paragraph 1(a) of the Principal Agreement dated______________for
schedule-IV/drawing No.___________subsitute Schedule IV appended herewith.
2. Schedules, I,II and III appended to the Principal Agreement
dated__________shall be substituted with revised schedules, I ,II and III
appended herewith.
3. The Minimum/maximum number of lamps provided in schedule I and minimum
and maximum length of lines provided in schedule-II of the Principal Agreement
shall stand increased to those provided in revised schedules I and II appended
to this agreement.
3. Subject only to the variations herein contained the Principal Agreement
shall remain in full force and effect and shall be read and construed and be
enforceable as if terms of this agreement were inserted by way of addition or
substitution as the case may be.
IN WITNESS WHEREOF the parties hereto have set their
hands the day and year first written.
Signed
by______Mayor/ President/Executive Officer/ Sarpanch for and on behalf of the
Corporation/Municipal Committee/ Cantonment Board/ Panchayat______of_____being
duly authorized to sign vide certified copy of Resolution No.________ dated __________annexed hereto.
In
the presence of
Name:_____________________
Description:________________
Address:__________________
Signed
by___________________
Member
for and on behalf of the Corporation/Municipal Committee/ Cantonment Board /Panchayat
_______of_______being duly authorized to sign vide certified copy of Resolution
No.___dated __ annexed hereto
In
the presence of
Name:_____________________
Description:________________
Address:__________________
Countersigned
by___________
Secretary
for and on behalf of the Corporation/Municipal Committee/ Cantonment Board /Panchayat
__________
Signed
by the Superintending Engineer Punjab State Electricity Board for and on behalf
of PSEB.
In
the presence of
Name:_____________________
Description:________________
Address:__________________
REVISED
SCHEDULES
Note:- Schedules I,II,III and IV of the Principal
agreement will be revised to take into account the new requirements and appended
with the supplementary agreement.
PSEB CS-12(a)
PUNJAB STATE ELECTRICITY BOARD
THE NORMAL PUNISHMENT FOR RELEASE OF CONENCTION OR COMMISSIONING OF A
WORK WITHOUT RECORDING/CHECKING THE MEASUREMENT OR SIGNING THE BOGUS CERTIFICATE
SHALL BE DISMISSAL.
P.S.E.B. Form No.SOP 4(a)
____________________________________________________________________
Office:______________________
INSTALLATION
ORDER
Date:__________________
Consumer's
Name:____________________________________________
Address:____________________________________________________
___________________________________________________________
Estimate No. Application No. Account No.
______________________________JE
Please install service
connection as per the above Estimate No. Record
measurements in the IWR/EMB and put it up for checking of measurement.
Signature Sig. of AAE/AE/AEE/XEN
JE NAME/DESIGNATION
Name Dated:__________________
Sub Division_____________________
To
Sh.________________
REPORT
The
required service has been completed as per the above estimate and complete
measurements recorded at Page No._________of IWR/EMB which is put up for check
of AAE/AE/AEE. The Material for
this work was drawn vide SRs/SRWs etc given overleaf.
Signature of JE____________________
Name:_____________________________
Dated:________________________
i) Certified that the measurements have been checked.
ii) Certified that the work has been executed as per the sanctioned estimate
stated above.
iii) Certified that there are deviations as detailed overleaf in the work
executed as compared to the sanctioned estimate. The deviations are justified and the case is being processed separately
for sanction as per the current instructions of the Board.
JE's Signature Signature________________________________
Name Name of the Officer/Official
checking the measurements_________________
Designation:_____________________________
Dated:__________________________________
(Received and
checked as above)
Signature of R.A./ARA SCO No. Date Issued
Name
Date
CC:
SDC for finalizing the works
Account
Details
of document vide which material for the estimate mentioned overleaf was
drawn/returned.
Descriptions
of document vide which material was drawn, dismantled ,returned and purchased
locally.
Sr. SR No. SRW No. Dismantlement Local Date
No. Register page No. purchase ___________________________________________________________________________1.
2.
3.
___________________________________________________________________________Certified
that all the SRs/SRWs and references of Dismantlement Register/Local purchase/SMB
etc. have been entered above vide which material was drawn against this work.
Signature
of JE__________________
Name of JE_____________________________
Dated:__________________
Checked and compared with
IWR/EMB
No.____________page___________
and found correct.
Signature of SDC______________________
Name of SDC_________________________
Dated:_______________________________
RA/ARA
Signature of __________________________
Name of _____________________________
RA/ARA_____________________________
Dated:______________________________
PSEB CS-12(b)
PUNJAB STATE ELECTRICITY BOARD
P.S.E.B. Form No.SOP 4(b)
____________________________________________________________________
Book No._______________ Office:______________________
SERVICE
CONNECTION ORDER
Sr.No. Date:__________________
Consumer's
Name:______________________
Address:___________________________________ Application No.___________________
Estimate
No,._______________________________
Feeder
Ref__________________________________ Account No._________________
Junior Engineer
With reference to installation Order
No._______________________________________Book No._________________dated_________________
you are directed to install the necessary meter(s) and turn on the supply and
report as below:-
Certified
that SCO has been prepared after receipt of above I.O. complete in all respects
including the checking of measurement by AAE/AE/AEE/XEN
Signature of RA/ARA Signature of AAE/AE/AEE/XEN
Name
Date
Sub-Division
To
Mr._________________ Code No.
(Name and Designation of JE)
REPORT
The required service complete
with meter(s) has been installed tested and found OK.
Connected
to__________________Sub Station Size of Service_______________
________________Feeder Length of service_____________
________________Phase (Metres)
Installation
Test
i)
between phases
ii)between
phase and earth
|
Meter No
|
Make
|
SR No.
ME No.
|
Amps
|
Volts
|
Phase
|
Initial Meter Reading
|
Connected Load
|
Feeder Ref
|
Remarks
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
Connection made by
supply connected on(date)______________________
(Time)_________________________
Signature of JE_____________________
Name_____________________________
Date______________________________
PSEB CS-13(a)
PUNJAB
STATE ELECTRICITY BOARD
Book
No.______________
Office_______________________________________Serial
No______________
METER
TEST ORDER
(Only
for energy meter)
Dated:_________________
Consumer's
Name____________________________________________________________
Address:___________________________________________________________________
Tariff___________________________________Account
No.__________________________
To
Junior Engineer/AAE/AE/AEE/XEN
Please test meter of above consumer and report below
_______________________________AE/AEE/XEN(Ops)____________________________
REPORT
Meter
No.(Serial)________________Meter______________________________No.(Maker's)
______________________________
Phase_________________________Amps______________________Volts______________
(A) If tested on
consumer's premises
Meter Reading
(2)_________________________Date_______________________________
(1)_________________________Diff.________________________________
Test
Revolutions___________________________Time______________________________
Correct
Revolutions_________________________Diff.______________________________
Result_________________________________Consumer's
signature___________________
_________________________JE/AAE/AE/AEE/XEN__________________Date__________
Charge
or Allowance
If accuracy of meter has
been challenged by consumer, as per his letter No.____ date______
a) if meter is correct within meaning of the Act, the above consumer is to
be debited with Rs._________________
or'
b) If meter is slow/fast within meaning of the Act, above consumer is to be
i) debited/credited with Rs.__________________being the cost
of_________percent of_____________units recorded as having been consumed during
the "defective period" viz from________________to_______________units
@___________per unit.
ii) Credit with Rs.___________being the refund of the meter hire for the
defective period.
Note: The "Defective period" means six months previous to the date of
the test of the period during which the meter has been in use in a defective
condition, whichever is the lesser period.
_______________________________AE/AEE/XEN(Ops)___________Date_____________
Above
Charge/Allowance entered in Sundry Charges and Allowances Register
__________________Accounts
Clerk___________________Date______________________
PSEB CS-13(b)
PUNJAB
STATE ELECTRICITY BOARD
PROFORMA
FOR INSPECTION REGISTER.
Checking
Register No.______________ E.M.R.No._________________________
Page No.__________________________
Name and Address of Consumer_____________ Name of Division____________________
_______________________________________ Name of Sub Division________________
Account
No._____________________________ Sub Office_________________________
Date
of Checking_________________________ Type of Industry____________________
DETAIL
OF CHECKING
A.
METERING EQUIPMENT:
|
Particulars
|
Motive
Load Meters |
Light
Load Meter
|
|
|
KWH
|
KVAH
|
MDI
|
KWH
|
|
1.
Meters
i)
Make and Type
ii)Capacity'iii)Rev/KWH
iv)Sr,No./Guide
No
v)
Meter Readings
2.
C.T.Ratio
3.
P.T. Ratio
4.
Seals
i)
MCB
ii)
MTC
iii)
M&T
iv)
Spot Welding
v)
MDI
vi)
CT Chamber
vii)
PT Chamber
5. Working of
a)
Meters
b)
CT
c)
PT
|
|
B.
CAPACITORS
|
|
Note:- If the metering equipment consists of KWH, KVAH, MDI, CTs and PTs,
complete particulars of each of the unit should be checked and noted on
the back of the format. Deficiencies
and defects, if any, should be noted. If any of the seal is missing or doubtful, it should be noted down
in the Inspection Report.
|
|
C. CONNECTED LOAD (INDUSTRIAL/GENERAL LOAD)
|
|
Purpose Capacity/Make Dimensions/Size
(Where required)
|
|
|
| |
|
|
|
|
Total connected load detected________________________ KW
Sanctioned Connected load__________________________ KW
Unauthorized extension______________________________KW
Other observation, if any, of Inspecting
Officer.
Signature of the Signature of the
Checking officer
Consumer/his representative with name and designation.
PSEB CS-14 Book
No.___________
PUNJAB STATE ELECTRICITY BOARD
OFFICE:______________________________
METER
CHANGE ORDER
Sr.No.______________
Date:__________________
Consumer's
Name:___________________________
Address:_________________________________________________
Account
No.____________________
Category:_______________________
Load(KW):_______________________
To,
Sh._____________________
JE.AAE/AE/AEE
Please
change meter on premises of above consumer and report below,______ AE/AEE/XEN(Ops)________________dated________________
REPORT
|
METER
INSTALLED (KWH METER) |
METER REMOVED
(KWH METER)
|
|
No_______________
|
Phase___________
|
No________________
|
Phase________
|
|
Amps_____________
|
Volts____________
|
Amps______________
|
Volts_________
|
|
Reading________________________________
|
Reading_____________________________
|
|
Meter Installed(Size)______________________
|
Meter Removed(Size)__________________
|
|
KVAH METER
|
KVAH METER
|
|
No_______________
|
Phase___________
|
No________________
|
Phase________
|
|
Amps_____________
|
Volts____________
|
Amps______________
|
Volts_________
|
|
Reading________________________________
|
Reading_____________________________
|
|
Meter Installed(Size)______________________
|
Meter Removed(Size)__________________
|
|
Store requisition
No.& Date_________________
|
Reason for Change
|
|
Entered in Meter
Movement Card
|
________________
|
Entered in Meter
Movement Card
|
_____________
|
|
Changed
by____________________________
|
Date_______________
|
Time_________
|
Details
of CT's: Make & S.No. of CTs__________, CT
Ratio:____________.
Meter
Card/Cards has/have been duly completed by me and kept with Meter/Meters in the
presence of the consumer of his representative Sh._______________________________
Meter Sealing Item
No.___________________Date_________________________________
(Consumer's
Signature)__________________________________
______________________________Junior
Engineer________________Date____________
CHARGES
(In
accordance with item 2 of the Schedule of General Charges if the meter had been
removed or had its position changed at the request of the consumer, the consumer
be debited with Rs.__________________per meter)
Above consumer is to be debited with Rs.___________________________________
AE.AEE.XEN(Ops)______________________________________-
Above
charge entered in Sundry Charges and allowances Register Page No________
Consumer
Clerk_______________________date___________________________
PSEB CS-15 Book
No.___________
PUNJAB STATE ELECTRICITY BOARD
OFFICE:______________________________
METER
TERMINAL COVER/METER CUP BOARD SEAL ETC.
REPLACEMENT
ORDER
Sr.No.______________
Date:__________________
Consumer's
Name:___________________________
Address:_________________________________________________
Account
No.____________________
___________________________________________________________________________
REPORT
1. Details of metering equipments _________________________________
(Meter, CT and PT Set etc)
of which seals were broken
2. No of seals broken
(with details MTC, MCB etc) _________________________________
Date________________________Time___________________
(Signature of
official with designation)
Consumer's
Signature_____________________
Recoverable
Amount
Debit Rs.__________________as per Schedule of General & Service
Connection Charges, to the consumers account.
The above recoverable amount has been entered in the sundry charges and
allowances register page No.______________________Sr.No.______________________
RA/ARA_________________
PSEB CS-16
PUNJAB STATE ELECTRICITY BOARD
DISCONNECTION
ORDER
TEMPORARY/PERMANENT
OFFICE:_______________
Sr.No.______________
Date:__________________
Consumer's
Name:___________________________
Address:_________________________________________________
Account
No.____________________
Reason
for Disconnection
Amount
Due: SOP and other charges Rs.________ED Rs.______Octroi Rs.______________
TDCO
No.______________Date_____________________Effected on__________________
(To
be filled only in case of PDCO)
To
JE/AAE/AE/AEE
Please disconnect the above consumer Temporarily/Permanently from
the Board's Circuit and report below:-
____________________________AE/AEE/XEN(Ops)
______________Dt_______________
___________________________________________________________________________
REPORT
1)
Service(Overhead) Disconnected From T-junction/pole
2)
Meter(s) returned to Store and entered in ME-1/2 at Page
No._______________________
Item No._________________________
|
Equipment
|
Meter No
|
Meter Readings
|
Position of Seals
|
|
KWH
|
__________________
|
_________________
|
_______________
|
|
KVAH/Light
|
_________________
|
_________________
|
_______________
|
|
MDI
|
_________________
|
_________________
|
_______________
|
Entered in the Meter Movement
Card(PSEB form CS-21)
Disconnection made
by_________________________________
Date_____________________Time_______________________
Consumer's
Signature
______________________JE/AAE/AE/AEE__________________Date__________________
PSEB CS-17
PUNJAB STATE ELECTRICITY BOARD
RECONNECTION
ORDER
OFFICE:_______________
Sr.No.______________
Date:__________________
Consumer's
Name:___________________________
Account
No.____________________
Cause
of Disconnection_____________________________
PDCO
No. and Date_________________________Effected on________________________
To
JE/AAE/AE
Please reconnect the above consume and report below:-
______________________AE/AEE/XEN(Ops)_____________________Date_____________
___________________________________________________________________________
REPORT
1)
Service(Overhead) Disconnected From T-junction/pole
2)
Meter(s) returned to Store and entered in ME-1/2 at Page
No,.____________________
Item No._________________________
|
Equipment
|
Meter No
|
Meter Readings
|
Position of Seals
|
|
KWH
|
__________________
|
_________________
|
_______________
|
|
KVAH/Light
|
_________________
|
_________________
|
_______________
|
|
MDI
|
_________________
|
_________________
|
_______________
|
Reconnection made
by_________________________________
Date_____________________Time_______________________
Consumer's
Signature_______________________
______________________JE/AAE/AE/AEE__________________Date__________________
PSEB CS-18
PUNJAB STATE ELECTRICITY BOARD
SUNDRY
JOB ORDER
Book
No._______________Sr.No.______________
Date:__________________
Office:___________________________
Sundry Job
Order:_________________________________________________
Name
of Consumer:.___________________________________
Name of JE/AAE/AE/AEE__________________________________________
Please
carry out the following works and report compliance
Detail of works
____________________________________________________________________________________________________________________________________________________________________________________________________
Signature of AE/AEE/XEN______________________________
Report of the works carried out
Date of
Commencement_________________Date of Completion______________________
Detail of works______________________________________________________________
Name of the Feeder from
which the supply is
fed:_______________________________________________________
Feeding/Distribution
Transformer_________________________________________________
Meter
Reading_______________________________________________________________
M.S.R.No.__________________________________________________________________
Date of return of S.J.O.________________________________________________________
(Sign)______________________________________________________________________
(The official who executed
the work)
Signature of
Consumer.
Recoverable amount
(In case the work is
executed on the request of the consumer).
PSEB CS-20
PUNJAB STATE ELECTRICITY BOARD
Office:____________________
METER
CARD
(Keep
with the meter)
Consumer's A& A
No.:___________________________A/c.No._______________________
Address:_________________________________________________
Meter
No.____________________ Meter Type-1-Phase/3-Phase______________________
Make_____________________________Date
of Installation__________________________
Amps____________________________Volts______________________________________
|
Date
|
Meter Reading
|
Consumption
|
Dated
Signature
|
|
|
|
|
Meter Reader
|
Meter Inspector/ JE/AAE/AE/XEN.
|
|
|
|
|
|
|
Notes: 1. This card is to be printed on thick paper.
2. Columns to be printed on reverse side also.
Such
industry which is not covered in Red Category or Hazardous Category is to be
treated as Industry under Green Category.